Q A_2.pdf

PDF 16 KB Posted

Attached to
Repair/Replace Various Roofs Federal contract opportunity
Solicitation number
FA4418-15-R-0017
Issued by
Department of the Air Force Air Mobility Command

About this file

Remaining Q A

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Replace Various Roofs, newest first.
File Type Posted
Site_Visit_Mtg_Mins.pdf PDF
23_-_Plan_Dwg_Sht_A-37_Bldg_3270.pdf PDF
15_-_Plan_Dwg_Sht_A-4_Bldg_3270.pdf PDF
28_-_Plan_Dwg_Sht_A-43_Bldg_3270.pdf PDF
12_-_Plan_Dwg_Sht_A-1_Bldg_3270.pdf PDF
14_-_Plan_Dwg_Sht_A-3_Bldg_3270.pdf PDF
6_-_Plan_Dwg_Sht_Bldg_419_Roof_Framing.pdf PDF
5_-_Plan_Dwg_Sht_Bldg_419_Floor_Plan.pdf PDF
24_-_Plan_Dwg_Sht_A-38_Bldg_3270.pdf PDF
26_-_Plan_Dwg_Sht_A-41_Bldg_3270.pdf PDF
16_-_Plan_Dwg_Sht_A-8_Bldg_3270.pdf PDF
27_-_Plan_Dwg_Sht_A-42_Bldg_3270.pdf PDF
9_-_Plan_Dwg_Sht_Bldg_3305_Roof.pdf PDF
17_-_Plan_Dwg_Sht_A-9_Bldg_3270.pdf PDF
22_-_Plan_Dwg_Sht_A-36_Bldg_3270.pdf PDF
FA4418-15-R-0017-0001.pdf PDF
19_-_Plan_Dwg_Sht_A-12_Bldg_3270.pdf PDF
18_-_Plan_Dwg_Sht_A-11_Bldg_3270.pdf PDF
1_-_Plan_Dwg_Sht_Bldg_31_Roof_Plan.pdf PDF
3_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Framing.pdf PDF
31_-_Plan_Dwg_Sht_A-46_Bldg_3270.pdf PDF
8_-_Plan_Dwg_Sht_Bldg_419_Various_Sections.pdf PDF
25_-_Plan_Dwg_Sht_A-40_Bldg_3270.pdf PDF
7_-_Plan_Dwg_Sht_Bldg_419_Roof_Section.pdf PDF
21_-_Plan_Dwg_Sht_A-24_Bldg_3270.pdf PDF
2_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Floor.pdf PDF
33_-_Plan_Dwg_Sht_A-48_Bldg_3270.pdf PDF
20_-_Plan_Dwg_Sht_A-14_Bldg_3270.pdf PDF
30_-_Plan_Dwg_Sht_A-45_Bldg_3270.pdf PDF
13_-_Plan_Dwg_Sht_A-2_Bldg_3270.pdf PDF
Q A_1.pdf PDF
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
Attch_01_Table_of_Contents.pdf PDF
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_19_Part_3_Bldg_3270_Roof_Repair.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attch_18_Part_3_Bldg_31-209-419-3305-3371_Roof_Repair.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attch_21_Wage_Determination.pdf PDF
Show all 50

Repair/Replace Various Roofs has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4418-15-R-0017

Repair Various Roofs

Joint Base Charleston Weapons Station, SC Q&A- 2

1. COMMENT: On the Army Reserve Building, we mentioned on-site revising to request a thermal scan and a price to retrofit leaving the current system in place to help the Government achieve a savings that could be very useful in reaching the budget on the project overall. We also, need the as-built docs as mentioned above so that we are aware of the current R-Value on each facility. This will allow the contractors to include for additional insulation if required. I would like to point out that just as the ACM Report will work, if there is wet insulation it will not be discovered until after award of the contract therefore there would need to be a line item cost for insulation replacement if required as well.

ANSWER: The government does not have any provisions to do an infrared scan of any of the buildings. For bidding purposes, all contractors shall submit pricing in accordance with the Statement of Work, Division 1 Guide Specifications, and Drawings.

2. QUESTION: On building 419 there were many pieces of dilapidated and broken equipment on the rooftop. Can you verify what is abandoned and what is to be removed and closed off in the roof decks?

ANSWER: All dilapidated ventilation equipment on the top levels of the roof, i.e., those levels that cover the loading docks on either side of the building, shall be removed from the roof and then the roof decking should be repaired and covered over with new modified bitumen roof system. If curbs that have previously been capped off are encountered, those curbs should be removed from the roof system and covered with new decking and roofing material; this applies not only to building 419 but also for any building where old curbs are encountered and the roof system is being replaced.

3. QUESTION: On Building 419, if the metal roofs do in fact become a concern, considering the shape they are in, would the Government entertain a coating application to achieve a new system and warranty? That would also be another major cost savings compared to removal and complete replacement.

ANSWER: This question pertains to building 3270. For bidding purposes, all contractors shall submit pricing in accordance with the Statement of Work, Division 1 Guide Specifications, and Drawings.

4. QUESTION: Based on the discussions held on the largest of the roofs, the Army Reserve

Center, would you consider a High Quality Coatings application over this roof as a Retrofit system. This would create a huge savings to the Government and is a highly effective system with slopes this great.

ANSWER: For bidding purposes, all contractors shall submit pricing in accordance with the Statement of Work, Division 1 Guide Specifications, and Drawings.

5. QUESTION: At Bldg 3305, will gutters and downspouts be replaced and if so is it only replacement of gutters and downspouts where they currently exist or will all eaves receive new gutters with downspouts?

ANSWER: Existing gutters and downspouts may be kept in place and worked around. For bidding purposes, all contractors shall submit pricing in accordance with the Statement of Work, Division 1 Guide Specifications, and Drawings.

6. QUESTION: At Bldg 3270, can the CO provide clarification to what specific scope is required for the metal roof areas?

7. QUESTION: At Bldg 3270, will the CO consider permitting an IR thermal scan of the roof, replacement of wet roofing and then installation of a new roof system over the existing?

ANSWER: The government does not have any provisions to do an infrared scan of any of the buildings. For bidding purposes, all contractors shall submit pricing in accordance with the Statement of Work, Division 1 Guide Specifications, and Drawings.

8. QUESTION: At Bldg 419, this roof is in pretty good condition itself and not in need of replacement. Based on this we would recommend the Owner consider a High Solids Silicone coating system with a 10-year manufacturer and 2-year contractor warranty. The coating system will extend the service life of the existing roof AT LEAST another 10 years or more.

9. QUESTION: At Bldg 419, there is some equipment on the roof which is possibly abandoned and can be removed. Can the CO provide clarification about if they would want this removed and if so, what steps will be required? Only remove and install cover over curbs? Remove and equipment and curbs and patch decking and roofing? Etc?

ANSWER: All dilapidated ventilation equipment on the top levels of the roof, i.e., those levels that cover the loading docks on either side of the building, shall be removed from the roof and then the roof decking should be repaired and covered over with new modified bitumen roof system. If curbs that have previously been capped off are encountered, those curbs should be removed from the roof system and covered with new decking and roofing material; this applies not only to building 419 but also for any building where old curbs are encountered and the roof system is being replaced.