Attch_03_01_14_00_WORK_RESTRICTIONS.pdf

PDF 36 KB Posted

Attached to
Repair/Replace Various Roofs Federal contract opportunity
Solicitation number
FA4418-15-R-0017
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Replace Various Roofs, newest first.
File Type Posted
Site_Visit_Mtg_Mins.pdf PDF
3_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Framing.pdf PDF
31_-_Plan_Dwg_Sht_A-46_Bldg_3270.pdf PDF
8_-_Plan_Dwg_Sht_Bldg_419_Various_Sections.pdf PDF
25_-_Plan_Dwg_Sht_A-40_Bldg_3270.pdf PDF
7_-_Plan_Dwg_Sht_Bldg_419_Roof_Section.pdf PDF
21_-_Plan_Dwg_Sht_A-24_Bldg_3270.pdf PDF
23_-_Plan_Dwg_Sht_A-37_Bldg_3270.pdf PDF
15_-_Plan_Dwg_Sht_A-4_Bldg_3270.pdf PDF
28_-_Plan_Dwg_Sht_A-43_Bldg_3270.pdf PDF
12_-_Plan_Dwg_Sht_A-1_Bldg_3270.pdf PDF
14_-_Plan_Dwg_Sht_A-3_Bldg_3270.pdf PDF
6_-_Plan_Dwg_Sht_Bldg_419_Roof_Framing.pdf PDF
5_-_Plan_Dwg_Sht_Bldg_419_Floor_Plan.pdf PDF
24_-_Plan_Dwg_Sht_A-38_Bldg_3270.pdf PDF
26_-_Plan_Dwg_Sht_A-41_Bldg_3270.pdf PDF
16_-_Plan_Dwg_Sht_A-8_Bldg_3270.pdf PDF
27_-_Plan_Dwg_Sht_A-42_Bldg_3270.pdf PDF
9_-_Plan_Dwg_Sht_Bldg_3305_Roof.pdf PDF
17_-_Plan_Dwg_Sht_A-9_Bldg_3270.pdf PDF
22_-_Plan_Dwg_Sht_A-36_Bldg_3270.pdf PDF
FA4418-15-R-0017-0001.pdf PDF
19_-_Plan_Dwg_Sht_A-12_Bldg_3270.pdf PDF
Q A_2.pdf PDF
18_-_Plan_Dwg_Sht_A-11_Bldg_3270.pdf PDF
1_-_Plan_Dwg_Sht_Bldg_31_Roof_Plan.pdf PDF
2_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Floor.pdf PDF
33_-_Plan_Dwg_Sht_A-48_Bldg_3270.pdf PDF
20_-_Plan_Dwg_Sht_A-14_Bldg_3270.pdf PDF
30_-_Plan_Dwg_Sht_A-45_Bldg_3270.pdf PDF
13_-_Plan_Dwg_Sht_A-2_Bldg_3270.pdf PDF
Q A_1.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
Attch_01_Table_of_Contents.pdf PDF
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
Attch_19_Part_3_Bldg_3270_Roof_Repair.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attch_18_Part_3_Bldg_31-209-419-3305-3371_Roof_Repair.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attch_21_Wage_Determination.pdf PDF
Show all 50

Repair/Replace Various Roofs has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBCGS SECTION 01 14 00

WORK RESTRICTIONS

06/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals list of contact personnel; G

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

It should be recognized that requirements for security and base access varies between various locations within Joint Base Charleston. It is incumbent on the Contractor to ascertain the current security and base access requirements appropriate to the project location and incorporate the cost, if any, for compliance to said requirements into Contractor's proposal. Lack of knowledge of current requirements does not constitute a basis for an adjustment to the contract. Should requirements change during the construction timeframe, Contractor may be eligible, subject to documentation acceptable to the Government, for an adjustment to the contract.

Ensure that all Contractor personnel employed on Joint Base Charleston become familiar with and obey Installation regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.2.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.1.2 Identification Badges and Installation Access

Identification badges, if required, may be furnished without charge under certain circumstances. Confirm security requirements with the Contracting Officer. Application for and use of badges will be as directed. Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/files/form/I-9_IFR_02-02-09.pdf. Immediately report

1179187112C Typewritten Text Solicitation FA4418-15-R-0017

1179187112C Typewritten Text Attachment #3

1179187112C Typewritten Text instances of lost or stolen badges to the Contracting Officer.

1.2.1.3 Tobacco Use Policy

Tobacco use is prohibited within and outside of all buildings on installation, except in designated Tobacco Use Areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated Tobacco Use Areas.

1.2.2 Working Hours

Regular working hours must consist of an 8 1/2 hour period established by the Contractor Officer, between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.2.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.2.4 Occupied Buildings

Do not enter occupied buildings without prior approval of the Contracting Officer.

Existing buildings and their contents must be kept secure at all times.

Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material during the construction period.

Relocate movable furniture away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect against damage, or temporarily disconnect, relocate, protect, and reinstall at the completion of the work.

1.2.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and natural gas are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services without Government notification and approval. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --