Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003_05 Mar 2026.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
Joint Base Charleston Waste Water Treatment Plant Operation and Maintenance
Solicitation number
FA441826Q0031
Issued by

About this file

This is an RFQ Pricing Workbook for Wastewater Treatment Plant (WWTP) Operation and Maintenance Services at Joint Base Charleston's Short Stay Recreational Area in Moncks Corner, South Carolina. The solicitation (FA441826Q0003) is a combined synopsis/RFQ issued by the 628th Contracting Squadron set-aside for small business concerns. The contract period runs from April 1, 2026 through March 31, 2031 (base year plus four option years), with performance of work at the WWTP, Water Distribution System, Waste Water Collection System, RV Dump Station, and Public Beach Swimming Area.

The pricing workbook contains multiple Contract Line Items (CLINs) organized by fiscal year. The base year (CLINs 0001-0003) includes three service categories: Potable Water System WWTP Operation and Maintenance (12-month requirement), WWTP Pump and Haul services (460,000 gallons), and WWTP Repairs (as-needed). Option years 1-4 (CLINs 1001-4003) follow the same structure with Pump and Haul quantities reduced to 200,000 gallons annually. Offerors must provide labor rates, materials costs, subcontractor repair costs, lab testing charges, and haul/disposal fees. The workbook includes detailed labor schedules for specific maintenance tasks (equipment inspections, belt replacements, pump impeller inspections, etc.), sampling and water quality testing requirements (monthly BOD, TSS, chlorine residual; weekly E. coli during swimming season), and anticipated repair costs with overhead and profit markup. Interested offerors were required to notify the government by March 6, 2026 for site visit attendance on March 11, 2026 at 1000 AM EST, with questions due by March 12, 2026. Contact information: Taylor McDaniel, Contracting Officer, (843) 963-4491, taylor.mcdaniel.1@us.af.mil or Madison Nerenberg, Contract Specialist, (843) 963-5158, madison.nerenberg@us.af.mil.

View the file

Other files

File Type Posted
Atch-01 WWTP O_M Services PWS_13 Jan 2026 - Rev 1.pdf PDF
Atch-06_QandA - Short Stay WWTP O_M.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet - Rev 1.pdf PDF
Atch-05_WWTP List of Repairs.pdf PDF
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-02_Provisions and Clauses.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003.xlsx XLSX spreadsheet
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Attachment 03 Wage Determination 2015-4427 Rev 32.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
WWTP O_M Services PWS_16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Pricing Sheet

REQUEST FOR QUOTATION (RFQ)

Joint Base Charleston Wastewater Treatment Plant Operation and Maintenance Services Short Stay Recreational Area Moncks Corner, SC FA441826Q0003

The 628th Contracting Squadron is soliciting quotations on the item(s) listed below. Please complete this form and submit your offer to:

Attn: Taylor McDaniel Tel No: (843) 963-4491 E-mail: taylor.mcdaniel.1@us.af.mil

ItemDescriptionQuantityUnitUnit PriceTotal Extended Price
CLIN 0001Potable Water System, WWTP O&M

FFP

NON-Personal Services: Contractor will furnish qualified personnel (to include labor, materials, and equipment) to provide all services O&M (operation and maintenance) for the Waste Water Treatment Plant (WWTP), Water Distribution System, Waste Water Collection System, RV Dump Station, and Water Quality Testing (Potable Water and Public Beach Swimming Area) in strict accordance to the attached Performance Work Statement (PWS). PoP: 1 Apr 2026 - 31 Mar 202712Months$ - 0$ - 0
CLIN 0002WWTP Pump and Haul FFP NON-Personal Services: The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation, and other materials necessary to complete pump and haul services in accordance with the PWS. The contractor shall invoice, monthly, for the quantity of wastewater removed from the Short Stay Recreational Area and properly disposed of at a wastewater treatment facility in accordance with the PWS. PoP: 1 Apr 2026 - 31 Mar 2027460,000Gallon$ - 0$ - 0
CLIN 0003WWTP Repairs FFP NON-Personal Services: Contractor will furnish qualified personnel and materials to perform repair services for replacement parts/repairs exceeding the limitation of liability, the Contractor will provide a written estimate to the COR for CO approval prior to performing the work in accordance with the attached PWS. Any excess funds remaining at the end of the period of performance will be deobligated. The contractor shall not perform work under this CLIN without prior authorization from the Contracting Officer. PoP: 1 Apr 2026 - 31 Mar 2027

Labor Category: ______________________

Labor Rate: ____________/hr1Lot$ - 0$ - 0
CLIN 1001Potable Water System, WWTP O&M

FFP

NON-Personal Services: Contractor will furnish qualified personnel (to include labor, materials, and equipment) to provide all services O&M (operation and maintenance) for the Waste Water Treatment Plant (WWTP), Water Distribution System, Waste Water Collection System, RV Dump Station, and Water Quality Testing (Potable Water and Public Beach Swimming Area) in strict accordance to the attached Performance Work Statement (PWS). 1 Apr 2027 - 31 Mar 202812Months$ - 0$ - 0
CLIN 1002WWTP Pump and Haul FFP NON-Personal Services: The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation, and other materials necessary to complete pump and haul services in accordance with the PWS. The contractor shall invoice, monthly, for the quantity of wastewater removed from the Short Stay Recreational Area and properly disposed of at a wastewater treatment facility in accordance with the PWS. 1 Apr 2027 - 31 Mar 2028200,000Gallon$ - 0$ - 0
CLIN 1003WWTP Repairs FFP NON-Personal Services: Contractor will furnish qualified personnel and materials to perform repair services for replacement parts/repairs exceeding the limitation of liability, the Contractor will provide a written estimate to the COR for CO approval prior to performing the work in accordance with the attached PWS. Any excess funds remaining at the end of the period of performance will be deobligated. The contractor shall not perform work under this CLIN without prior authorization from the Contracting Officer. 1 Apr 2027 - 31 Mar 2028

Labor Category: ______________________

Labor Rate: ____________/hr1Lot$ - 0$ - 0
CLIN 2001Potable Water System, WWTP O&M

FFP

NON-Personal Services: Contractor will furnish qualified personnel (to include labor, materials, and equipment) to provide all services O&M (operation and maintenance) for the Waste Water Treatment Plant (WWTP), Water Distribution System, Waste Water Collection System, RV Dump Station, and Water Quality Testing (Potable Water and Public Beach Swimming Area) in strict accordance to the attached Performance Work Statement (PWS). PoP: 1 Apr 2028 - 31 Mar 202912Months$ - 0$ - 0
CLIN 2002WWTP Pump and Haul FFP NON-Personal Services: The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation, and other materials necessary to complete pump and haul services in accordance with the PWS. The contractor shall invoice, monthly, for the quantity of wastewater removed from the Short Stay Recreational Area and properly disposed of at a wastewater treatment facility in accordance with the PWS. PoP: 1 Apr 2028 - 31 Mar 2029200,000Gallon$ - 0$ - 0
CLIN 2003WWTP Repairs FFP NON-Personal Services: Contractor will furnish qualified personnel and materials to perform repair services for replacement parts/repairs exceeding the limitation of liability, the Contractor will provide a written estimate to the COR for CO approval prior to performing the work in accordance with the attached PWS. Any excess funds remaining at the end of the period of performance will be deobligated. The contractor shall not perform work under this CLIN without prior authorization from the Contracting Officer. PoP: 1 Apr 2028 - 31 Mar 2029

Labor Category: ______________________

Labor Rate: ____________/hr1Lot$ - 0$ - 0
CLIN 3001Potable Water System, WWTP O&M

FFP

NON-Personal Services: Contractor will furnish qualified personnel (to include labor, materials, and equipment) to provide all services O&M (operation and maintenance) for the Waste Water Treatment Plant (WWTP), Water Distribution System, Waste Water Collection System, RV Dump Station, and Water Quality Testing (Potable Water and Public Beach Swimming Area) in strict accordance to the attached Performance Work Statement (PWS). PoP: 1 Apr 2029 - 31 Mar 203012Months$ - 0$ - 0
CLIN 3002WWTP Pump and Haul FFP NON-Personal Services: The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation, and other materials necessary to complete pump and haul services in accordance with the PWS. The contractor shall invoice, monthly, for the quantity of wastewater removed from the Short Stay Recreational Area and properly disposed of at a wastewater treatment facility in accordance with the PWS. PoP: 1 Apr 2029 - 31 Mar 2030200,000Gallon$ - 0$ - 0
CLIN 3003WWTP Repairs FFP NON-Personal Services: Contractor will furnish qualified personnel and materials to perform repair services for replacement parts/repairs exceeding the limitation of liability, the Contractor will provide a written estimate to the COR for CO approval prior to performing the work in accordance with the attached PWS. Any excess funds remaining at the end of the period of performance will be deobligated. The contractor shall not perform work under this CLIN without prior authorization from the Contracting Officer. PoP: 1 Apr 2029 - 31 Mar 2030

Labor Category: ______________________

Labor Rate: ____________/hr1Lot$ - 0$ - 0
CLIN 4001Potable Water System, WWTP O&M

FFP

NON-Personal Services: Contractor will furnish qualified personnel (to include labor, materials, and equipment) to provide all services O&M (operation and maintenance) for the Waste Water Treatment Plant (WWTP), Water Distribution System, Waste Water Collection System, RV Dump Station, and Water Quality Testing (Potable Water and Public Beach Swimming Area) in strict accordance to the attached Performance Work Statement (PWS). PoP: PoP: 1 Apr 2030 - 31 Mar 203112Months$ - 0$ - 0
CLIN 4002WWTP Pump and Haul FFP NON-Personal Services: The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation, and other materials necessary to complete pump and haul services in accordance with the PWS. The contractor shall invoice, monthly, for the quantity of wastewater removed from the Short Stay Recreational Area and properly disposed of at a wastewater treatment facility in accordance with the PWS. PoP: PoP: 1 Apr 2030 - 31 Mar 2031200,000Gallon$ - 0$ - 0
CLIN 4003WWTP Repairs FFP NON-Personal Services: Contractor will furnish qualified personnel and materials to perform repair services for replacement parts/repairs exceeding the limitation of liability, the Contractor will provide a written estimate to the COR for CO approval prior to performing the work in accordance with the attached PWS. Any excess funds remaining at the end of the period of performance will be deobligated. The contractor shall not perform work under this CLIN without prior authorization from the Contracting Officer. PoP: 1 Apr 2030 - 31 Mar 2031

Labor Category: ______________________

Labor Rate: ____________/hr1Lot$ - 0$ - 0
TOTAL COST (Base + 4 Option Years ) FOB DESTINATION$ - 0

Summary

Request for Quote
1 Apr 2026 thru 31 Mar 2031
Waste Water Treatment Plant
Short Stay Recreation Area, Moncks Corner, SC
%FY26 Base Year$ - 0
Annual EscalationFY27 Option Year 1$ - 0
Fringe Benefits(National Average for All Occupations)FY28 Option Year 2$ - 0
OverheadFY29 Option Year 3$ - 0
General & AdminFY30 Option Year 4$ - 0
Profit/FeeGRAND TOTAL ESTIMATED COST$ - 0
DIRECT LABOR ESTIMATE (Identify Labor Category below)Estimated % of EffortEstimated Base SalaryBase YearOption Year 1Option Year 2Option Year 3Option Year 4TOTAL
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Direct Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Direct Labor Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal Direct Labor + Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal D.Labor/Fringe Benefits/Overhead$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mark-upBase YearOption Year 1Option Year 2Option Year 3Option Year 4TOTAL
Subcontractor (Repairs)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Materials$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Lab Tests$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Haul & Dump$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Other Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Labor/Fringe/Overhead (from above) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Subtotal ODC & Labor $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

General & Admin (Commercial) 0% $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Estimated Cost including G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fee/Profit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Est. Cost + Fixed Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
BaseFY24FY25FY26FY27Total
(not including 6 month extention)

LABOR

LABOR

EquipmentTypeTaskFrequencyTime to Complete Each Task (minutes)Time to Complete Each Task (Decimal)Weekly Total (Hours)Monthly Total (Hours)Quarterly Total (Hours)Semi-Annual Total (Hours)Total Annual (Hours)Cost Per HourTotal Cost
Identify Labor Category ClassificationAdminQuality Assurance, Planning, etc.Daily0.000.000.000.000.000.000.00$ - 0
Identify Labor Category ClassificationO&MOperation & Maintenance/ServiceDaily0.000.000.000.000.000.000.00$ - 0
Identify Labor Category ClassificationAdminLog PM & Send to Home Office and Order Supplies and MaterialsDaily0.000.000.000.000.000.000.00$ - 0
Aeration BasinPMTouch up Paint (Apr & Oct)Semi-annual0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #1PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #1PMBelt Inspection (Tension & Appearance)Weekly0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #1PMGreasing of Ball BearingsWeekly0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #2PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #2PMBelt Inspection (Tension & Appearance)Weekly0.000.000.000.000.000.000.00$ - 0
Aeration Basin Blower #2PMGreasing of Ball BearingsWeekly0.000.000.000.000.000.000.00$ - 0
Back Flow Preventer, Main GatePMInspection & Repairs (Mar & Sep)Semi-annual0.000.000.000.000.000.000.00$ - 0
Back Flow Preventer, WWTPPMInspection & Repairs (Mar & Sept)Semi-annual0.000.000.000.000.000.000.00$ - 0
Contact ChamberPMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Contact ChamberPMFully Pump down and WashedMonthly0.000.000.000.000.000.000.00$ - 0
Dechlorination ChamberPMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Dechlorination ChamberPMFully Pump down and WashedMonthly0.000.000.000.000.000.000.00$ - 0
Flow Meter and TelemetryPMReplace Supplies as necessary for GraphingSemi-annual0.000.000.000.000.000.000.00$ - 0
Lift Station #1PMGrease Removal as needed (6-8 times annually)Annually0.000.000.000.000.000.000.00$ - 0
Lift Station #2PMGrease Removal as needed (6-8 times annually)Annually0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #1PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #1PMRemoval and Impeller InspectionQuarterly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #1PMFloat InspectionWeekly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #2PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #2PMRemoval and Impeller InspectionQuarterly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #1/Pump #2PMFloat InspectionWeekly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #1PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #1PMRemoval and Impeller InspectionQuarterly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #1PMFloat InspectionWeekly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #2PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #2PMRemoval and Impeller InspectionQuarterly0.000.000.000.000.000.000.00$ - 0
Lift/Sewage Station #2/Pump #2PMFloat InspectionWeekly0.000.000.000.000.000.000.00$ - 0
RV Dump Station, Holding TanksPMHigh Level AlarmMonthly0.000.000.000.000.000.000.00$ - 0
RV Dump Station, Holding TanksPMDrain Hole CleaningWeekly0.000.000.000.000.000.000.00$ - 0
RV Dump Station, Holding TanksPMHolding Tank Level CheckWeekly0.000.000.000.000.000.000.00$ - 0
Settling Tank (Clarifier)PMWash down/pressure wash wall and weirs)Daily0.000.000.000.000.000.000.00$ - 0
Settling Tank (Clarifier)PMTouch up Paint (Apr & Oct)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge TankPMFull Pump Out & Paint touch up (Apr & Oct)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMBelt Replacement (May & Nov)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMFilter replacement (May & Nov)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMAlternate BlowersWeekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMBelt Inspection (Tension & Appearance)Weekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #1PMGreasing of Ball BearingsWeekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMBelt Replacement (May & Nov)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMFilter replacement (May & Nov)Semi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMAlternate BlowersWeekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMBelt Inspection (Tension & Appearance)Weekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Blower #2PMGreasing of Ball BearningsWeekly0.000.000.000.000.000.000.00$ - 0
Surge Tank, Pump #1PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Surge Tank, Pump #1PMRemoval and Impeller InspectionSemi-annual0.000.000.000.000.000.000.00$ - 0
Surge Tank, Pump #2PMVisual InspectionDaily0.000.000.000.000.000.000.00$ - 0
Surge Tank, Pump #2PMRemoval and Impeller InspectionSemi-annual0.000.000.000.000.000.000.00$ - 0

After Hours Service Calls

Sewage Plant Operator Total Hours 0.00 $ - 0

PUMP&HAUL

PUMP & HAUL

QTYUnit of MeasureUnit PriceTotal Extended Price
Base Year (PoP: 1 Apr 2026 - 31 Mar 2027)460,000Gallons$ - 0$ - 0
Option Year I (PoP: 1 Apr 2027 - 31 Mar 2028)200,000Gallons$ - 0$ - 0
Option Year II (PoP: 1 Apr 2028 - 31 Mar 2029)200,000Gallons$ - 0$ - 0
Option Year III (PoP: 1 Apr 2029 - 31 Mar 2030)200,000Gallons$ - 0$ - 0
Option Year IV (PoP: 1 Apr 2030 - 31 Mar 2031)200,000Gallons$ - 0$ - 0

SAMPLING

SAMPLING REQUIREMENTS
Short Stay Recreational Facility, Moncks Corner, SC
DESCRIPTIONTYPEFREQUENCYTOTAL FREQUENCYUNIT COSTTRAVEL FEETOTAL COST
Travel Fees (Lab personnel)WWTPN/A17$ - 0$ - 0$ - 0
Travel Fees (Lab shipping/outsource)WWTPN/A3$ - 0$ - 0$ - 0
BioChemical Oxygen Demand (BOD) - SM5210BWWTP1/Month12$ - 0$ - 0$ - 0
TSS (Total Suspended Solids) - SM 2540DWWTP1/Month12$ - 0$ - 0$ - 0
NH-N (Nitrigen-Ammonia Standard) - SM 4500HN3DB (Mar - Oct. & Nov. - Feb.)WWTP1/Month12$ - 0$ - 0$ - 0
TRC (total Residual Chlorine - SM 4500 CL-G)WWTP1/Month12$ - 0$ - 0$ - 0
DO (Field Desoved Oxygen - SM4500 OG)WWTP1/Month12$ - 0$ - 0$ - 0
pH (SM450011B)WWTP1/Month12$ - 0$ - 0$ - 0
Ceriodaphnia dubia Chronic Whole Effluient Toxicity @ CTC = 100%WWTP1/Year1$ - 0$ - 0$ - 0
E.coli (MPN/100ml) - SM 9223B NOTE: If E.coli daily maximum (as defined by R 61-68.B.29) during a calendar month reporitng period is less than equal to 349 MPN/100ml or the pro isions of R.61-68.E.14 (12). inlcuded as "Bacteria Supplemental Data Sheet"WWTP1/Month12$ - 0$ - 0$ - 0
E.coli (MPN/100ml) - SM 9223B NOTE: If E.coli daily maximum (as defined by R 61-68.B.29) during a calendar month reporitng period is less than equal to 349 MPN/100ml or the pro isions of R.61-68.E.14 (12). included as "Bacteria Supplemental Data Sheet"WWTP1/Month5$ - 0$ - 0$ - 0
Total Phosphorus - SM 4500 PBEWWTPSemi-Annual2$ - 0$ - 0$ - 0
Fecal Coliform - Colilert-18 ATP (https://scdhec.gov/natural-swimming-areas-water-samples-required)Swimming Area3 x per week (May - Sep)17$ - 0$ - 0$ - 0
Potable Water Analytical Testing (E-Coli, Field Trace Residual Chlorine & Total Coliform)WWTP1/Month6$ - 0$ - 0$ - 0
TOTAL$0.00
Note 1: Two extra tests added to accommodate pre-season testing in order to obtain DHEC public swimming permit
Note 3: Applies to all tests.
Note 4: Whole Effluent Toxicity Test

REPAIRS

REPAIRS (anticipated)
Water Water Treatment Plant
ITEMDESCRIPTIONU of MQTYUNIT COSTSUB-TOTALTOTAL COST
Equipment/Materials
ea0$ - 0$ - 0Note: This will be used as the format for submitting quotes for repairs requested under CLIN X0003. The contracting office may request a sample repair quote from the vendor at the time of formal solicitation.
ea0$ - 0$ - 0
$ - 0
Labor
hour0$ - 0$ - 0
hour0$ - 0$ - 0
$ - 0
Miscellaneous
Shippinglot0$ - 0$ - 0
Overhead%0%$ - 0$ - 0
Profit%0%$ - 0$ - 0
$ - 0
Limit of Liability (subtract)ea0$ (500.00)$ (500.00)
TOTAL COST:$ (500.00)
TOTAL COST:$ - 0
EST. OCCURANCES PER YEAR:1