Attachment 1 - SOW Rev.1 - B10 Windows 25 July 2024.pdf

PDF 111 KB Posted

Attached to
PKA - B10 Windows - Travis AFB (AMENDED v5) Federal contract opportunity
Solicitation number
FA442724R0019
Issued by
Department of the Air Force Air Mobility Command

About this file

The provided document is a Statement of Work (SOW) for a federal contract opportunity to demolish and replace existing windows at the Flight Line Control Tower at Travis Air Force Base. The SOW outlines the general requirements, including the number and size of windows to be replaced, applicable codes and standards, and considerations for maintaining operations during construction. Key details include the requirement for the contractor to conduct hazardous testing, demolish and replace 32 windows in the tower and cab, and install new dual window shades on the eighth floor. The SOW also specifies that the contractor must obtain approval for lift equipment and a laydown yard, which may take up to 6 months. The associated federal contract opportunity, Solicitation Number FA442724R0019, is for the "PKA - B10 Windows - Travis AFB" project, with the Department of the Air Force Air Mobility Command as the procuring agency. Questions for the solicitation are due by June 12, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to PKA - B10 Windows - Travis AFB (AMENDED v5), newest first.
File Type Posted
Attachment 14 - B10 Window Replacements Bid schedule.xlsx XLSX spreadsheet
Solicitation - FA442724R00190005.pdf PDF
Attachment 1 - SOW Rev.2 - B10 Windows 21 August 2024.pdf PDF
Amendment 0005 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190004.pdf PDF
Amendment 0004 SF 30.pdf PDF
Attachment 14 - B10 - Window replacements Bid schedule.xlsx XLSX spreadsheet
Attachment 15 - B10 Windows - RFIs Answered 30 July 24.pdf PDF
Amendment 0003 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190003.pdf PDF
Amendment 0002 SF 30.pdf PDF
Solicitation Amendment - FA442724R00190002.pdf PDF
Amendment 0001 SF 30.pdf PDF
Solicitation Amended - FA442724R00190001.pdf PDF
Attachment 4 - Travis Facilities Excellence Guide.pdf PDF
Attachment 6 - SECTION 01 03 00 PROJECT CLOSEOUT.pdf PDF
Attachment 8 - SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM.pdf PDF
Attachment 2 - WD - CA20240007.pdf PDF
Attachment 10 - SWD Contractor Requirements - Soil - TSDF.PNG PNG image
Attachment 11 - B10 Vicinity Map.pdf PDF
Attachment 12 - TAFB Security Clause.pdf PDF
Solicitation - FA442724R0019.pdf PDF
Attachment 1 - SOW XDAT 23-1040 03.21.2024.pdf PDF
Attachment 3 - Travis AFB MaintDurList.pdf PDF
Attachment 5 - Travis AFB Spec 01000 Word DocWithHyperlinks 1-04-23.pdf PDF
Attachment 7 - SECTION 01 56 00 Environmental Specifications.pdf PDF
Attachment 9 - Tab 1. 2023 ISWMP.pdf PDF
Attachment 13 - Sponsorship Site Visit Info.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Project Name: Flight line Control Tower Windows

XDAT # 23-1040

25 JUL 2024

REVISION 1

1. GENERAL DESCRIPTION

1.1 The contractor (Ktr) shall provide all design, labor, materials, and supervision to demolish and replace existing windows at building 10. There are 16 windows to be replaced in the tower and 16 windows in the cab at the top of the control tower. Contractor shall comply with codes and standards to include:

UFC 1-200-01

UFC 4-133-01

UFC 4-010-01

UFGS 01-33-00

IEBC 2021

IBC 2021

Spec 01000 Travis AFB Facilities Excellence Guide Travis AFB Maintainability and Durability List

1.2 Contractor shall have approved drawings and submittals for all materials prior to any new work or installation of equipment, including accessory items. Contractor shall review existing as-built drawings and make corrections to apply with proposed new scope designs with final review by government for approval. All work must comply with environmental laws and regulations, including abatement of any hazardous materials. Operations of the control tower are conducted 24/7 so work is best started as earliest as possible in the day to avoid as much interference as possible. All work to be completed, is to be coordinated through CE with flight control tower so that they may continue work while construction is taking place. Contractor shall provide a phase plan prior to start of construction. Aside from that contractor should only remove windows that can be replaced within the same days work. Contractor will be responsible to provide all proper equipment to complete demolition and construction to include proper fall equipment as there is no tie off system on the roof.

Prior to construction contractor will need to obtain approval for lift equipment “Tac W” through Base Civil Engineering as well as providing a primary and alternate laydown yard.

To obtain approval processing time may take up to 6 months. Approval process for laydown and Tac W shall be started immediately after award. Any blocking of views or excessively loud noise in cab will need to be coordinated ahead of time.

2. TESTING

2.1 Contractor to conduct hazardous testing of mold and a leak test for the entire exterior of facility, immediately after the notice to proceed and prior to mobilization. Contractor shall provide test results/reports/findings to the government. Contractor shall assume that mold is present and account for this in their bid for mold to be abated.

3. DEMOLITION & CONSTRUCTION

3.1 Based off the results of the leak test report, contractor shall demolish old windows to include frames and window assemblies. Refer to attachment 1 & 2 for all windows highlighted in yellow needing to be addressed.

3.2 The tower cab consists of 16 windows to be removed for replacement, and are approximately 6’x 7’ in size. Frames to remain and glass shall be replaced.

3.3 The 8th floor has 7 south facing windows within the entire window assembly that need to be replaced and 7 west facing windows within the entire window assembly that need to be replaced. The window assemblies are 48” x 296”. Contractor to demolish and replace approximately 49 LF of counter space in window sills.

3.4 The 6th floor has 1 south facing window, and 1 west facing window that need replacement.

The windows are 42” x 42” in size.

3.5 Gypsum board around windows as well as stucco siding will need to be removed and or refinished at places of damage and where water intrusion occurs. Paint shall match existing finishes and be preapproved by BCE.

3.6 Contractor shall install new dual window shades on eighth floor. Any existing window shades in cab shall be removed and reinstalled. Contractor will be responsible for any damage to existing window shades.