Attachment 7

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Replace Various Roofs, newest first.
File Type Posted
Site_Visit_Mtg_Mins.pdf PDF
3_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Framing.pdf PDF
31_-_Plan_Dwg_Sht_A-46_Bldg_3270.pdf PDF
8_-_Plan_Dwg_Sht_Bldg_419_Various_Sections.pdf PDF
25_-_Plan_Dwg_Sht_A-40_Bldg_3270.pdf PDF
7_-_Plan_Dwg_Sht_Bldg_419_Roof_Section.pdf PDF
21_-_Plan_Dwg_Sht_A-24_Bldg_3270.pdf PDF
23_-_Plan_Dwg_Sht_A-37_Bldg_3270.pdf PDF
15_-_Plan_Dwg_Sht_A-4_Bldg_3270.pdf PDF
28_-_Plan_Dwg_Sht_A-43_Bldg_3270.pdf PDF
12_-_Plan_Dwg_Sht_A-1_Bldg_3270.pdf PDF
14_-_Plan_Dwg_Sht_A-3_Bldg_3270.pdf PDF
6_-_Plan_Dwg_Sht_Bldg_419_Roof_Framing.pdf PDF
5_-_Plan_Dwg_Sht_Bldg_419_Floor_Plan.pdf PDF
24_-_Plan_Dwg_Sht_A-38_Bldg_3270.pdf PDF
26_-_Plan_Dwg_Sht_A-41_Bldg_3270.pdf PDF
16_-_Plan_Dwg_Sht_A-8_Bldg_3270.pdf PDF
27_-_Plan_Dwg_Sht_A-42_Bldg_3270.pdf PDF
9_-_Plan_Dwg_Sht_Bldg_3305_Roof.pdf PDF
17_-_Plan_Dwg_Sht_A-9_Bldg_3270.pdf PDF
22_-_Plan_Dwg_Sht_A-36_Bldg_3270.pdf PDF
FA4418-15-R-0017-0001.pdf PDF
19_-_Plan_Dwg_Sht_A-12_Bldg_3270.pdf PDF
Q A_2.pdf PDF
18_-_Plan_Dwg_Sht_A-11_Bldg_3270.pdf PDF
1_-_Plan_Dwg_Sht_Bldg_31_Roof_Plan.pdf PDF
2_-_Plan_Dwg_Sht_Bldg_209_Mezzanine_Floor.pdf PDF
33_-_Plan_Dwg_Sht_A-48_Bldg_3270.pdf PDF
20_-_Plan_Dwg_Sht_A-14_Bldg_3270.pdf PDF
30_-_Plan_Dwg_Sht_A-45_Bldg_3270.pdf PDF
13_-_Plan_Dwg_Sht_A-2_Bldg_3270.pdf PDF
Q A_1.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attch_01_Table_of_Contents.pdf PDF
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_19_Part_3_Bldg_3270_Roof_Repair.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attch_18_Part_3_Bldg_31-209-419-3305-3371_Roof_Repair.pdf PDF
Attch_21_Wage_Determination.pdf PDF
Show all 50

Repair/Replace Various Roofs has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBCGS SECTION 01 33 16

DESIGN AFTER AWARD

06/15

PART 1 GENERAL

1.1 DESIGN RESPONSIBILITY

The Contractor shall furnish and be responsible for a complete set of design documents as called for hereinafter. Design shall be completed by Design Professionals (Architects and Engineers), registered and licensed in good standing in the State of South Carolina.

1.2 SUBMITTALS

Government approval is required for submittals with a “G” designation;

submittals not having a “G” designation are for information only. When used, a designation following the “G” designation identifies the office which will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES, except as modified herein:

SD-01 Preconstruction Submittals

Fast Track Design Submittal; G (CENMP)

Preliminary (35%) Design Submittal; G (CENMP)

Intermediate (65%) Design Submittal; G (CENMP)

Pre-Final (95%) Design Submittal; G (CENMP)

Final (100%) Design Submittal; G (CENMP)

Final (100%) Design Submittal; G (CENMP)

Structural Interior Design (SID) Submittal; G (CENMP)

Comprehensive Interior Design (CID) Submittal; G (CENMP)

Permits; G (CEIE)

Design Review Meeting Minutes

1.3 DESIGN SUBMITTALS

The Contractor shall submit the design in different phases and different stages to the Government for review. The number and requirements of each design submittal are listed below in the SUBMITTAL DISTRIBUTION chart below.

The number and contents of the design submittals shall be reflected in the Contractor's progress charts. All comments for each submittal shall have been annotated and incorporated into the design before approval is granted by the Contracting Officer.

Items of work not Fast-Tracked shall be submitted in complete packages as outlined in the following paragraphs. Partial design submissions of various portions of the project other than those identified for fast-tracking will not be allowed.

1179187112C Typewritten Text FA4418-15-R-0017 Attachment #7

1.3.1 FAST TRACKING

The contractor may at his option, "fast track" the design. The contractor shall specifically identify Fast Track items of work in the design schedule as required by the paragraph entitled DESIGN SCHEDULE. Fast Track items of work identified on the approved design schedule may be initially designed to the 100% stage, and submitted with the Preliminary (35%) Design Submittal.

The drawings, however, must exhibit a completed understanding of the final design and indicate all items to be installed on this site and below the building slab including all utilities. An Intermediate Backcheck Submittal shall be provided for Fast-Tracked items for review and approval by the Government, so that a Partial Notice To Proceed (NTP) can be issued to the contractor for that portion of the work.

1.3.2 PRELIMINARY (35%) DESIGN SUBMITTAL

The Preliminary (35%) Design Submittal is a narrative with design analysis and drawings presenting the design and containing sufficient information to permit the reviewer to clearly understand the functional and technical approach the designer is following to complete the project.

As a minimum, the narrative shall discuss the civil, site engineering and architectural requirements; construction materials and finishes; structural and foundation system; communications systems; power and electrical systems;

force protection; sustainable design and development features most favorable for this project; and plumbing and HVAC systems. Items or details which cannot adequately be described in narrative form should be graphically shown on fold-out drawings, sketches, tabulations, and/or photographs bound in a brochure or notebook. An estimate of time and phasing will also be included in the submittal. In addition, an index of the anticipated guide specifications to be utilized for the design shall be included. Design will be stopped for this review phase unless stated otherwise by specific instructions and the installation has approval authority for concept design(s) shown in this submittal.

1.3.3 INTERMEDIATE (65%) DESIGN SUBMITTAL

The Intermediate (65%) Design Submittal is a major design submittal consisting of a significant expansion of the Preliminary (35%) design submittal. The submittal will represent design progress halfway from concept acceptance to the final design phase. The intent is to check progress and layouts per customer and reviewers comments. Design effort toward final design will stop at this submittal until receipt of comments. Prior to submitting the finished preliminary design, the AE shall ensure that the design has been thoroughly checked and coordinated between various design specialties. The submittal will include a tabulation recapitulating the total utility system loads -electrical, steam, gas, sanitary sewer, water, etc. - giving the point of connection into the existing utility systems. Any unusual utility system aspects of the project, especially those requiring resolution prior to final design, will be commented upon. The average annual energy use per square foot of net floor area shall be calculated and stated in BTU per square foot.

1.3.4 PRE-FINAL (95%) DESIGN SUBMITTAL

The Pre-Final (95%) Design Submittal includes copies of bid documents (Completed Drawings, Specifications, and supporting documentation) ready to construct with all design work complete. Prior to submission the AE shall make a thorough check of plans, specifications, and all other required data to eliminate errors, inconsistencies, and for coordination between architectural, structural, mechanical, and other applicable phases of the work. Final reproducible specifications shall be completely proofed and corrected to eliminate typographical errors, misspelled words, etc. Copies of internal design quality control checklists shall be included with the submittal. After the Pre-Final submittal review is complete, the review comments will be furnished to the AE by the Government. Notice to proceed on final design will be by separate letter signed by the Contracting Officer upon the Contractor’s resolution of any comments generated during the review of the Pre-Final Design Submittal.

1.3.5 FINAL (100%) DESIGN SUBMITTAL

The Final (100%) Design Submittal includes copies of Completed Drawings, Specifications, and supporting documentation ready to construct with all design work complete and all comments incorporated. Drawings and specifications shall be signed and sealed and marked as FINAL SUBMITTALS.

1.3.6 STRUCTURAL INTERIOR DESIGN (SID) SUBMITTAL

The Structural Interior Design includes selection, specification and installation of all the building related finishes, materials and colors. All SID materials, finishes and colors shall be reviewed by the Government for compliance with the RFP. All SID submittals will run concurrent with the Architectural design submittals.

1.3.6.1 SID PREDEFINITION CONFERENCE

The Contractor shall lead an on-site predefinition conference at attended by Government personnel. The purpose of the predefinition conference is to present and discuss the SID color scheme for the project. Actual exterior and interior materials, finishes and colors are to be provided for review and comment. The Contractor may provide colored exterior elevations/perspectives of the SID color scheme to assist in the discussion of the SID. At the end of the predefinition conference, the Government will decide the necessary adjustments needed to the SID and this information will be used by the Contractor to further develop the project.

1.3.7 COMPREHENSIVE INTERIOR DESIGN (CID) SUBMITTAL

The Comprehensive Interior Design (CID) includes the design and specification of all moveable furnishings for all occupied and unoccupied areas. The CID may include any other space for personnel and/or guest activities. Movable furnishings shall include but are not limited to accessories (trash containers, artwork, etc. all kinds), chairs (all kinds), desk (all kinds), table (all kinds), furniture systems (all kinds), equipment (refrigerators, washers and dryers, kitchen appliances and equipment, etc.), and furniture.

The design of the CID shall be the responsibility of the Contractor. The Design Build Contractor will be responsible for insuring the building systems electrical, data and communication devices are correctly placed based on the furniture footprint plan provided, the individual room narratives and the Facility Space Program outlined. For coordination and review purposes, a copy of the furniture footprint plan is to be provided in each submittal.

1.3.8 PERMITS

Prior to start of construction, the Contractor is responsible for identifying and obtaining all necessary permits and licenses required by the design.

1.3.9 GOVERNMENT APPROVAL

The approval of submittals by the Contracting Officer's Representative shall not be construed as a complete check, but will indicate only that the design appears to be in conformance with the contract requirements. Approval will not relieve the Contractor of the responsibility for any errors which may exist, as the Contractor is responsible for the design and construction of all work.

1.3.10 INCOMPLETE SUBMITTALS

Provide complete submittals in accordance with “STAGES AND CONTENTS OF DESIGN SUBMITTALS” below for each design submittal. Incomplete submittals will be rejected and will not be reviewed by the Government. Government review period shall be provided in accordance with “DESIGN SCHEDULE” below and will begin only upon the receipt of a complete design submittal package.

1.3.11 DESIGN ANALYSIS

1.3.11.1 MEDIA AND FORMAT

The design analysis shall be presented on 8-1/2" x 11" paper except that larger sheets may be used when required for graphs or other special calculation forms. All sheets shall be reproducible form. The material may be typewritten, hand lettered, handwritten, or a combination thereof, provided it is legible. Side margins shall be 1-inch minimum to permit side binding and head to head printing. Bottom margins shall be 1 1/4 inches, with page numbers centered 1-inch from the bottom.

1.3.11.2 ORGANIZATION

The several parts and sheets of the design analysis shall be given a sequential binding number and bound under a cover indicating the name of the facility and project number, if applicable. The title page shall carry the designation of the submittal being made. The complete design analysis presented for final review with the final drawings and specifications shall carry the designation "FINAL DESIGN ANALYSIS" on the title page.

1.3.11.3 DESIGN CALCULATIONS

Design calculations are a part of the design analysis. When they are voluminous, they shall be bound separately from the narrative part of the design analysis. The design calculations shall be presented in a clean and legible form incorporating a title page and index for each volume. A table of contents, which shall be an index of the indices, shall be furnished when there is more than one volume. The source of loading conditions, supplementary sketches, graphs, formulae, and references shall be identified.

Assumptions and conclusions shall be explained. Calculation sheets shall carry the names or initials of the computer and the checker and the dates of calculations and checking. No portion of the calculations shall be computed and checked by the same person. Design calculations shall be sealed and signed.

1.3.11.4 AUTOMATIC DATA PROCESSING SYSTEMS (ADPS)

When ADPS are used to perform design calculations, the design analysis shall include descriptions of the computer programs used and copies of the ADPS input data and output summaries. When the computer output is large, It may be divided into volumes at logical division points. Each set of computer printouts shall be preceded by an index and by a description of the computation performed. If several sets of computations are submitted, they shall be accompanied by a general table of contents in addition to the individual indices. Preparation of the descriptions which must accompany each set of ADPS printouts shall include the following:

a. Explain the design method, including assumptions, theories, and formulae.

b. Include applicable diagrams, adequately identified.

c. State exactly the computation performed by the computer.

d. Provide all necessary explanations of the computer printout format, symbols, and abbreviations.

e. Use adequate and consistent notation.

f. Provide sufficient information to permit manual checks of the results.

1.3.12 DRAWINGS

All drawings shall be Computer-Aided Design and Drafting (CADD). Drawings shall be provided in Autdesk ACAD (.dwg) format and Adobe Acrobat (.pdf) format. Drawings shall be provided in release year, as directed, to be compatible with the Government’s current version. The Contractor shall prepare the drawings in such a manner that the Government could construct the facility without any additional assistance from the Contractor. Drawings shall be complete. Unnecessary work such as duplicate views, notes and lettering, and repetition of details shall not be permitted. Standard details not applicable to the project shall not be shown. Details of standard products or items which are adequately covered by specifications shall not be included on the drawings. Drawings shall be detailed such that conformance with the RFP can be checked and to the extent that shop drawings can be checked. Shop drawings shall not be used as design drawings. The Contractor shall use standard Joint Base Charleston title blocks and borders on all drawings at all submittal stages. Standard drawing sheet formats and title blocks, and file and drawing CADD file names will be furnished to the Contractor by the Government. The Contractor shall incorporate the drawing, file, and contract numbers on individual drawing sheets at the earliest submittal.

All half size drawings shall be 11" x 17" blue/black lines or plots.

Building drawings shall consist of 1/8" scale minimum floor plans. Elevations shall be drawn to a 1/8" scale minimum. The scale of other visual information shall be as required. Building wall sections shall be drawn at a minimum of 1/4" scale. The site and exterior utility drawings shall use a minimum scale of 1" = 30' unless otherwise indicated. Minimum text size on half size drawings is 1/8".

1.3.13 SPECIFICATIONS

The Contractor shall submit marked-up specifications at the 65% submittal, and final specifications at the 95% and 100% submittals. All marked-out or redlined text shall be deleted and all inserted text shall be typed at the 95% and 100% submittals. The specifications shall be detailed enough such that another product meeting the specification could be substituted and it would not adversely impact the project.

1.3.13.1 TECHNICAL SPECIFICATIONS

Utilize Unified Facilities Guide Specifications (UFGS) in the SpecsIntact format. Utilize complete project specifications to cover the full scope of work. Delete references to materials that are not allowed or that are not intended to be provided. Government standards will not be referenced in the specifications; instead, provide any specific requirement of the standard in the specification as applicable.

These UFGS Specifications are available on the Internet at:

http://www.wbdg.org/ccb/

Operations and maintenance (O&M) portions of UFGS shall be edited by the respective Designers of Record in the design phase. O&M requirements in the UFGS shall not be edited out. Submittals, operating procedures, schematics, as-built drawings, manuals, software, and computer hardware required in the UFGS for system operation incorporated in the design phase are critical to the operation of the new facility on completion.

1.3.14 SUBMITTAL REGISTER

The Contractor shall develop submittal requirements required during construction as part of the design phase of the contract. This shall be done by the Contractor's Designer of Record by producing a Contractor Submittal Register at each submittal during design. A submittal register shall be prepared for each section of the specifications for the submittal requirements of that section. The Contractor's Designer of Record shall be responsible for listing all required submittals necessary to insure the project requirements are complied with. The Register shall identify submittal items such as shop drawings, manufacturer's literature, certificates of compliance, material samples, guarantees, test results, etc. that the Contractor shall submit for review and/or approval action during the life of the construction contract.

See specifications Section 013300 SUBMITTAL PROCEDURES for submittal and submittal register definitions and procedures.

1.3.15 DATING MATERIALS

All design materials submitted shall be dated in an appropriate location.

Whenever items are corrected or later resubmitted, they will show a revised date in order to differentiate later material from the original submittal.

1.3.16 QUANTITY OF SUBMITTAL ITEMS

The documents which the Contractor shall submit to the Government for each submittal are listed and generally described in the “SUBMITTAL DISTRIBUTION” chart below.

1.3.16.1 SUBMITTAL DISTRIBUTION

The following table lists the number of copies of design submittals for this project:

S U B M I T T A L

C O N T E N T

D e s i g n

A a l y s i s r a w i n g s

F u l l s i z r a w i n g s

H a l f s i z

S p e c i f i c a t i o s

A n o t a t d

C o m m e n t s

P e r m i t o c u m e n t s

S I

I o r

D V D c o n t a i n i g a l l s u b m i t t d

SUBMITTAL

STAGE

QTY

JOINT BASE

CHARLESTON -

ENGINEERING

35% 6 1 6 6 3 2

65% 6 1 6 6 6 3 2 2 2

95% 6 1 6 6 6 3 2 2 2

100% 6 1 6 6 6 3 2 2 2

JOINT BASE

CHARLESTON –

CONTRACTING

35% 1 1 1 1 1

65% 1 1 1 1 1 1 1 1

95% 1 1 1 1 1 1 1 1

100% 1 1 1 1 1 1 1 1

1.4 DESIGN SCHEDULE

Within 3 calendar days after Notice to Proceed, the Contractor shall submit, for approval, a complete design schedule with all submittals and review times indicated by specific calendar dates. The schedule shall be updated monthly with copies furnished to the Contracting Officer. No progress payments will be made without an approved schedule. Any additional changes which the Contractor may wish to make to number or composition of design submittals shall be made 21 calendar days prior to the expected submittal date. The Contractor shall allow twenty-one (21) calendar days for the Government review period if submittal dates are met. If a scheduled design submittal date is not met without notifying the Contracting officer in writing one (1) week in advance of the scheduled submittal date, 21 calendar days shall be allowed for the Government review period. See Paragraph: "SUBMITTAL REVIEWS".

1.5. MAILING OF SUBMITTALS

All submittals to the Government during design shall be mailed using overnight mailing service. The addresses to where each copy shall be mailed are listed below. Each submittal shall have a transmittal letter accompanying it which indicates the date, design percentage, type of submittal, list of items submitted, transmittal number and point of contact with telephone number.

1.5.1 ADDRESSES FOR SUBMITTAL DISTRIBUTION

Joint Base Charleston - Engineering:

a. For Projects at Joint Base Charleston (Air Base)

Wayne Cotton (628 CES/CENMP) 210 West Stewart Avenue, Bldg 721

Joint Base Charleston, SC 29404

b. For Projects at Joint Base Charleston (Weapons Station)

Jackie Shokes (628 CES/CENMP) 2482 Red Bank Road, Building 5, Goose Creek, SC 29445

Joint Base Charleston - Contracting:

Useba Ford (628 CONS/LGCB) 101 E. Hill Boulevard Charleston AFB SC 29404

1.6 SUBMITTAL REVIEWS

For each design review submittal, the Contractor will be furnished comments from Government personnel involved in the review process. The review will be for conformance with the technical requirements of the solicitation. The Government will take twenty-one (21) days to review and comment on each design submittal. The last two weeks of the calendar year shall not be considered when scheduling review times or meeting times. If the Contractor disagrees technically with any comment or comments and does not intend to comply with the comment, he shall clearly outline, with ample justification, the reasons for noncompliance within five (5) days after receipt of these comments in order that the comment can be resolved. The disposition of all comments shall be furnished in writing within 5 working days after the review meeting. The Contractor is cautioned in that if he believes the action required by any comment exceeds the requirements of this contract that he should take no action and notify the Contracting Officer’s Representative (COR) in writing immediately.

Review conferences will be held for each design submittal on Joint base Charleston. The Contractor shall bring the personnel that developed the design submittal to the review conference. These conferences will take place the week after the twenty-one (21) day review period. The Contractor shall be responsible for writing and distributing Minutes on each submittal review meeting within seven (7) calendar days of the meeting. Time for design submittal reviews and conferences will be included in the Contractor’s schedule. Distribution shall be to each office listed under paragraph 1.5.1, ADDRESSES FOR SUBMITTAL DISTRIBUTION

During the design review process, comments will be made on the design submittals that will change the drawings and specifications. The Government will make no additional payments to the Contractor for the incorporation of comments. Review comments are considered part of the design/build process.

If the Government requests a design change after the approved Final Design Submittal drawings and specifications have been submitted, then this shall be considered a change and proper payment will be made by the Government.

If a design submittal is not of the quality level required for the stage of design submitted, the Government has the right to return the submittal to the Contractor so the design quality can be increased, and request a resubmittal.

The review time will begin when the submittal received is of the quality level required by the Government for the stage of design submitted. Returned incomplete submittals will not be the basis of a claim by the Contractor for additional time or money.

1.7 PAYMENT DURING DESIGN

Payments, as authorized by the Authorized Contrcting Officer, will be made monthly for the amount and value of the work and services performed by the Contractor. This estimate will be verified by the Contracting Officer utilizing progress charts or a CONTRACTOR-PREPARED NETWORK ANALYSIS SYSTEM submitted by the Contractor as well as independent analyses of progress. See Contract Clause entitled PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS for additional information.

1.8 DESIGNER OF RECORD

The Contractor shall identify and have on his staff a Designer of Record to develop submittal requirements during design and be responsible for each submittal identified in the Contractor Submittal Register. A Designer of Record may be responsible for more than one submittal. All areas of work shall be accounted for by a listed Designer of Record. Designer of Record shall approve all submittals they are responsible for prior to submittal to the Government.

--END OF SECTION --