This document contains drawings and specifications for an electrical upgrade project at Building 6039. The project involves removing an existing plaster ceiling to install new ceiling grids and panels, adding 20-amp quadplex receptacles in the equipment and reception areas with dedicated 20-amp circuits, verifying and transferring live circuits from various panels to a new switchboard and panels, installing outdoor electric metering per the local utility's requirements, and other electrical work. The related federal contract opportunity is a Department of the Air Force solicitation for an indefinite-delivery/indefinite-quantity electrical contract to provide services such as those outlined in the project documents.

J-2_JB-MDL_Drawings_Bldg_6039

View the file

Other files for this federal contract opportunity

Other files attached to Electrical IDIQ, newest first.
File Type Posted
L-1_Instructions_to_Offerors.pdf PDF
FA448419RA0020002.pdf PDF
C-2_Ordering_Procedures.pdf PDF
FA448419RA002_Electrical_IDIQ_Q&A.pdf PDF
Submittal_List_B6039.xls XLS spreadsheet
L-1_Instructions_to_Offerors_(Updated).pdf PDF
SOW_2019_Rev_1.pdf PDF
Solicitation_Amendment_FA448419RA0020001.pdf PDF
ppi_tool.accdb MDB file
J-1_JB-MDL_6039SOW.pdf PDF
C-1_JB-MDL_Statement_of_Work.pdf PDF
J-10_JB-MDL_AntiterrorismStatement.pdf PDF
J-4_A1_-PP_Cover_Letter.pdf PDF
J-8_OCEAN_WD_WD_NJ20180039.pdf PDF
J-9_JB-MDL_SFS_Appendix.PDF PDF
J-3_JB-MDL_6039BidSchedule.pdf PDF
J-7_JB-MDL_Burlington_WD_NJ20180027.pdf PDF
J-6_JB-MDL_Environmental_Compliance_Statement.pdf PDF
FA448419RA002_Solicitation.pdf PDF
J-5_JB-MDL_Past_Performance_Questionnaires.pdf PDF
Section_L_Attachment_X.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

A

B

74"

4"

30"

36"

ELECTRICAL NOTES:

1. CONTRACTOR SHALL REMOVE THE EXISTING PLASTER CEILING FOR ELECTRICAL WORK AND

FINISH AND INSTALL 2'X2' CEILING GRIDS AND 2'X2' CEILING PANELS.

2. IN THE EQUIPMENT ROOM, CONTRACTOR SHALL PROVIDE 5 EACH 20A, 125V QUADRUPLEX

RECEPTACLES. EACH RECEPTACLE SHALL BE IN DEDICATED 20A CIRCUIT. COORDINATE WITH

USING AGENCY FOR EXACT LOCATION. SEE PANEL “B” SCHEDULE.

3. IN THE RECEPTION AREA, CONTRACTOR SHALL PROVIDE 5 EACH 20A, 125V QUADRUPLEX

RECEPTACLES. EACH RECEPTACLE SHALL BE IN DEDICATED 20A CIRCUIT. COORDINATE WITH

USING AGENCY FOR EXACT LOCATION. SEE PANEL “B” SCHEDULE.

4.RECONNECT EXISTING PANEL “E” IN THE NEW PANEL “B”. SEE PANEL SCHEDULE B. PROVIDE

CONDUITS AND WIRES AS REQUIRED.

5. THE PANEL SCHEDULES AND SWITCHBOARD SHOWN ON DRAWINGS ARE FOR BIDDING PURPOSE

ONLY. CONTRACTOR SHALL VERIFY AND RESPONSIBLE TO TRANSFER ALL LIVE CIRCUITS FROM

MAIN DISTRIBUTION PANEL ( MDP ) TO NEW SWITCHBOARD AND FROM EXISTING PANELS

P3,P4,P5,P6,P7, AND P8 NEW PANELS C, D, F, G AND I. CONTRACTOR SHALL VERIFY ALL THE

CIRCUIT BREAKERS NEEDED BEFORE ORDERING THE SWITCHBOARD AND ELECTRICAL PANELS.

PROVIDE JUNCTION BOXES AND EXTEND CONDUITS AND WIRES IF NECESSARY.

6. PROVIDE 4" CONCRETE PAD FOR ALL SWITCH BOARD.

7. CONTRACTOR SHALL COORDINATE WITH JCP&L TO TURN OFF POWER BEFORE REPLACING THE

SWITCHBOARD AND CUTTING THE EXISTING CONCRETE PADS.

8. ALL WIRE SHALL BE COPPER AND SHALL BE IN CONDUITS.

9. MAIN BREAKER IS TO BE FACTORY INSTALLED FOR ALL NEW SWITCHBOARD AND PANEL (BUS

BAR SHALL BE COPPER).

10. CONTRACTOR SHALL INSTALL OUTDOOR ELECTRIC METERING SYSTEM IN ACCORDANCE WITH

JCP&L REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL JCP&L FEES.

11. PROVIDE 150A, 3 POLE CIRCUIT BREAKER IN EACH PANEL C AND D FOR PANEL F AND G. PANEL

F AND G SHALL BE 150A, 3 PHASE , 42 CIRCUITS.

12. CONTRACTOR SHALL TRANSFER ALL EXISTING CIRCUITS FROM EXISTING PANEL P1 AND P2 TO

NEW PANEL H. PANEL H SHALL BE RETROFITTED (RECESSED) 600A, 3 PHASE . MAIN BREAKER

FACTORY INSTALL. CONTRACTOR SHALL VERIFY ALL THE CIRCUIT BREAKERS NEEDED BEFORE

ORDERING THE ELECTRICAL PANEL. PROVIDE JUNCTION BOXES AND EXTEND CONDUITS AND

WIRES IF NECESSARY.

13. CONTRACTOR SHALL NOTIFY THE POST OFFICE BUILDING MANAGER FOR POWER OUTAGE.