Food_Service_Draft_Solicitation_-_Modification_1_-_9_Dec_14.pdf
PDF 302 KB Posted
- Attached to
- Dix Full Food Service Federal contract opportunity
- Solicitation number
- FA4484-15-R-0005
About this file
FA4484-15-R-0005 Modification Document- 9 Dec 14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Food_Service_Solicitation_-_Amendment_3_Modification_15_Dec_14.pdf | ||
| Food_Service_Solicitation_-_Amendment_3-_15_Dec_14.pdf | ||
| Questions_and_Answers_-_15_Dec_14.pdf | ||
| Food_Service_Draft_Solicitation_-_Amendment_2_Modification_11_Dec_14.pdf | ||
| Food_Service_Draft_Solicitation_-_Amendment_1-_9_Dec_14.pdf | ||
| Food_Service_PWS_4_Dec_14_-_Revision_1.pdf | ||
| CBA_Supplement_-_2015.pdf | ||
| Questions_and_Answers_-_4_Dec_14.pdf | ||
| Site_Visit_Minutes_-_2_Dec_14.pdf | ||
| Dix_Food_Service_CBA_-_Feb_2014.pdf | ||
| Past_Perf_Questionnaire_22_Oct_14.docx | DOCX document | |
| Food_Service_Draft_Solicitation_-_FINAL_13_Nov_14.pdf | ||
| Food_Service_PWS_v4.0_6_Nov_14_-_FINAL.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Add FAR clause 52.208-9, Contractor Use of Mandatory Sources of Supply or Services (May 2014)
2. Add supplemental collective bargaining agreement dated 21 Nov 14.
3. Add SLINs 0004AG, 0004AH, 1004AG, 1004AH, 2004AG, 2004AH, 3004AG, 3004 AH, 4004AG, 4004AH.
4. Correct several CLIN/SLIN extended descriptions.
5. Replace original PWS dated 6 Nov 14 w ith PWS Revision 1 dated 4 Dec 14.
6. All other terms and conditions remain the same.
**SEE SUMMARY OF CHANGES**
1. CONTRACT ID CODE PAGE OF PAGES
J 1 49
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Dec-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4484-15-R-0005
X 9B. DATED (SEE ITEM 11)
13-Nov-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Dec-2014
CODE
87 CONS/LGC
2402 VANDENBERG AVE
JB MCGUIRE-DIX-LAKEHURST NJ 08641
FA4484 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4484-15-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AD
The CLIN extended description has changed from The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the
PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in
SLIN 0001AC. to The contractor shall provide a fixed price to perform the tasks required to close dining facility
5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 0001AC..
SUBCLIN 0002AD
the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 0002AC..
SUBCLIN 0004AD
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in SLIN 0004AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AC..
SUBCLIN 0006AD
The CLIN extended description has changed from The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. to The contractor shall provide a fixed price to open dining facility
5517 in accordance with the PWS..
SUBCLIN 1001AB
The CLIN extended description has changed from The contractor shall provide a fixed price for the
DAILY operation of dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN 1001AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN 1001AA.
SUBCLIN 1001AD
the tasks required to close dining facility 5610 for less than 30 days in accordance the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN 1001AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close
5610. The remaining 80% shall be captured in SLIN 1001AC..
SUBCLIN 1001AE
the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining
20% shall be captured in SLIN 1001AF..
SUBCLIN 1001AG
dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610.
The remaining 20% shall be captured in SLIN 0001AH. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 1001AH..
SUBCLIN 1001AH
dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610.
The remaining 80% shall be captured in SLIN 0001AG. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 1001AG..
SUBCLIN 1002AA
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 0002AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 1002AB..
SUBCLIN 1002AB
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 1002AA..
SUBCLIN 1002AC
the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 1002AD..
SUBCLIN 1002AD
the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 1002AC..
SUBCLIN 1002AE
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining
20% shall be captured in SLIN 1002AF..
SUBCLIN 1002AF
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 1002AE..
SUBCLIN 1002AG
dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904.
The remaining 20% shall be captured in SLIN 0002AH. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 1002AH..
SUBCLIN 1002AH
dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904.
The remaining 80% shall be captured in SLIN 0002AG. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 1002AG..
SUBCLIN 1003AA
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 0003AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 1003AB..
SUBCLIN 1003AB
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 0003AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 1003AA..
SUBCLIN 1003AC
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 1003AD..
SUBCLIN 1003AD
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986. The remaining 80% shall be captured in SLIN 0003AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 1003AC..
SUBCLIN 1003AE
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining
20% shall be captured in SLIN 1003AF..
SUBCLIN 1003AF
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 0003AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 1003AE..
SUBCLIN 1003AG
dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986.
The remaining 20% shall be captured in SLIN 0003AH. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 1003AH..
SUBCLIN 1003AH
dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986.
The remaining 80% shall be captured in SLIN 0003AG. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 1003AG..
SUBCLIN 1004AA
DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 0004AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 1004AB..
SUBCLIN 1004AC
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 1004AD..
SUBCLIN 1004AD
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in SLIN 0004AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 1004AC..
SUBCLIN 1004AE
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 1004AF..
SUBCLIN 1004AF
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 1004AE..
SUBCLIN 1006AD
dining facility 5610 in accordance with the PWS. to The contractor shall provide a fixed price to open dining facility
SUBCLIN 2001AA
DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 20% shall be captured in SLIN 0001AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 20% shall be captured in SLIN
2001AB..
SUBCLIN 2001AB
DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN 0001AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN
2001AA..
SUBCLIN 2001AC
the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 2001AD..
SUBCLIN 2001AD
the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the
PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in
SLIN 0001AC. to The contractor shall provide a fixed price to perform the tasks required to close dining facility
5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 2001AC..
SUBCLIN 2001AE
the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining
20% shall be captured in SLIN 2001AF..
SUBCLIN 2001AF
the tasks required to close dining facility 5610 for more than 30 days in accordance with paragraph 1.7.5.2 of the
PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in
SLIN 0001AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility
5610 for more than 30 days in accordance with paragraph 1.7.5.2 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 2001AE..
SUBCLIN 2001AG
dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610.
The remaining 20% shall be captured in SLIN 0001AH. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 2001AH..
SUBCLIN 2001AH
dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610.
The remaining 80% shall be captured in SLIN 0001AG. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 2001AG..
SUBCLIN 2002AA
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 0002AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 2002AB..
SUBCLIN 2002AB
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 2002AA..
SUBCLIN 2002AC
the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 2002AD..
SUBCLIN 2002AD
the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 2002AC..
SUBCLIN 2002AE
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining
20% shall be captured in SLIN 2002AF..
SUBCLIN 2002AF
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 2002AE..
SUBCLIN 2002AG
dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904.
The remaining 20% shall be captured in SLIN 0002AH. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 2002AH..
SUBCLIN 2002AH
dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904.
The remaining 80% shall be captured in SLIN 0002AG. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 2002AG..
SUBCLIN 2003AA
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 0003AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 2003AB..
SUBCLIN 2003AB
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 0003AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 2003AA..
SUBCLIN 2003AC
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 2003AD..
SUBCLIN 2003AD
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986. The remaining 80% shall be captured in SLIN 0003AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 2003AC..
SUBCLIN 2003AE
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining
20% shall be captured in SLIN 2003AF..
SUBCLIN 2003AF
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 0003AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 2003AE..
SUBCLIN 2003AG
dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986.
The remaining 20% shall be captured in SLIN 0003AH. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 2003AH..
SUBCLIN 2003AH
dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986.
The remaining 80% shall be captured in SLIN 0003AG. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 2003AG..
SUBCLIN 2004AA
DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 0004AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 2004AB..
SUBCLIN 2004AC
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 2004AD..
SUBCLIN 2004AD
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in SLIN 0004AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 2004AC..
SUBCLIN 2004AE
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 2004AF..
SUBCLIN 2004AF
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 2004AE..
SUBCLIN 2006AD
dining facility 5610 in accordance with the PWS. to The contractor shall provide a fixed price to open dining facility
SUBCLIN 3001AC
the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 3001AD..
SUBCLIN 3001AD
the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the
PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in
SLIN 3001AC. to The contractor shall provide a fixed price to perform the tasks required to close dining facility
5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 3001AC..
SUBCLIN 3001AE
the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining
20% shall be captured in SLIN 3001AF..
SUBCLIN 3001AG
dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610.
The remaining 20% shall be captured in SLIN 0001AH. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 3001AH..
SUBCLIN 3001AH
dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610.
The remaining 80% shall be captured in SLIN 0001AG. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 3001AG..
SUBCLIN 3002AA
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 0002AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 3002AB..
SUBCLIN 3002AB
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 3002AA..
SUBCLIN 3002AC
the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 3002AD..
SUBCLIN 3002AD
the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 3002AC..
SUBCLIN 3002AE
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining
20% shall be captured in SLIN 3002AF..
SUBCLIN 3002AF
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 3002AE..
SUBCLIN 3002AG
dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904.
The remaining 20% shall be captured in SLIN 0002AH. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 3002AH..
SUBCLIN 3002AH
dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904.
The remaining 80% shall be captured in SLIN 0002AG. to The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 3002AG..
SUBCLIN 3003AA
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 0003AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN 3003AB..
SUBCLIN 3003AB
DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 0003AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN 3003AA..
SUBCLIN 3003AC
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 3003AD..
SUBCLIN 3003AD
the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986. The remaining 80% shall be captured in SLIN 0003AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 3003AC..
SUBCLIN 3003AE
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining
20% shall be captured in SLIN 3003AF..
SUBCLIN 3003AF
the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 0003AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining
80% shall be captured in SLIN 3003AE..
SUBCLIN 3003AG
dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986.
The remaining 20% shall be captured in SLIN 0003AH. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 3003AH..
SUBCLIN 3003AH
dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986.
The remaining 80% shall be captured in SLIN 0003AG. to The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 3003AG..
SUBCLIN 3004AA
DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 0004AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN 3004AB..
SUBCLIN 3004AC
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 3004AD..
SUBCLIN 3004AD
the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in SLIN 0004AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 3004AC..
SUBCLIN 3004AE
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 3004AF..
SUBCLIN 3004AF
the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 3004AE..
SUBCLIN 3006AD
dining facility 5610 in accordance with the PWS. to The contractor shall provide a fixed price to open dining facility
SUBCLIN 4001AC
the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 4001AD..
SUBCLIN 4001AD
the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the
PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in
SLIN 4001AC. to The contractor shall provide a fixed price to perform the tasks required to close dining facility
5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 4001AC..
SUBCLIN 4001AE
the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining
20% shall be captured in SLIN 4001AF..
SUBCLIN 4001AG
dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610.
The remaining 20% shall be captured in SLIN 0001AH. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 4001AH..
SUBCLIN 4001AH
dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610.
The remaining 80% shall be captured in SLIN 0001AG. to The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 4001AG..
SUBCLIN 4002AA
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 0002AB. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN 4002AB..
SUBCLIN 4002AB
DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AA. to The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents
20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 4002AA..
SUBCLIN 4002AC
the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AD. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 4002AD..
SUBCLIN 4002AD
the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN 0002AC. to
The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 4002AC..
SUBCLIN 4002AE
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AF. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining
20% shall be captured in SLIN 4002AF..
SUBCLIN 4002AF
the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AE. to The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining
80% shall be captured in SLIN 4002AE..
SUBCLIN 4002AG
dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .