Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet - Rev 1.pdf

PDF 80 KB Posted

Attached to
Joint Base Charleston Waste Water Treatment Plant Operation and Maintenance
Solicitation number
FA441826Q0031
Issued by

About this file

This document is a Preventive Maintenance and Inspection (PMI) Schedule for a Wastewater Treatment Plant (WWTP). The schedule outlines 77+ maintenance tasks across multiple system components with varying frequencies ranging from daily to annual intervals.

The schedule covers maintenance for backflow preventers (three locations), lift/sewage stations (two stations with dual pumps each), surge tanks (three pumps and two blowers), aeration basins (two blowers), settling tanks/clarifiers, tertiary tanks (two blowers and mudwell pumps), contact chambers, dechlorination chambers, emergency generators, RV dump station septic tanks, potable water lines, and effluent flow meters. Daily inspection tasks include visual checks on all pumps and blowers, air scour and backflush of tertiary filters, and washdown of settling tank walls. Weekly tasks involve float inspections, belt inspections, bearing lubrication, and blower alternation. Quarterly work includes pump impeller inspections and tertiary filter cleaning. Semi-annual maintenance (March/September and May/November) encompasses backflow preventer inspections, pump and impeller removals, filter replacements, belt replacements, and full tank pumpouts with touch-up painting. Annual tasks include mudwell pump removals, emergency generator fuel/oil checks (with biweekly checks during hurricane season July-November), RV septic tank pumpouts timed before Memorial Day, Independence Day, and Labor Day, potable line analytical testing, and effluent flow meter calibration. Grease removal at the lift stations is scheduled as-needed, approximately 6-8 times annually. The document includes blank columns for recording completion dates and notes regarding operational feasibility for submerged pump inspections.

View the file

Other files

File Type Posted
Atch-01 WWTP O_M Services PWS_13 Jan 2026 - Rev 1.pdf PDF
Atch-06_QandA - Short Stay WWTP O_M.pdf PDF
Atch-05_WWTP List of Repairs.pdf PDF
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003_05 Mar 2026.xlsx XLSX spreadsheet
Atch-02_Provisions and Clauses.pdf PDF
Atch-04_RFQ Pricing Workbook WWTP OM_FA441826Q0003.xlsx XLSX spreadsheet
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Attachment 03 Wage Determination 2015-4427 Rev 32.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
WWTP O_M Services PWS_16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily Count System Task Frequency Completed Date

1 Back Flow Preventer - Main Gate Semi-Annual Inspecton and Repair (Mar & Sept) S 2 Back Flow Preventer - RV Dump Station Semi-Annual Inspecton and Repair (Mar & Sept) S 3 Back Flow Preventer -WWTP Semi-Annual Inspecton and Repair (Mar & Sept) S 4 Lift/Sewage Station #1, Pump #1 Daily Visual Inspection D 5 Lift/Sewage Station #1, Pump #1 Weekly Float Inspection W 6 Lift/Sewage Station #1, Pump #1 Quarterly Removal and Impeller Inspection Q 7 Lift/Sewage Station #1, Pump #2 Daily Visual Inspection D 8 Lift/Sewage Station #1, Pump #2 Weekly Float Inspection W 9 Lift/Sewage Station #1, Pump #2 Quarterly Removal and Impeller Inspection Q

10 Lift/Sewage Station #1 Grease Removal as needed (6-8 times annually) TBD 11 Lift/Sewage Station #2, Pump #1 Daily Visual Inspection D 12 Lift/Sewage Station #2, Pump #1 Weekly Float Inspection W 13 Lift/Sewage Station #2, Pump #1 Quarterly Removal and Impeller Inspection Q 14 Lift/Sewage Station #2, Pump #2 Daily Visual Inspection D 15 Lift/Sewage Station #2, Pump #2 Weekly Float Inspection W 16 Lift/Sewage Station #2, Pump #2 Quarterly Removal and Impeller Inspection Q 17 Lift/Sewage Station #2 Grease Removal as needed (6-8 times annually) TBD 18 Surge Tank, Pump #1 Daily Visual Inspection D 19 Surge Tank, Pump #1 Semi-Annual Removal and Impeller Inspection S 20 Surge Tank, Pump #2 Daily Visual Inspection D 21 Surge Tank, Pump #2 Semi-Annual Removal and Impeller Inspection S 22 Surge Tank, Pump #3 Daily Visual Inspection D 23 Surge Tank, Pump #3 Semi-Annual Removal and Impeller Inspection S 24 Surge Tank, Blower #1 Daily Visual Inspection D 25 Surge Tank, Blower #1 Weekly Belt Inspection (Tension & Appearance) W 26 Surge Tank, Blower #1 Weekly Greasing of Ball Bearings W 27 Surge Tank, Blower #1 Weekly Alternate Blowers W 28 Surge Tank, Blower #1 Semi-Annual Filter Replacement (May & Nov) S 29 Surge Tank, Blower #1 Semi-Annual Filter Replacement (May & Nov) S 30 Surge Tank, Blower #2 Daily Visual Inspection D 31 Surge Tank, Blower #2 Weekly Belt Inspection (Tension & Appearance) W 32 Surge Tank, Blower #2 Weekly Greasing of Ball Bearings W 33 Surge Tank, Blower #2 Weekly Alternate Blowers W 34 Surge Tank, Blower #2 Semi-Annual Filter Replacement (May & Nov) S 35 Surge Tank, Blower #2 Semi-Annual Filter Replacement (May & Nov) S 36 Surge Tank Semi-Annual Full Pump Out & Touch Up Paint (April & Oct) S 37 Aeration Basin, Blower #1 Daily Visual Inspection D 38 Aeration Basin, Blower #1 Weekly Belt Inspection (Tension & Appearance) W 39 Aeration Basin, Blower #1 Weekly Greasing of Ball Bearings W 40 Aeration Basin, Blower #2 Daily Visual Inspection D 41 Aeration Basin, Blower #2 Weekly Belt Inspection (Tension & Appearance) W 42 Aeration Basin, Blower #2 Weekly Greasing of Ball Bearings W 43 Aeration Basin Semi-Annual Full Pump Out & Touch Up Paint (April & Oct) S 44 Settling Tank (Clarifier) Daily Wash down/pressure wash of walls and weirs D 45 Settling Tank (Clarifier) Semi-Annual Full Pump Out & Touch Up Poaint (April & Oct) S 46 Tertiary Tank, Blower #1 Daily Visual Inspection D 47 Tertiary Tank, Blower #1 Weekly Belt Inspection (Tension & Appearance) W 48 Tertiary Tank, Blower #1 Weekly Greasing of Ball Bearings W 49 Tertiary Tank, Blower #1 Weekly Alternate Blowers W 50 Tertiary Tank, Blower #1 Semi-Annual Filter Replacement (May & Nov) S 51 Tertiary Tank, Blower #1 Semi-Annual Belt Replacement (May & Nov) S 52 Tertiary Tank, Blower #2 Daily Visual Inspection D 53 Tertiary Tank, Blower #2 Weekly Belt Inspection (Tension & Appearance) W 54 Tertiary Tank, Blower #2 Weekly Greasing of Ball Bearings W 55 Tertiary Tank, Blower #2 Weekly Alternate Blowers W 56 Tertiary Tank, Blower #2 Semi-Annual Filter Replacement (May & Nov) S 57 Tertiary Tank, Blower #2 Semi-Annual Belt Replacement (May & Nov) S 58 Tertiary Filters Daily air Scour and Back Flush D 59 Tertiary Filters adjoin Settling Basin Quarterly Cleaning Q 60 Tertiary Tank, Mudwell Pump #1 Daily Visual Inspection D 61 Tertiary Tank, Mudwell Pump #1 Annual Removal and Inspection A 62 Tertiary Tank, Mudwell Pump #2 Daily Visual Inspection D 63 Tertiary Tank, Mudwell Pump #2 Annual Removal and Inspection A 64 Tertiary Tank, Mudwell Annual Full Pump Down and Walls are Washed Down A 65 Contact Chamber Daily Visual Inspection D 66 Contact Chamber Monthly Full Pump Down and Washed M 67 Dechlorination Chamber Daily Visual Inspection D 68 Dechlorination Chamber Monthly Full Pump Down and Wash/Disinfect include Tablet Feeder M 69 Emergency Generator Weekly Test Run W 70 Emergency Generator Fuel/Oil Amount Checked before Hurricane Season Starts (June) A 71 Emergency Generator Bi-Weekly Fuel/Oil Amount Checked during Hurricane Season (Jul-Nov) B 72 RV Dump Station, Septic Tank Daily Visual Inspection D 73 RV Dump Station, Septic Tank Full Pump Out Week Prior to Memorial Day (mid-May) A 74 RV Dump Station, Septic Tank Full Pump Out Week Prior to Independence Day (late-June) A 75 RV Dump Station, Septic Tank Full Pump Out Week Prior to Labor Day (late August) A 76 Potable Lines, Supply Drinking Water Monthly Analytical Testing M 77 Effluent Flow Meter Annual Calibration A

1174363320C Cross-Out

1174363320C Cross-Out

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily System Task Frequency Date Completed Tertiary Tank, Mudwell Pump #1 Annual Removal and Inspection A Tertiary Tank, Mudwell Pump #2 Annual Removal and Inspection A Tertiary Tank, Mudwell Annual Full Pump Down, all walls cleaned/pressure washed, sediment/debris removed A Emergency Generator Fuel/Oil Amount Checked before Hurricane Season Starts (June) A RV Dump Station, Septic Tank Full Pump Out Week Prior to Memorial Day (mid-May) A RV Dump Station, Septic Tank Full Pump Out Week Prior to Independence Day (late-June) A RV Dump Station, Septic Tank Full Pump Out Week Prior to Labor Day (late August) A Weirs, Troughs, Channels Cleaned/pressure washed, and sediment/debris removed Sludge Holding Chamber Pumped out (as needed) Effluent Flow Meter Annual Calibration A

WWTP - PMI Schedule Frequency: A= Annual, S= Semi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily System Task Frequency Completed Date Back Flow Preventer - Main Gate Semi-Annual Inspecton and Repair (Mar & Sept) S Back Flow Preventer - RV Dump Station Semi-Annual Inspecton and Repair (Mar & Sept) S Back Flow Preventer -WWTP Semi-Annual Inspecton and Repair (Mar & Sept) S Surge Tank, Pump #1 Semi-Annual Removal and Impeller Inspection S Surge Tank, Pump #2 Semi-Annual Removal and Impeller Inspection S Surge Tank, Pump #3 Semi-Annual Removal and Impeller Inspection S Surge Tank, Blower #1 Semi-Annual Filter Replacement (May & Nov) S Surge Tank, Blower #1 Semi-Annual Belt Replacement (May & Nov) S Surge Tank, Blower #2 Semi-Annual Filter Replacement (May & Nov) S Surge Tank, Blower #2 Semi-Annual Belt Replacement (May & Nov) S Surge Tank Semi-Annual Full Pump Out & Touch Up Paint (April & Oct) S Aeration Basin Semi-Annual Full Pump Out & Touch Up Paint (April & Oct) S Settling Tank (Clarifier) Semi-Annual Full Pump Out & Touch Up Poaint (April & Oct) S Tertiary Tank, Blower #1 Semi-Annual Filter Replacement (May & Nov) S Tertiary Tank, Blower #1 Semi-Annual Belt Replacement (May & Nov) S Tertiary Tank, Blower #2 Semi-Annual Filter Replacement (May & Nov) S Tertiary Tank, Blower #2 Semi-Annual Belt Replacement (May & Nov) S

1174363320C Cross-Out

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily

Lift/Sewage Station #1, Pump #1 Quarterly Removal and Impeller Inspection Q Lift/Sewage Station #1, Pump #2 Quarterly Removal and Impeller Inspection Q Lift/Sewage Station #2, Pump #1 Quarterly Removal and Impeller Inspection Q Lift/Sewage Station #2, Pump #2 Quarterly Removal and Impeller Inspection Q Tertiary Filters adjoin Settling Basin Quarterly Cleaning Q

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily

Contact Chamber Monthly Full Pump Down, all walls cleaned/pressure washed M Dechlorination Chamber Monthly Full Pump Down, all walls cleaned/pressure washed and Disinfect include Tablet Feeder M Potable Lines, Supply Drinking Water Monthly Analytical Testing M All Plant Blowers Lubricate bearings M Aeration basin Replenish Wastewater Food Supplement As needed

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily

Emergency Generator Bi-Weekly Fuel/Oil Amount Checked during Hurricane Season (Jul-Nov) B

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily

Lift/Sewage Station #1, Pump #1 Daily Visual Inspection D Lift/Sewage Station #1, Pump #2 Daily Visual Inspection D Lift/Sewage Station #2, Pump #1 Daily Visual Inspection D Lift/Sewage Station #2, Pump #2 Daily Visual Inspection D Surge Tank, Pump #1 Daily Visual Inspection D Surge Tank, Pump #2 Daily Visual Inspection D Surge Tank, Pump #3 Daily Visual Inspection D Surge Tank, Blower #1 Daily Visual Inspection D Surge Tank, Blower #2 Daily Visual Inspection D Aeration Basin, Blower #1 Daily Visual Inspection D Aeration Basin, Blower #2 Daily Visual Inspection D Settling Tank (Clarifier) Daily Wash down/pressure wash of walls and weirs D Tertiary Tank, Blower #1 Daily Visual Inspection D Tertiary Tank, Blower #2 Daily Visual Inspection D Tertiary Filters Daily air Scour and Back Flush D Tertiary Tank, Mudwell Pump #1 Daily Visual Inspection D Tertiary Tank, Mudwell Pump #2 Daily Visual Inspection D Contact Chamber Daily Visual Inspection D Dechlorination Chamber Daily Visual Inspection D RV Dump Station, Septic Tank Daily Visual Inspection D Clarifier Exercise Air lift sludge return

Lift/Sewage station pumps, Surge tank pumps, and Tertiary mudwell pumps are always submerged in water therefore a visual inspection isnt feasable. Daily operation check may be more practical.

WWTP - PMI Schedule Frequency: A= Annual, S= Simi-Annual, Q= Quarterly, B= Biweekly, W= Weekly, D= Daily

Lift/Sewage Station #1 Grease Removal as needed (6-8 times annually) TBD Lift/Sewage Station #2 Grease Removal as needed (6-8 times annually) TBD

PMI's
Annual
Semi-Annual
Quarterly
Monthly
Bi-Weekly
Daily
TBD