Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf

PDF 6 MB Posted

Attached to
Joint Base Charleston Waste Water Treatment Plant Operation and Maintenance
Solicitation number
FA441826Q0031
Issued by

About this file

This document is a technical overview and site documentation for the Joint Base Charleston Short Stay (JB CHS-SS) Wastewater Treatment Plant (WWTP) located at Joint Base Charleston in South Carolina. The facility treats sanitary sewer influent from base operations and discharges treated effluent to Lake Moultrie. The WWTP employs a multi-stage treatment process consisting of preliminary treatment (barscreen), primary treatment (clarifiers), secondary biological treatment (two aeration basins with surge tank), tertiary filtration, and chlorination/dechlorination disinfection. Raw sanitary sewer enters through a 10-inch pipe to a wetwell and valve vault, then flows through two clarifiers and two aeration basins where blowers provide oxygen for microbial treatment. The treated wastewater then passes through an equalization weir, tertiary filter, and chlorination/dechlorination contact chamber before final discharge through an outlet pipe to Lake Moultrie.

The documentation includes site layout maps, process flow diagrams with color-coded flow lines (green for raw influent, purple for process wastewater, blue for treated effluent), and multiple site photographs showing the treatment basins, clarifiers, aeration equipment, chlorination and dechlorination chambers, and effluent sampling and holding infrastructure. Key components visible at the facility include a surge tank/aeration basin number one, aeration basin number two, two clarifiers, an equalization weir, a tertiary filter, a chlorination and dechlorination contact chamber, and supporting infrastructure including an office/storage building, wetwell, valve vault, and temporary effluent holding tank. The facility demonstrates active operations with water quality monitoring and sample collection procedures in place.

View the file

Other files

File Type Posted
Atch-01 WWTP O_M Services PWS_13 Jan 2026 - Rev 1.pdf PDF
Atch-06_QandA - Short Stay WWTP O_M.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet - Rev 1.pdf PDF
Atch-05_WWTP List of Repairs.pdf PDF
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003_05 Mar 2026.xlsx XLSX spreadsheet
Atch-02_Provisions and Clauses.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003.xlsx XLSX spreadsheet
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Attachment 03 Wage Determination 2015-4427 Rev 32.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
WWTP O_M Services PWS_16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JB CHS-SS

WWTP

NOTES

= Raw Sanitary Sewer (Influent)

= WWTP Process Wastewater (Ideal Flow Pattern)

= Treated Wastewater (EƯluent)

Photo 1 - JB CHS Short Stay Wastewater Treatment Plant Site Layout & Components

Wetwell

Valve Vault

Influent Pipe From Wetwell

Surge Tank / Aeration Basin #1

Aeration Basin #2

Clarifiers (2)

Equalization Wier

Photo 2 - JB CHS Short Stay Wastewater Treatment Plant Site Layout & Components

Tertiary Filter

Cl and De-Cl Contact Chamber

Surge Tank / Aeration Basin #1

Effluent Outlet Pipe To Lake Moultrie

Office/Storage

Photo 3 - JB CHS Short Stay Wastewater Treatment Plant Site Layout & Components Viewing from the Top Side

Surge Tank / Aeration Basin #1 Equalization

Wier

Aeration Basin #2

Clarifiers (2) Tertiary Filter

Cl and De-Cl Contact Chamber

Photo 4 - JB CHS Short Stay Wastewater Treatment Plant Site Layout & Components Viewing from the Top Side

Aeration Basin #2

Clarifiers (2)

Surge Tank / Aeration Basin #1

Tertiary Filter

Cl and De-Cl Contact Chamber

Photo 5 - View of the Chlorination(left) and Dechlorination (right) Chamber

Photo 6 – EƯluent Water Quality Sample Collection Photo 7 - EƯluent Holding Tank (Temporary)

File details come from the government source that posted it. Updated .