Attachment 14 - B10 Window Replacements Bid schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
PKA - B10 Windows - Travis AFB (AMENDED v5) Federal contract opportunity
Solicitation number
FA442724R0019
Issued by
Department of the Air Force Air Mobility Command

About this file

This document appears to be a bid schedule for the "B10 Window Replacements" project at Travis Air Force Base, which is part of the larger solicitation FA442724R0019 for the PKA - B10 Windows project.

The bid schedule includes a base bid and a bid option for various window demolition and replacement work, including removal and reinstallation of window shades, mold remediation, drywall and stucco repairs, and painting. Key details include the unit quantities, unit costs, and total costs for each line item.

The related federal contract opportunity, solicitation FA442724R0019, is for the PKA - B10 Windows project at Travis AFB. The solicitation was issued by the Department of the Air Force's Air Mobility Command. Questions on the solicitation are due by June 12, 2024 at 11:00 AM PDT.

View the file

Other files for this federal contract opportunity

Other files attached to PKA - B10 Windows - Travis AFB (AMENDED v5), newest first.
File Type Posted
Solicitation - FA442724R00190005.pdf PDF
Attachment 1 - SOW Rev.2 - B10 Windows 21 August 2024.pdf PDF
Amendment 0005 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190004.pdf PDF
Amendment 0004 SF 30.pdf PDF
Attachment 1 - SOW Rev.1 - B10 Windows 25 July 2024.pdf PDF
Attachment 14 - B10 - Window replacements Bid schedule.xlsx XLSX spreadsheet
Attachment 15 - B10 Windows - RFIs Answered 30 July 24.pdf PDF
Amendment 0003 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190003.pdf PDF
Amendment 0002 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190002.pdf PDF
Solicitation Amended - FA442724R00190001.pdf PDF
Amendment 0001 SF 30.pdf PDF
Attachment 4 - Travis Facilities Excellence Guide.pdf PDF
Attachment 6 - SECTION 01 03 00 PROJECT CLOSEOUT.pdf PDF
Attachment 8 - SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM.pdf PDF
Solicitation - FA442724R0019.pdf PDF
Attachment 1 - SOW XDAT 23-1040 03.21.2024.pdf PDF
Attachment 3 - Travis AFB MaintDurList.pdf PDF
Attachment 5 - Travis AFB Spec 01000 Word DocWithHyperlinks 1-04-23.pdf PDF
Attachment 7 - SECTION 01 56 00 Environmental Specifications.pdf PDF
Attachment 9 - Tab 1. 2023 ISWMP.pdf PDF
Attachment 13 - Sponsorship Site Visit Info.pdf PDF
Attachment 2 - WD - CA20240007.pdf PDF
Attachment 10 - SWD Contractor Requirements - Soil - TSDF.PNG PNG image
Attachment 11 - B10 Vicinity Map.pdf PDF
Attachment 12 - TAFB Security Clause.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid

BID SCHEDULE

XDAT 23-1040 Replace Window B10 Base Bid

DescriptionQuantityUnitUnit CostTotal
Cab floor-Window demolitionSF
Cab floor - Window wall, aluminum,
stock, including glazingSF
Windows, aluminum, commercial grade, stock units, awning, with screen, 4'-5" x 5' 3" opening, incl. frame and glazingSF
Remove and reinstall window shadesLF
Mold remediation, mold abatement plan,
areas to 10,000 S.F.SF
Mold remediation plans and methods, air
sample test, eachLS
Mold remediation plans and methods,
after remediation air test, eachLS
Walls and partitions demolition, drywall,
two layers, nailed or screwedSF
Gypsum wallboard, repairs, cut square, patch, sand and finish, holesSF
Walls and partitions demolition, exterior
stucco over netting, 1" thickSF
Paints & coatings, siding, exterior, stucco, rough, oil base, paint 2 coats, spraySF
Crane rental, Crane crew, daily use for small jobs, 12-
ton truck-mounted hydraulic crane, portal to portalDAYS
General RequirementsLS
General ConditionsLS
As-BuiltsLS
Contracts Docs & Construction
ManagementLS

Bid Option

BID SCHEDULE

XDAT 23-1040 Replace Window B10 Bid Option

DescriptionQuantityUnitUnit CostTotal
Tower Window demolitionSF
Tower floors - Window wall, aluminum, stock, including glazingSF
Dual Window ShadesLF
Mold remediation, mold abatement plan,
areas to 10,000 S.F.SF
Mold remediation plans and methods, air
sample test, eachLS
Mold remediation plans and methods,
after remediation air test, eachLS
Walls and partitions demolition, drywall,
two layers, nailed or screwedSF
Gypsum wallboard, repairs, cut square, patch, sand and finish, holesSF
Walls and partitions demolition, exterior
stucco over netting, 1" thickSF
Paints & coatings, siding, exterior, stucco, rough, oil base, paint 2 coats, spraySF
Crane rental, Crane crew, daily use for small jobs, 12-
ton truck-mounted hydraulic crane, portal to portalDAYS
General RequirementsLS
General ConditionsLS
As-BuiltsLS
Contracts Docs & Construction
ManagementLS