This is a Questions and Answers document for solicitation FA441826Q0031 regarding Short Stay Wastewater Treatment Plant Maintenance and Operations at Joint Base Charleston. The document addresses clarifications on facility operations, equipment, and contractor responsibilities related to the wastewater treatment plant (WWTP).

Key clarifications include: previous contractors struggled with Total Residual Chlorine (TRC), Total Suspended Solids (TSS), e.Coli, and Dissolved Oxygen (DO) parameters; a complete list of upgrades and repairs made since December 2023 is referenced in Attachment #05 of the solicitation; the facility contains one backflow preventer (not three as initially stated in an earlier Performance Work Statement dated 12 January 2026); local and audible/visual tank level alarms are installed on the WWTP, RV Septic tank, and lift stations; the Government will perform exterior painting when funding becomes available, after which the contractor will be responsible for touch-up painting as maintenance; the contractor will have access to and be responsible for maintaining remote tank level indicators (TLIs); the contractor is responsible for annual calibration of the effluent flow meter as part of Preventive Maintenance and Inspection (PMI); staffing levels are at the contractor's discretion with no minimum requirement specified; and design parameters for the facility are provided in a technical table showing details such as 30,000 GPD normal plant design flow, various tank volumes and loadings, and aerobic digester specifications.

View the file

Other files

File Type Posted
Atch-01 WWTP O_M Services PWS_13 Jan 2026 - Rev 1.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet - Rev 1.pdf PDF
Atch-05_WWTP List of Repairs.pdf PDF
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003_05 Mar 2026.xlsx XLSX spreadsheet
Atch-02_Provisions and Clauses.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003.xlsx XLSX spreadsheet
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Attachment 03 Wage Determination 2015-4427 Rev 32.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
WWTP O_M Services PWS_16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Short Stay Wastewater Treatment Plant Maintenance and Operations

FA441826Q0031

1. What parameters did the previous contractors struggle with?

o TRC – Total Residual Chlorine o TSS – Total Suspended Solids o e.Coli o DO – Dissolved Oxygen

2. What upgrades/repairs have been made?

See Attachment #05 of the solicitation for a complete list of repairs made since December

2023.

3. How many backflow preventers are there?

The PWS dated 12 Jan 2026 stated there were three (3) backflow preventers. However, there is only one (1) backflow preventer. Changes have been to the PWS (dated 12 Mar

2026) and PWS Attachment 8.9 PMI spreadsheet (Rev 1) to correct the error.

4. Is there an alarm system?

There are local and audible/visual tank level alarms installed on the WWTP, RV Septic tank and lift stations.

5. Is the contractor responsible for painting the exterior of the plant?

It is anticipated the Government will be performing exterior painting when funding becomes readily available. Once the exterior painting is brought up to a maintainable standard, the contractor will be responsible for touch-up painting as industry standard maintenance to prevent corrosion.

6. Will the contractor have access to the remote tank level indicators (TLI’s) that are currently installed?

Yes, the TLI’s will be considered part of the WWTP. The contractor will be responsible for any maintenance needed to keep the TLI’s operational.

7. Will the contractor be responsible for annual calibration of the effluent flow meter?

Yes, the contractor will be responsible for annual calibration as part of PMI. PWS

Attachment 8.9, “PMI Spreadsheet” (Rev 1) has been updated to include this requirement.

8. Is there a minimum number of staff Joint Base Charleston is requiring to operate the facility?

The number of staff needed to operate the facility is at the discretion of the contractor.

9. What is the smaller sludge holding tank’s volume?