This document contains a schedule of material submittals and specifications for electrical repair work on two buildings at a federal facility. The schedule lists thirteen required submittals for repairing the electrical service building, including safety plans, switchboards, receptacles, conductors, panels, and completion forms. Submission dates are specified as being ten days after notice to proceed or project closeout. Also included is a separate schedule for electrical repairs at a cold storage building, which is left blank to be filled in by the project engineer.
The related federal contract opportunity is a solicitation issued by the Department of the Air Force Air Mobility Command for an electrical indefinite-delivery/indefinite-quantity contract. No other details are provided about the opportunity.
Material Submittal List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA448419RA002_Electrical_IDIQ_Q&A.pdf | ||
| C-2_Ordering_Procedures.pdf | ||
| L-1_Instructions_to_Offerors.pdf | ||
| FA448419RA0020002.pdf | ||
| L-1_Instructions_to_Offerors_(Updated).pdf | ||
| Solicitation_Amendment_FA448419RA0020001.pdf | ||
| SOW_2019_Rev_1.pdf | ||
| ppi_tool.accdb | MDB file | |
| J-9_JB-MDL_SFS_Appendix.PDF | ||
| J-3_JB-MDL_6039BidSchedule.pdf | ||
| J-7_JB-MDL_Burlington_WD_NJ20180027.pdf | ||
| J-6_JB-MDL_Environmental_Compliance_Statement.pdf | ||
| J-5_JB-MDL_Past_Performance_Questionnaires.pdf | ||
| J-2_JB-MDL_Drawings_Bldg_6039.PDF | ||
| Section_L_Attachment_X.pdf | ||
| FA448419RA002_Solicitation.pdf | ||
| J-1_JB-MDL_6039SOW.pdf | ||
| C-1_JB-MDL_Statement_of_Work.pdf | ||
| J-10_JB-MDL_AntiterrorismStatement.pdf | ||
| J-4_A1_-PP_Cover_Letter.pdf | ||
| J-8_OCEAN_WD_WD_NJ20180039.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | Repair electrical service building 6039 Jun 26, 2019 | SOLICITATION/CONTRACT NUMBER | |
| TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEER RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||||||||||
| RESUBMITTAL | FINAL | |||||||||||
| APPROVAL | REMARKS | |||||||||||
| APPROVED | DISAPPROVED | |||||||||||
| 1 | Safety Plan (2 copies) | 10 days After Award | ||||||||||
| 2 | Switchboard | X | X | X | X | X | X | 10 days After NTP | ||||
| 4 | 125v, duplex receptacles | X | X | X | X | X | X | 10 days After NTP | ||||
| 5 | Receptacle and junction boxes | X | X | X | X | X | X | 10 days After NTP | ||||
| ` | ||||||||||||
| 8 | copper coductor sizes | X | X | X | X | X | X | 10 days After NTP | ||||
| 9 | Conduct sizes and connectors | X | X | X | X | X | X | 10 days After NTP | ||||
| 10 | Ground Rods | X | X | X | X | X | X | 10 days After NTP | ||||
| 11 | Electrical Panels | X | X | X | X | X | X | 10 days After NTP | ||||
| 12 | Jersey Central Power fee propposal | X | X | X | X | X | X | 10 days After NTP | ||||
| Submit to Gov. for appoval | ||||||||||||
| 13 | Completd Form 1354 | 10 days After Closeout | ||||||||||
| 11 | 50A ,250v, 1p and 50A 2p breaker | X | X | X | X | X | X | 10 days After NTP |
Sheet2
| SCHEDULE OF MATERIAL SUBMITTALS | Repair Electric bldg. 3140 (cold storage) | HEKP-17-1030 | |
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEER RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | |||
| APPROVED | DISAPPROVED | |||
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 |
Sheet3
File details come from the government source that posted it. Updated .