This document is an amendment to a solicitation for an electrical indefinite delivery, indefinite quantity (IDIQ) multiple award contract from the Department of the Air Force Air Mobility Command. The solicitation seeks proposals for a base year and four option years to provide electrical services at Joint Base McGuire-Dix-Lakehurst in New Jersey, with a maximum total value of $66 million across all awards. The agency intends to make three awards as a total small business set-aside. Offerors must submit responses to the amended solicitation, past performance questionnaires, and pricing for a sample $100,000 to $250,000 seed project. Proposals are due by July 12, 2019, with the seed project to be awarded to the lowest-priced offeror and orientation tasks for the other two awardees. The amendment provides updated instructions, terms, and evaluation criteria related to the solicitation and resulting IDIQ contracts.
Solicitation Amendment FA448419RA0020001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA448419RA002_Electrical_IDIQ_Q&A.pdf | ||
| C-2_Ordering_Procedures.pdf | ||
| L-1_Instructions_to_Offerors.pdf | ||
| FA448419RA0020002.pdf | ||
| SOW_2019_Rev_1.pdf | ||
| Submittal_List_B6039.xls | XLS spreadsheet | |
| L-1_Instructions_to_Offerors_(Updated).pdf | ||
| ppi_tool.accdb | MDB file | |
| J-5_JB-MDL_Past_Performance_Questionnaires.pdf | ||
| J-2_JB-MDL_Drawings_Bldg_6039.PDF | ||
| Section_L_Attachment_X.pdf | ||
| FA448419RA002_Solicitation.pdf | ||
| J-1_JB-MDL_6039SOW.pdf | ||
| C-1_JB-MDL_Statement_of_Work.pdf | ||
| J-10_JB-MDL_AntiterrorismStatement.pdf | ||
| J-4_A1_-PP_Cover_Letter.pdf | ||
| J-8_OCEAN_WD_WD_NJ20180039.pdf | ||
| J-9_JB-MDL_SFS_Appendix.PDF | ||
| J-3_JB-MDL_6039BidSchedule.pdf | ||
| J-7_JB-MDL_Burlington_WD_NJ20180027.pdf | ||
| J-6_JB-MDL_Environmental_Compliance_Statement.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The Purpose of This Amendment Is: The purpose of this amendment is to:
A. Updated section L and M and simplified PPI tool submission instruction. The PPI Tool ( EZ source) is a Microsoft Access program.
b. Add revised statement of work and material submittal list.
C. Change block 10 to clarify that the questions are due " 10 business days" before RFP closing
D. All other terms and conditions remain the same.
*****SEE SUMMARY OF CHANGES*****
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Contract Description A. Project Title: Electrical
Indefinite Delivery Indefinite Quantity at Joint Base McGuire Dix Lakehurst (JB MDL), New Jersey (NJ).\nB. Government anticipates three (3) multiple awards. This acquisition is a Total Small Business Set- Aside.\nC. All questions must be submitted NLT 10 days prior to RFP closing date.\nD.
Project Performance Period: a Base Year and four (4) Option Years and an optional six (6) month extension.\nE. Do not add pricing in Section B. Enter prices on Attachment J-3, Price Schedule.\nF. Reference Section L, â##Instructions, Conditions, and Notices to Offerors or Respondentsâ## and Section M, â##Evaluation Factors for Award,â## for proper proposal preparation.\nG. Guaranteed minimum of $500 will be met via contractor's participation in Orientation Seminar. However, the winning contractor of the seed project will automatically have satisfied\nthe minimum dollar amount and will not receive $500 for attending the seminar.\nH. Total aggregate maximum amount expendable
A. Project Title: Electrical Indefinite Delivery Indefinite Quantity at Joint Base McGuire Dix Lakehurst (JB MDL), New Jersey (NJ).\nB. Government anticipates three (3) multiple awards. This acquisition is a Total Small Business Set-Aside.
\nC. All questions must be submitted NLT 10 business days prior to RFP closing date.\nD.
Project Performance Period: a Base Year and four (4) Option Years and an optional six (6) month extension.\nE. Do not add pricing in Section B. Enter prices on Attachment J-3, Price Schedule.\nF. Reference Section L, â##Instructions, Conditions, and Notices to Offerors or Respondentsâ## and Section M, â##Evaluation Factors for Award,â## for proper proposal preparation.\nG. Guaranteed minimum of $500 will be met via contractor's participation in Orientation Seminar. However, the winning contractor of the seed project will automatically have satisfied\nthe minimum dollar amount and will not receive $500 for attending the seminar.\nH. Total aggregate maximum amount expendable
FA448419RA0020001
under all electrical contracts awarded shall not exceed $66 million.\nI. Seed project site visit will be held 26 Jun 2019 at 9:00 am (EDT) at Bldg 2402, Vandenberg Ave, Joint Base- MDL, NJ 08641-5104.J. Sections K, L and M will not be a part of any\nresultant contract.\nJ. Past Performance evaluation package is due by 3PM EST on 12 Jul 2019.\nK. Magnitude of the Seed Project is between $100,000 and $250,000.\nL. NAICS Code is 238210. SB size standard is $15 million.
under all electrical contracts awarded shall not exceed $66 million.\nI. Seed project site visit will be held 26 Jun 2019 at 9:00 am (EDT) at Bldg 2402, Vandenberg Ave, Joint Base- MDL, NJ 08641-5104.J. Sections K, L and M will not be a part of any\nresultant contract.\nJ. Past Performance evaluation package is due by 3PM EST on 12 Jul 2019.\nK. Magnitude of the Seed Project is between $100,000 and $250,000.\nL. NAICS Code is 238210. SB size standard is $15 million.
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L-1 GENERAL INSTRUCTIONS
L-1.1 This is an all-electronic solicitation release. Hard copies are not available. The Government will post all information pertaining to the solicitation and award of this requirement to the Electronic Posting System, also known as FedBizOpps (www.fbo.gov). It is the responsibility of each offeror to review the web page for postings of amendments, updates or changes to current information.
L-1.2 Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award.
Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
L-1.3 Communications: Exchanges of source selection information between Government and offerors will be controlled by the Contracting Officer. Prospective offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the seed project and terms and conditions of the solicitation. Questions received, in writing, and subsequent answers will be posted to FedBizOpps. Offerors are encouraged to submit in writing all questions and requests for clarifications no less than ten (10) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than ten (10) days prior to the RFP closing shall be at the sole discretion of the contracting officer. Failure of a prospective offeror to submit any questions or attend the conference will be construed to mean that the prospective offeror fully understands all requirements of the solicitation.
L-1.4 Joint Venture Offerors: If the offeror is a joint venture, the offeror shall provide all required solicitation information for all parties including a copy of the joint venture agreement with proposal.
The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the joint venture. If the joint venture is comprised of 8(a) firms, the Small Business Administration (SBA) must approve the joint venture agreement prior to award. Either party to the joint venture may submit performance information on behalf of the joint venture. Joint venture performance will be evaluated and rated based on either party's performance.
The Small Business Administration (SBA) must receive Joint Venture Agreements prior to proposal due date and approved before award of a resulting contract. If a joint venture is contemplated, then the assigned SBA Business Opportunity Specialist (BOS) must be advised as soon as possible.
Ensure the agreement is submitted to the BOS in sufficient time to permit a regulatory compliance review. Any corrections and/or changes requested must allow for review time by the BOS before the proposal due date. No corrections and/or changes are permitted after the time for submission of offers.
L-1.5 Teaming/Partnering Offerors: If the offer is based on a teaming/partnering relationship, the offeror shall provide all required solicitation information for all parties including a copy of the teaming/ partnership agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering relationship.
L-1.6 Multiple Companies: If a company has multiple business ventures, only one of their business ventures will be allowed to submit a proposal. The intent of the Electrical IDIQ program is to receive multiple offers with independently prepared proposals that foster competition.
L-1.7 Mentor/Protege Program: For information regarding the Small Business Administration's (SBA) Mentor-Protege Program see: http://www.sba.gov/.
L-1.8 Incurred Expenses: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
L-1.9 In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals and will destroy all extra copies. No destruction certificate will be provided.
L-1.10 All proposals must be complete, and respond directly to the requirements of this solicitation.
Any commitments made in the proposal shall become a part of the resultant contract. Failure to comply with these instructions may result in the Government summarily rejecting the offeror's proposal.
L-1.11 The seed project, price proposal, contract forms, performance references and offeror information shall include the documentation listed below. The price proposal must be based on the offeror's proposal for the seed project as set forth in the task order solicitation documents (see Section J, Attachments J-1 through J-3. The government will evaluate the proposal in accordance with Section M.
L-2 PROPOSAL PREPARATION INSTRUCTIONS
L-2.1 Volume Organization: Proposals shall be submitted electronically to the Government in three (3) separate volumes as set forth below:
Volume Description Copies Reference Paragraph
I Contract Documents 1 L-2.2.1
II Past Performance 1 L-2.2.3
III Price 1 L-2.2.4
L-2.1.1 Page Requirements: Page sizes should be 8.5-inch by 11-inch excluding any drawings, diagrams, and/or supporting illustrations, spreadsheets, etc. Margins shall be no smaller than 1-inch and each page within a volume shall be numbered consecutively. All font shall be Times New Roman, black, and the size shall be no smaller than 12 point. Each page containing proprietary information should be so marked. Elaborate formats or color presentations are not desired or required. Number of pages is limited to 20 for Volume II Past Performance.
L-2.1.2 Headers: The only information permitted in the headers of sanitized pages is the solicitation number.
L-2.1.3 Footers: The only information permitted in the footers of sanitized pages is the number of pages and "SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104" and "FOR
OFFICIAL USE ONLY."
L-2.1.4 Cover Pages: A cover sheet containing the solicitation number, volume and title, copy type (sanitized or unsanitized), and offeror name shall be included for each volume.
L-2.2 Volume Content
L-2.2.1 Volume I - Contract Documents
L-2.2.1.1 SF1442 and Solicitation: Complete Blocks 14 - 16 and 19 - 20 (A - C) of SF1442 and all fill-in clauses in solicitation Sections G and I - K.
L-2.2.1.2 SF30, Amendment Form: Complete Blocks 8 and 15 (A - C) for each amendment issued under this solicitation.
L-2.2.1.3 Clauses and Provisions: Offerors shall complete all areas contained in Administrative Data of Section G, FAR Provision 52.219-28 in Section I, FAR Provisions 52.204-8 and 52.209-7 in Section K, and all other clauses and provisions, including exceptions or deviations, within Sections I, K, and L, as applicable to the offeror.
L-2.2.1.4 Proposal Guarantee (Bid Bond): Bonds shall be submitted electronically with proposals in the amount of 20% of the proposed seed project price in accordance with FAR Clause 52.228-1 found in Section I of this solicitation. Offerors shall ensure all seals and signatures are plainly visible in electronically-submitted bonds.
L-2.2.1.5 Joint Ventures and Teaming / Partnering Agreements: Joint ventures and teaming or partnering agreements must be disclosed and comply with Section K and Section L, paragraphs L-1.4 or L-1.5, as applicable, of the solicitation.
L-2.2.3 Volume II - Past Performance
L-2.2.3.1 Past Performance: The electronic output product of the PPI Tool will constitute Volume II of your proposal.
L-2.2.3.2 Past Performance Questionnaires: The offeror will provide the government furnished questionnaire ("Past Performance Questionnaire") to those federal agencies and commercial customers whose performances are deemed recent and relevant and direct them to return the completed questionnaires to the point of contact listed on the questionnaire. The evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have recent, relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. Up to five (5) Past Performance Questionnaires, Solicitation Attachment J-5, can be submitted for the offeror or each joint venture member, as applicable, for contracts or orders performed for Federal agencies and commercial customers within the past three (3) years from the solicitation date (SF1442 Block 3). Project references similar in scope, magnitude, and complexity, to the seed project are highly preferred.
NOTE: PAST AND PRESENT PERFORMANCE QUESTIONNAIRES WILL NOT BE ACCEPTED
FROM THE OFFEROR; IT MUST BE SUBMITTED BY THE RATER. IT IS THE RESPONSIBILITY
OF THE OFFEROR TO FOLLOW UP WITH THE RATER IN ORDER TO ENSURE PAST AND
PRESENT PERFORMANCE QUESTIONNAIRES ARE SUBMITTED TO THE GOVERNMENT.
L-2.2.4 Volume III - Price: Submit a completed copy of Solicitation Attachment J-3, Seed Project Price Schedule.
L-3 Past Performance Information (PPI) for Offerors EZSource: See section L Attachment X.
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been modified to:
M-1.1 This competitive acquisition will utilize the Tradeoff source selection procedures in accordance with Federal Acquisition Regulation (FAR) Part 15.3, Department of Defense (DOD) Source Selection Procedures, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3, and AFFARS Mandatory Procedures (MP) 5315.3 to make an integrated assessment for a best value award decision. In using the best value approach, the Government seeks to award to the offerors who give the Air Force the greatest confidence that each will best meet or exceed our requirements affordably and in a way that will be advantageous to the Government. To arrive at a best value decision, the SSA will integrate the source selection team's evaluations of the factors described in this provision. While the Government will strive for maximum objectivity, the tradeoff process, by its nature, is subjective; therefore, professional judgment is implicit throughout the selection process.
Award will be made to the responsible offerors whose proposal conforms to all required terms and conditions, includes all required representations and certifications, meets all requirements set forth in the RFP, and also provides the best value to the Government based on the results of the evaluation as described in paragraph M-2 below.
The Government intends to award three (3) contracts as a result of this solicitation. The government reserves the right to award fewer than or more than the stated number of contract awards.
M-1.2 Discussions: The Government intends to award without discussions, but reserves the right to conduct discussions if determined necessary. Any discussions will be conducted in accordance with FAR 15.306. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer, with the concurrence of the Source Selection Authority, may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. The competitive range, if required, may be reduced for purposes of efficiency pursuant to FAR 15.306(c)(2). Communications conducted to resolve minor or clerical errors shall not constitute discussions. The Contracting Officer reserves the right to award a contract without the opportunity for proposal revision. Offerors may be restricted to a short suspense (i.e., less than 24 hours) in responding to the Contracting Officer during any discussion period.
M-1.3 Rejection of Unreasonable Offers: The Government may reject any proposal that is evaluated to be unreasonable in terms of program commitments, or contract terms and conditions, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
M-1.4 Contractor Responsibility: In accordance with FAR 9.1, the Contracting Officer shall award contracts only to responsible vendors. No purchase or award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The Contracting Officer shall require acceptable evidence of the prospective contractor's current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangements that will be in existence at the time of contract award, to rent, purchase or otherwise acquire the needed facilities, equipment, services, materials, other resources or personnel. Consideration of a prime contractor's compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award. Pursuant to FAR 9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s). In the absence of information clearly indicating that the prospective contractor is responsible, the Contracting Officer shall make a determination of non-responsibility.
M-2 FACTORS AND RELATIVE IMPORTANCE
M-2.1 Factors: A detailed and complete analysis of each offeror's proposal shall be performed. The Government's evaluation shall be based on the following factors:
Factor 1: Past Performance
Factor 2: Price (Seed Project)
M-2.2 Relative Importance: Among the evaluation factors considered in the tradeoff decision, past performance history will be evaluated on a basis significantly more important than cost or price considerations.
M-3 EVALUATION PROCESS: The evaluation process shall begin with a compliance review to verify all proposals conform to the administrative requirements set forth in Section L, Paragraph L-2. All conforming proposals shall then be ranked by proposed price for the seed project from lowest to highest and then evaluated for past performance. If the three (3) lowest evaluated priced offerors are judged to have an overall "Substantial Confidence" performance rating, those offers represent the best value for the Government and three (3) awards from that group may be made, in order of price. If the three lowest priced evaluated offerors are not judged to have an overall "Substantial Confidence" performance rating, evaluations will continue (in ascending order by price) until three
(3) offerors are rated with "Substantial Confidence" or, until ten (10) offerors are evaluated. If less than three (3) are rated "Substantial Confidence", the Source Selection Authority shall then make an integrated assessment best value award decision on the three awardees. For the selection of potential On/Off Ramp Selectees (SSP Attachment 5) the evaluation criteria will continue as described above up to three (3) On/Off Ramp Selectees or until the list of competitive offers is exhausted. The On/Off Ramp Selectees will be notified via letter of their selection to be on ramped at a time to be determined. The offeror providing the lowest offer of the awardees will be awarded the seed project task order; the other awardees will be awarded task orders for an orientation seminar.
M-3.1 Past Performance Evaluation: The past performance evaluation considers each offeror's demonstrated recent and relevant record of performance in supplying products and services that meet the contract's requirements. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor's performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror. There are two (2) aspects to the past performance evaluation:
recency and relevancy. Past performance references and data of either party to a joint venture or teaming arrangement will be considered to apply equally to the joint venture or teaming arrangement.
M-3.1.1 Recency: To be determined recent, offerors may submit up to five (5) project references that have been awarded, completed, or are ongoing within three (3) years from the date of this solicitation (SF1442 Block 3). Past performance information that does not meet this requirement will not be evaluated.
M-3.1.2 Relevance: To be determined relevant, an effort must have an award value of no less than $100,000 and be similar in scope and complexity of seed project. Past performance of greater relevancy will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance. The relevance ratings in Table 3 below shall be used when assessing offeror's efforts.
Table 1 - Past Performance Relevance Ratings
Adjectival Rating Description
Very Relevant - Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present - past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant - Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present - past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
M-3.1.3 Performance Confidence Assessment: Efforts that are determined recent and relevant will then receive a confidence assessment rating in accordance with Table 2 below. If teaming partners/joint ventures both have prime contractor experience then their past performance rating will be equal to a prime contractor. If the teaming partners/joint ventures have no prime contractor past performance, the past performance will be rated lower. If a prime contractor submits past performance of a proposed subcontractor, the past performance information will be rated lower than if submitted for the prime. In the case of offerors for which there is no or limited information on past contract, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance. In this case, the offeror's past performance is unknown and a performance confidence rating of "Neutral" will be assigned. Confidence ratings of Substantial and Satisfactory confidence will be rated more favorably than a Neutral confidence rating.
Table 2. Performance Confidence Assessments
Rating Description
Substantial Confidence Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror's recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror's recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No recent/relevant performance record is available or the offeror's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
M-3.3 Price Evaluation: The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required.
However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
The government may use various price analysis techniques and procedures found in FAR Part 15.404-1(b) to ensure a fair and reasonable price.
ON/OFF RAMP INSTRUCTIONS:
1. This provision prescribes the process by which the Government will ensure an adequate number of contractors are available at all times to achieve effective competition on all task orders. The Government intends to maintain a pool of three (3) contractors with proven track records for competing and delivering quality construction projects. The On-Ramp contractors will be notified of on ramp selection at the time of award. The Government reserves the right to cancel prior to the anniversary of the program date if determined not to be in the best interest of the Government.
2. Awardees are expected, in good faith, to participate in task order competitions, and if successful, to deliver quality projects on time and within budget, to include management and supervision of subcontractors. If for any reason an awardee cannot participate in a competition, the awardee shall provide written notice to the Government of the reason(s) for non-participation prior to proposal due date. Before the exercise of any option period(s), the Government will evaluate each awardees' participation rate, reason(s) for non-participation, and performance evaluations for task orders completed or in progress. An awardee rated as Satisfactory may be renewed for the next option year.
Failure to participate in good faith and/or overall annual performance assessment rating of Marginal or Unsatisfactory may result in the awardee being off-ramped from the multiple award program. An off-ramp decision results in contract expiration on the anniversary date of the contract period or option period and no remaining option period(s) being exercised.
3. In the event awardee(s) are off-ramped within 30-months of the initial contract award, the Government will reserve the right to on-ramp contractor(s) whom responded to this solicitation and were selected as on-ramp contractors to maintain a pool of three (3) contractors. On-ramp contractors will be selected based on initial evaluation results from the basic multiple award solicitation in order of ranking. Selected on-ramp contractors will be subject to a performance validation review. Contractor(s) must be active in SAM and otherwise in compliance with the original multiple award solicitation. If found in compliance, the government will send written notice of its intent to on-ramp contractor with effective date of potential award. On-ramped contractors may be offered an IDIQ contract with an original guaranteed minimum and will be allowed to compete on future task order projects as an awardee.
4. The Government reserves the right to not utilize on-ramp procedures beyond the 30-month mark from initial awards. The original performance period for awardees is one (1) base period plus four (4) option years and a six (6) month option to extend services per FAR 52.217-8; no contract will extend beyond this limitation regardless of when a basic contract is awarded.
5. Annual Performance Review ("Off-Ramp): Ninety (90) days before the exercise of each option year, the Government shall perform an assessment of each IDIQ Contractors performance based on their current performance on task orders during the current contract period. The Government may extend the term of this contract by written notice to the Contractors who have performed a satisfactory job on executing task orders and have no major contract deficiencies. Notice of the option to extend the term of the contract shall be given to those Contractors within 15 days of contract expiration;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension. Annual Performance Review ratings are as follows:
Exceptional: To receive an Exceptional (E) rating, a contractor must have received (E) on 75% of their annual Contractor Performance Assessment Reporting System (CPARS) report for all issued task orders. This contractor exceeds many contract requirements with few minor problems on the project. Corrective actions are rated as "Highly Effective".
Very Good: To receive a Very Good (VG) rating, a contractor must have received (VG) on 75% of their annual Contractor Performance Assessment Reporting System (CPARS) report for all issued task orders. This contractor exceeds some contract requirements with some minor problems on the project. Corrective actions are rated as "Effective".
Satisfactory: To receive a Satisfactory (S) rating, a contractor must have received (S) on 75% of their annual Contractor Performance Assessment Reporting System (CPARS) report for all issued task orders. This contractor meets all contract requirements with some minor problems on the project.
Corrective actions are rated as "Satisfactory".
Marginal: To receive a Marginal (M) rating, a contractor must have received (M) on 75% of their annual Contractor Performance Assessment Reporting System (CPARS) report for all issued task orders. This contractor does not meet some contract requirements with serious (recovery still possible) problems on the project. The Contracting Officer shall make a determination regarding the continuance of any Contractor receiving a Marginal (M) rating. The Contractor may provide written documentation that identifies extenuating circumstances or a performance improvement plan for consideration by the Contracting Officer. Corrective actions are rated as "Marginally Effective; Not Fully Implemented".
Unsatisfactory: To receive an Unsatisfactory (U) rating, a contractor must have received (U) on 75% of their annual Contractor Performance Assessment Reporting System (CPARS) report for all issued task orders. A Contractor receiving an Unsatisfactory (U) rating may not be renewed for the next option year. This contractor does not meet most contract requirements with serious (recovery not likely) problems on the project. The Contracting Officer shall make a determination regarding the continuance of any Contractor receiving an UNSATISFACTORY (U) rating. The Contractor may be allowed to address via written documentation that identifies extenuating circumstances or a performance improvement plan for consideration by the Contracting Officer. Corrective actions are rated as "Ineffective".
| IDCode: |
| Page: 1 |
| Pages: 9 |
| AmendNo: 0001 |
| EffDate: 6/27/2019 |
| ReqNo: A001401 |
| ProjNo: TBD |
| IssCode: FA4484 |
| AdmCode: |
| IssuedBy: FA4484 87 CONS LGC |
CP 609 754 2413
2402 VANDENBERG AVE
JOINT BASE MDL, NJ 08641-5104
United States Jeremy Botkin, Email: jeremy.botkin@us.af.mil Telephone: 609-754-3008
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA448419RA002 |
| SolDate: 6/13/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE
| ContNameTitle: |
| CoNameTitle: Dana Deyampert |
Email: dana.deyampert@us.af.mil Telephone: 609-754-2717
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .