J-1_JB-MDL_6039SOW.pdf

PDF 20 KB Posted

Attached to
Electrical IDIQ Federal contract opportunity
Solicitation number
FA448419RA002
Issued by
Department of the Air Force Air Mobility Command

About this file

This scope of work document outlines electrical repair and installation requirements for building 6039 at an unspecified location. The contractor shall remove an existing ceiling for electrical work, install new ceiling grids and panels, provide 20 new 20-amp quadruplex receptacles in equipment and reception areas, reconnect an existing electrical panel and transfer circuits from various panels to new panels, install a new 600-amp electrical panel, extend conduit and wiring as needed, reconnect outdoor condensing units, remove unused equipment, and submit installer qualifications and product data. The contractor must verify site conditions, comply with applicable codes, notify staff of power shutoffs, and coordinate work with the quality assurance representative.

J-1_JB-MDL_6039SOW

View the file

Other files for this federal contract opportunity

Other files attached to Electrical IDIQ, newest first.
File Type Posted
FA448419RA002_Electrical_IDIQ_Q&A.pdf PDF
C-2_Ordering_Procedures.pdf PDF
L-1_Instructions_to_Offerors.pdf PDF
FA448419RA0020002.pdf PDF
Submittal_List_B6039.xls XLS spreadsheet
L-1_Instructions_to_Offerors_(Updated).pdf PDF
Solicitation_Amendment_FA448419RA0020001.pdf PDF
SOW_2019_Rev_1.pdf PDF
ppi_tool.accdb MDB file
J-9_JB-MDL_SFS_Appendix.PDF PDF
J-3_JB-MDL_6039BidSchedule.pdf PDF
J-7_JB-MDL_Burlington_WD_NJ20180027.pdf PDF
J-6_JB-MDL_Environmental_Compliance_Statement.pdf PDF
J-5_JB-MDL_Past_Performance_Questionnaires.pdf PDF
J-2_JB-MDL_Drawings_Bldg_6039.PDF PDF
Section_L_Attachment_X.pdf PDF
FA448419RA002_Solicitation.pdf PDF
C-1_JB-MDL_Statement_of_Work.pdf PDF
J-10_JB-MDL_AntiterrorismStatement.pdf PDF
J-4_A1_-PP_Cover_Letter.pdf PDF
J-8_OCEAN_WD_WD_NJ20180039.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Feb 22, 2018

SCOPE OF WORK

Repair Electrical Service in building # 6039

A. STATEMENT OF WORK: The contractor shall provide all labor, materials and equipment necessary to complete the following requirements in accordance with all commercial installation, local, state, and Federal codes and laws. The contractor shall perform a site survey prior to submitting their proposal.

1. Contractor shall remove the existing plaster ceiling for electrical work and finish and install 2’x2’ ceiling grids and 2’x2’ ceiling panels.

2. In the equipment room, contractor shall provide 5 each 20A, 125V quadruplex receptacles. Each receptacle shall be in dedicated 20A circuit. Coordinate with using agency for exact location. See panel “B” schedule.

3. In the reception area, contractor shall provide 5 each 20A, 125V quadruplex receptacles. Each receptacle shall be in dedicated 20A circuit. Coordinate with using agency for exact location. See panel “B” schedule.

4. Reconnect existing panel “E” in the new panel “B”. See panel schedule B.

Provide conduits and wires as required.

5. The panel schedules and switchboard shown on drawings are for bidding purpose only. Contractor shall verify and responsible to transfer all live circuits from main distribution panel ( MDP ) to new switchboard and from existing panels P3,P4,P5,P6,P7, and P8 new panels C, D, F,G and I. Contractor shall verify all the circuit breakers needed before ordering the switchboard and electrical panels.

Provide junction boxes and extend conduits and wires if necessary.

6. Provide 4" concrete pad for all switch board.

7. Contractor shall coordinate with JCP&L to replace pad mounted transformer and to turn off power before replacing the switchboard and cutting the existing transformer concrete pads.

Notify Post office building manager for power outage.

8. Contractor shall furnish and install current transformer and metering socket. The metering equipment shall meet JCP&L requirements. Coordinate with JCP&L for metering equipment locations.

9. Main breaker is to be factory installed for all new switchboard and panel (bus bar shall be copper). All wires shall be in conduits.

10. Contractor shall install outdoor electric metering system in accordance with JCP&L requirements. Contractor shall be responsible to pay all JCP&L fees.

11. Provide 150A, 3 pole circuit breaker in each panel C & D for panel F & G. Panels F , G and I shall be 150A, 3 phase, and 42 circuits.

12. Contractor shall transfer all existing circuits from existing panels P1 & P2 to new panel H. Panel H shall be retrofitted (recessed) 600A, 3 phase panel (panel P1 replacement). Main circuit breaker factory install. Contractor shall verify all the circuit breakers needed before ordering the electrical panel. Provide junction boxes and extend conduits and wires if necessary.

13. Provide two additional ground rods, (one for the existing transformer and one for the new switchboard). Connect 2/0 copper bare wires from main switchboard to metal building structure.

14. Contractor shall reconnect all outdoor condensing units to new switchboard.

Extend conduits and wires as required.

15. Contractor shall remove all unused conduits and wires.

16. The Contractor shall submit:

a. Installer’s Qualifications.

b. Product Data: Provide manufacturer’s product data for each material and technical literature for approval.

c. Closeout Submittals: Manufacturer’s Warranty.

B. GENERAL REQUIREMENTS:

17. Contractor shall check and verify all conditions and dimensions at the jobs site before proceeding with the work. The contractor shall report all discrepancies to the Q.A.R prior to beginning any work.

18. All work performed under this contract shall be in accordance with the latest edition of NFPA, NEC, NESC, and all applicable state and local codes.

19. All penetrations throughout fire rated spaces shall be fire stopped. Fire stopping material shall be U.L. listed for require fire rating.

20. Contractor shall notify the Q.A.R. or project manager a minimum of 72 hours to shutting down the building electric.

21. Fire Prevention: The contractors operations shall comply with all requirements of the installation fire prevention standards, Army Regulations, most current issue of the National Fire Codes, and the Fire Chief. All open flame/hot work or disconnection of fire protection alarms or suppression systems requires prior approval of the Fort Dix Fire Prevention Bureau at (609) 562-5484/6430/3351.

22. The Contractor shall coordinate with the QAR before starting work each day to ensure there are no conflicts of operation.

END OF SECTION