Food_Service_Draft_Solicitation_-_Amendment_1-_9_Dec_14.pdf

PDF 2 MB Posted

Attached to
Dix Full Food Service Federal contract opportunity
Solicitation number
FA4484-15-R-0005
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4484-15-R-0005 Solicitation Amendment 1 - 9 Dec 14

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

87 CONS/LGC

2402 VANDENBERG AVE

JB MCGUIRE-DIX-LAKEHURST NJ 08641

609-754-3735

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

35500000

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

FA4484-15-R-0005 13-Nov-2014

b. TELEPHONE NUMBER

609-754-4768

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 17 Dec 2014

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

FA4484

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE F3A390 16. ADMINISTERED BY

87 FSS/SVFA-F3A390

BETTY PERCY

2905 TUSKEGEE AIRMAN AVE

MCGUIRE AFB NJ 08641-5012

TEL: 609-754-4046 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MICHAEL R. PETTY

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

722310

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: 100 % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

0 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

X

FA4484-15-R-0005

Section SF 30 - BLOCK 14 CONTINUATION PAGE

PRICING SUMMARY

SUMMARY OF PRICES FOR BASE PERIOD AND FOUR OPTION PERIODS

BASE PERIOD (1 May 2015 – 30 April 2016) $_____________

OPTION YEAR 1 (1 May 2016 – 30 April 2017) $_____________

OPTION YEAR 2 (1 May 2017 – 30 April 2018) $_____________

OPTION YEAR 3 (1 May 2018 – 30 April 2019) $_____________

OPTION YEAR 4 (1 May 2019 – 30 April 2020) $_____________

GRAND TOTAL (BASE PLUS FOUR OPTION YEARS) $_____________

Note 1: Complete unit prices and total amounts. Total must be exact. Please round off to the nearest cent.

Note 2: In case of variation between the unit price and estimated net amount, unit price will be considered the offer.

Note 3: Failure to provide pricing on all CLINs will be considered a non-conforming proposal and will preclude the proposal from any further award consideration.

Note 4: Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.

Note 5: Instructions to offerors for commercial acquisitions, offeror representations and certification- commercial items and proposal preparation instructions will be physically removed from any resultant award, but will be deemed to be incorporated by reference in the award.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

5610 - Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5610 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. Dining facility 5610 is funded with 20% Operations and

Maintenance (O&M) funds and 80% Overseas Contingency Operating funds

(OCO). Therefore, the contractor is required to break out the price total for each associated SLIN for 5610 using the 80/20 split. Please read each line item carefully to identify the correct funding type.

FOB: Destination

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 365 Days Operate Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 80% of the daily total cost to operate 5610. The remaining 20% shall be captured in

SLIN 0001AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 365 Days Operate Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in

SLIN 0001AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 6 Each Short Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AD 6 Each Short Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 0001AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AE 1 Each Long Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AF 1 Each Long Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with paragraph 1.7.5.2 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 0001AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AG 6 Each Open Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 0001AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AH 6 Each Open Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 0001AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

5904 - Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5904 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 IAW all the requirements of the PWS. Dining facility 5904 is funded with 20% Operations and

Maintenance (O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5904 using the

80/20 split. Please read each line item carefully to identify the correct funding type.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AA 365 Days Operate Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN

0002AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AB 365 Days Operate Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN

0002AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AC 1 Each Short Range Closure of 5904- OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AD 1 Each Short Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AE 1 Each Long Range Closure of 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 0002AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AF 1 Each Long Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 0002AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AG 6 Each Open Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 0002AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AH 6 Each Open Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 0002AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

5986 - Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5986 is anticipated to be open for 183 days per year for overflow and personnel surges. This dining facility will only be opened at the direction of the contracting officer. The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 IAW all the requirements of the

PWS. Dining facility 5986 is funded with 20% Operations and Maintenance

(O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5986 using the 80/20 split. Please read each line item carefully to identify the correct funding type.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AA 183 Days Operate Dining Facility 5986- OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN

0003AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AB 183 Days Operate Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN

0003AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AC 24 Each Short Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AD 24 Each Short Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986. The remaining 80% shall be captured in SLIN 0003AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AE 12 Each Long Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 0003AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AF 12 Each Long Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 0003AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AG 24 Each Open Dining Facility 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 0003AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AH 24 Each Open Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 0003AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

5640 - Base Period 1 May 15 - 30 Apr 16

FFP

Dining facility 5640 is anticipated to be open for 30 days per year for overflow and personnel surges. This dining facility will only be opened at the direction of the contracting officer. The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 IAW all the requirements of the PWS. Dining facility 5640 is funded with 20% Operations and Maintenance (O&M) funds and

80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5640 using the 80/20 split. Please read each line item

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AA 30 Days Operate Dining Facility 5640 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN

0004AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AB 30 Days Operate Dining Facility 5640 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in

SLIN 0004AA

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AC 12 Each Short Range Closure of 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AD 12 Each Short Range Closure of 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AE 6 Each Long Range Closure of 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 0004AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AF 6 Each Long Range Closure of 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 0004AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AG 12 Each Open Dining Facility 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5640. The remaining 20% shall be captured in SLIN 0004AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AH 12 Each Open Dining Facility 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5640 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5640. The remaining 80% shall be captured in SLIN 0004AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

5509 - Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5509 is the Army’s Officer Education School and anticipated to be open approximately 92 days per year typically May through

Aug.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AA 92 Days Operate Dining Facility 5509

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5509 in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AB 1 Each Short Range Closure of 5509

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5509 for less than 30 days in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AC 1 Each Long Range Closure of 5509

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5509 for more than 30 days in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AD 1 Each Open Dining Facility 5509

FFP

The contractor shall provide a fixed price to open dining facility 5509 in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

5517- Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5517 services the Army Noncommissioned

Officer School is anticipated to be open 275 days per year (approximately 3 weeks per month), all year around.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AA 275 Days Operate Dining Facility 5517

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5517 in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AB 12 Each Short Range Closure of 5517

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5517 for less than 30 days in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AC 1 Each Long Range Closure of 5517

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5517 for more than 30 days in accordance with the PWS.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AD 12 Each Open Dining Facility 5517

FFP

The contractor shall provide a fixed price to open dining facility 5517 in

UNIT UNIT PRICE ESTIMATED AMOUNT

COL - Base Period 1 May 15 - 30 Apr 16

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - The Contingency Operating Location (COL) is anticipated to be open 183 days per year. This dining facility is located 18 miles east of the Dix area and is comprised of two general purpose tents (18 x 36). The contractor is required to prepare/serve meals for breakfast and dinner and issue operational rations for lunch.

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AA 183 Days Daily Operation of the COL

FFP

The contractor shall provide a fixed price for the DAILY operation of the COL in

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AB 10 Hours Extended Hours of Operation for the COL

FFP

The contractor shall provide a HOURLY price for extended hours of operation for the COL beyond serving times identified in appendix 3 of the PWS. This price shall reflect the TOTAL price of all labor/supples etc. to run the entire COL operation per hour past the stated hours of operation. See the PWS for extended hours of operation requirements. Note this CLIN is ONLY for the COL.

UNIT UNIT PRICE ESTIMATED AMOUNT

0008 70 Hours Extended Hours of Operation - Base Yr

FFP

The contractor shall provide a HOURLY price to extended the dining facility hours of operation beyond serving times identified in appendix 3 of the PWS. This price shall reflect the TOTAL price of all labor/supples etc. to continue the entire dining facility operation on a per hour basis past the stated hours of operation. This is

NOT an individual labor rate. See the PWS for extended hours of operation requirements. Extended hours of operation for this CLIN apply to dining facilities

5610, 5904, 5640, 5986, 5517 and 5509. Note this CLIN does not include the COL which is priced separately.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5610 - Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5610 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. Dining facility 5610 is funded with 20% Operations and

Maintenance (O&M) funds and 80% Overseas Contingency Operating funds

(OCO). Therefore, the contractor is required to break out the price total for each associated SLIN for 5610 using the 80/20 split. Please read each line item

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AA 365 Days OPTION Operate Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5610. The remaining 20% shall be captured in SLIN

1001AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AB 365 Days OPTION Operate Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in SLIN

1001AA

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AC 6 Each OPTION Short Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 0001AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AD 6 Each OPTION Short Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 1001AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AE 1 Each OPTION Long Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 1001AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AF 1 Each OPTION Long Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 1001AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AG 6 Each OPTION Open Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 1001AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AH 6 Each OPTION Open Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 1001AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5904 - Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5904 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 IAW all the requirements of the PWS. Dining facility 5904 is funded with 20% Operations and

Maintenance (O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5904 using the

80/20 split. Please read each line item carefully to identify the correct funding

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AA 365 Days OPTION Operate Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN

1002AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AB 365 Days OPTION Operate Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN

1002AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AC 1 Each OPTION Short Range Closure of 5904- OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 1002AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AD 1 Each OPTION Short Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 1002AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AE 1 Each OPTION Long Range Closure of 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 1002AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AF 1 Each OPTION Long Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 1002AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AG 6 Each OPTION Open Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 1002AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AH 6 Each OPTION Open Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 1002AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5986 - Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5986 is anticipated to be open for 183 days per year for overflow and personnel surges. This dining facility will only be opened at the direction of the contracting officer. The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 IAW all the requirements of the

PWS. Dining facility 5986 is funded with 20% Operations and Maintenance

(O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5986 using the 80/20 split. Please

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AA 183 Days OPTION Operate Dining Facility 5986- OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN

1003AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AB 183 Days OPTION Operate Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN

1003AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AC 24 Each OPTION Short Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 1003AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AD 24 Each OPTION Short Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 1003AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AE 12 Each OPTION Long Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 1003AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AF 12 Each OPTION Long Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 1003AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AG 24 Each OPTION Open Dining Facility 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 1003AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AH 24 Each OPTION Open Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 1003AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5640 - Option Yr 1 1 May 16 - 30 Apr 17

FFP

Dining facility 5640 is anticipated to be open for 30 days per year for overflow and personnel surges. This dining facility will only be opened at the direction of the contracting officer. The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 IAW all the requirements of the PWS. Dining facility 5640 is funded with 20% Operations and Maintenance (O&M) funds and

80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5640 using the 80/20 split. Please read each line item

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AA 30 Days OPTION Operate Dining Facility 5640 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5640. The remaining 20% shall be captured in SLIN

1004AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AB 30 Days OPTION Operate Dining Facility 5640 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5640 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5640. The remaining 80% shall be captured in

SLIN 1004AA

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AC 12 Each OPTION Short Range Closure of 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5640. The remaining 20% shall be captured in SLIN 1004AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AD 12 Each OPTION Short Range Closure of 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 1004AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AE 6 Each OPTION Long Range Closure of 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5640. The remaining 20% shall be captured in SLIN 1004AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AF 6 Each OPTION Long Range Closure of 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5640 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5640. The remaining 80% shall be captured in SLIN 1004AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AG 12 Each OPTION Open Dining Facility 5640 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5640 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5640. The remaining 20% shall be captured in SLIN 1001AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AH 12 Each OPTION Open Dining Facility 5640 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5640 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5640. The remaining 80% shall be captured in SLIN 1001AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5509 - Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5509 is the Army’s Officer Education School and anticipated to be open approximately 92 days per year typically May through

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AA 92 Days OPTION Operate Dining Facility 5509

FFP

The contractor shall provide a fixed price for the DAILY operation of dining

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AB 1 Each OPTION Short Range Closure of 5509

FFP

The contractor shall provide a fixed price to perform the tasks required to close

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AC 1 Each OPTION Long Range Closure of 5509

FFP

The contractor shall provide a fixed price to perform the tasks required to close

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AD 1 Each OPTION Open Dining Facility 5509

FFP

The contractor shall provide a fixed price to open dining facility 5509 in

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5517- Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5517 services the Army Noncommissioned

Officer School is anticipated to be open 275 days per year (approximately 3 weeks

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AA 275 Days OPTION Operate Dining Facility 5517

FFP

The contractor shall provide a fixed price for the DAILY operation of dining

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AB 12 Each OPTION Short Range Closure of 5517

FFP

The contractor shall provide a fixed price to perform the tasks required to close

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AC 1 Each OPTION Long Range Closure of 5517

FFP

The contractor shall provide a fixed price to perform the tasks required to close

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AD 12 Each OPTION Open Dining Facility 5517

FFP

The contractor shall provide a fixed price to open dining facility 5517 in

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION COL - Option Yr 1 1 May 16 - 30 Apr 17

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - The Contingency Operating Location (COL) is anticipated to be open 183 days per year. This dining facility is located 18 miles east of the Dix area and is comprised of two general purpose tents (18 x 36). The contractor is required to prepare/serve meals for breakfast and dinner and issue operational

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AA 183 Days OPTION Daily Operation of the COL

FFP

The contractor shall provide a fixed price for the DAILY operation of the COL in

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AB 10 Hours OPTION Extended Hrs COL - Option Yr 1

FFP

The contractor shall provide a HOURLY price for extended hours of operation for the COL beyond serving times identified in appendix 3 of the PWS. This price shall reflect the TOTAL price of all labor/supples etc. to run the entire COL operation per hour past the stated hours of operation. See the PWS for extended

UNIT UNIT PRICE ESTIMATED AMOUNT

1008 70 Hours OPTION Extended Hrs of Operation - Option Yr 1

FFP

The contractor shall provide a HOURLY price to extended the dining facility hours of operation beyond serving times identified in appendix 3 of the PWS. This price shall reflect the TOTAL price of all labor/supples etc. to continue the entire dining facility operation on a per hour basis past the stated hours of operation. This is

NOT an individual labor rate. See the PWS for extended hours of operation requirements. Extended hours of operation for this CLIN apply to dining facilities

5610, 5904, 5640, 5986, 5517 and 5509. Note this CLIN does not include the COL

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5610 - Option Yr 2 1 May 17 - 30 Apr 18

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5610 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. Dining facility 5610 is funded with 20% Operations and

Maintenance (O&M) funds and 80% Overseas Contingency Operating funds

(OCO). Therefore, the contractor is required to break out the price total for each associated SLIN for 5610 using the 80/20 split. Please read each line item

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AA 365 Days OPTION Operate Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 20% shall be captured in

SLIN 2001AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AB 365 Days OPTION Operate Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5610 IAW all the requirements of the PWS. This line item represents 20% of the daily total cost to operate 5610. The remaining 80% shall be captured in

SLIN 2001AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AC 6 Each OPTION Short Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5610. The remaining 20% shall be captured in SLIN 2001AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AD 6 Each OPTION Short Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for less than 30 days in accordance with paragraph 1.7.5.1 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 2001AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AE 1 Each OPTION Long Range Closure of 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5610. The remaining 20% shall be captured in SLIN 2001AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AF 1 Each OPTION Long Range Closure of 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5610 for more than 30 days in accordance with paragraph 1.7.5.2 of the PWS. This line item represents 20% of the daily total cost to close 5610. The remaining 80% shall be captured in SLIN 2001AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AG 6 Each OPTION Open Dining Facility 5610 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5610. The remaining 20% shall be captured in SLIN 2001AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AH 6 Each OPTION Open Dining Facility 5610 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5610 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5610. The remaining 80% shall be captured in SLIN 2001AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5904 - Option Yr 2 1 May 17 - 30 Apr 18

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5904 is a primary dining facility and is anticipated to be open 365 days per year during the base period. See the Dix Food

Service PWS specific requirements and hours of operation. The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 IAW all the requirements of the PWS. Dining facility 5904 is funded with 20% Operations and

Maintenance (O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5904 using the

80/20 split. Please read each line item carefully to identify the correct funding

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AA 365 Days OPTION Operate Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5904. The remaining 20% shall be captured in SLIN

2002AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AB 365 Days OPTION Operate Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5904. The remaining 80% shall be captured in SLIN

2002AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AC 1 Each OPTION Short Range Closure of 5904- OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5904. The remaining 20% shall be captured in SLIN 2002AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AD 1 Each OPTION Short Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 2002AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AE 1 Each OPTION Long Range Closure of 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5904. The remaining 20% shall be captured in SLIN 2002AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AF 1 Each OPTION Long Range Closure of 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5904 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5904. The remaining 80% shall be captured in SLIN 2002AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AG 6 Each OPTION Open Dining Facility 5904 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5904. The remaining 20% shall be captured in SLIN 2002AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AH 6 Each OPTION Open Dining Facility 5904 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5904 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5904. The remaining 80% shall be captured in SLIN 2002AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5986 - Option Yr 2 1 May 17 - 30 Apr 18

FFP

THIS IS AN INFORMATIONAL CLIN ONLY DO NOT SUBMIT A PRICE

FOR THIS ITEM - Dining facility 5986 is anticipated to be open for 183 days per year for overflow and personnel surges. This dining facility will only be opened at the direction of the contracting officer. The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 IAW all the requirements of the

PWS. Dining facility 5986 is funded with 20% Operations and Maintenance

(O&M) funds and 80% OCO funds. Therefore, the contractor is required to break out the price total for each associated SLIN for 5986 using the 80/20 split. Please

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AA 183 Days OPTION Operate Dining Facility 5986- OCO Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to operate 5986. The remaining 20% shall be captured in SLIN

2003AB.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AB 183 Days OPTION Operate Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price for the DAILY operation of dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to operate 5986 The remaining 80% shall be captured in SLIN

2003AA.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AC 24 Each OPTION Short Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 80% of the total cost to close 5986. The remaining 20% shall be captured in SLIN 2003AD.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AD 24 Each OPTION Short Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for less than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 2003AC.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AE 12 Each OPTION Long Range Closure of 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 80% of the daily total cost to close 5986. The remaining 20% shall be captured in SLIN 2003AF.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AF 12 Each OPTION Long Range Closure of 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to perform the tasks required to close dining facility 5986 for more than 30 days in accordance with the PWS. This line item represents 20% of the daily total cost to close 5986. The remaining 80% shall be captured in SLIN 2003AE.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AG 24 Each OPTION Open Dining Facility 5986 - OCO Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 80% of the daily total cost to open 5986. The remaining 20% shall be captured in SLIN 2003AH.

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AH 24 Each OPTION Open Dining Facility 5986 - O&M Funds

FFP

The contractor shall provide a fixed price to open dining facility 5986 in accordance with the PWS. This line item represents 20% of the daily total cost to open 5986. The remaining 80% shall be captured in SLIN 2003AG.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION 5640 - Option Yr 2 1 May 17 - 30 Apr 18

FFP

Dining facility 5640 is anticipated to be open for 30 days per year for overflow and personnel surges.

This is the start of the file's text. The full file is on GovTribe.