This document contains a schedule of material submittals and specifications for electrical repair work on two buildings at a federal facility. The schedule lists thirteen required submittals for repairing the electrical service building, including safety plans, switchboards, receptacles, conductors, panels, and completion forms. Submission dates are specified as being ten days after notice to proceed or project closeout. Also included is a separate schedule for electrical repairs at a cold storage building, which is left blank to be filled in by the project engineer.

The related federal contract opportunity is a solicitation issued by the Department of the Air Force Air Mobility Command for an electrical indefinite-delivery/indefinite-quantity contract. No other details are provided about the opportunity.

Material Submittal List

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSRepair electrical service building 6039 Jun 26, 2019SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEER RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Safety Plan (2 copies)10 days After Award
2SwitchboardXXXXXX10 days After NTP
4125v, duplex receptaclesXXXXXX10 days After NTP
5Receptacle and junction boxesXXXXXX10 days After NTP
`
8copper coductor sizesXXXXXX10 days After NTP
9Conduct sizes and connectorsXXXXXX10 days After NTP
10Ground RodsXXXXXX10 days After NTP
11Electrical PanelsXXXXXX10 days After NTP
12Jersey Central Power fee propposalXXXXXX10 days After NTP
Submit to Gov. for appoval
13Completd Form 135410 days After Closeout
1150A ,250v, 1p and 50A 2p breakerXXXXXX10 days After NTP

Sheet2

SCHEDULE OF MATERIAL SUBMITTALSRepair Electric bldg. 3140 (cold storage)HEKP-17-1030
TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEER RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Sheet3

File details come from the government source that posted it. Updated .