FA4418-15-R-0017-0001.pdf
PDF 23 KB Posted
- Attached to
- Repair/Replace Various Roofs Federal contract opportunity
- Solicitation number
- FA4418-15-R-0017
About this file
FA4418-15-R-0017-0001 (Amendment 0001)
View the file
Other files for this federal contract opportunity
Show all 50
Repair/Replace Various Roofs has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise CLIN 0002, Section B, to include space for pricing of each building.
2. ncorporate Addendum 1 to Joint Base Charleston Division 1 Guide Specifications dated 21 Aug 2015.
4. Incorporate roof and floor plan draw ings (33 sheets).
5. Extend the proposal due date from 2 Sep 2015 to 9 Sep 2015.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-15-R-0017
X 9B. DATED (SEE ITEM 11)
03-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Sep-2015
CODE
628 CONTRACTING SQUADRON
101 E HILL BLVD, B503
JOINT BASE CHARLESTON SC 29404 5021
FA4418 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4418-15-R-0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from Non-Personal Services: Contractor will furnish qualified personnel to perform the services listed below in strict accordance with the Statement of Work dated 8 June 2015.The project consists of providing all plant, labor, material parts, and equipment necessary to repair/replace roofs at buildings 31, 209, 419, 3305, & 3371 on Joint Base Charleston (Weapons Station).Project No.# DKGV 14-2062The Government reserves the right to award some, none, or all options (CLIN 0002) at initial award. The Government reserves the right to award any/all unawarded options through 31 Dec 2015. to Non- Personal Services: Contractor will furnish qualified personnel to perform the services listed below in strict accordance with the Statement of Work dated 8 June 2015.The project consists of providing all plant, labor, material parts, and equipment necessary to repair/replace roofs at buildings 31, 209, 419, 3305, & 3371 on Joint Base Charleston (Weapons Station).Bldg 31: ________________________Bldg 209: ________________________Bldg 419: ________________________Bldg 3305: ________________________Bldg 3371:
________________________Project No.# DKGV 14-2062The Government reserves the right to award some, none, or all options (CLIN 0002) at initial award. The Government reserves the right to award any/all unawarded options through 31 Dec 2015..
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
ADDENDUM TO DIV 01 GEN SPECS
ADDENDUM 1
to
JOINT BASE CHARLESTON DIVISION 1 GUIDE SPECIFICATIONS
(21 August 2015)
1. Amend Specification Section 01 45 00 (Quality Control for Minor Construction), Paragraph 1.5.1.1 to require the QC Manager be a separate, independent individual from the Project Superintendent by removing the sentence reading:
“In addition to implementing and managing the QC program, the QC Manager may perform the duties of project superintendent.”
and replacing it with:
“The QC Manager may not perform the duties of the project superintendent.”
2. Amend Specification Section 01 11 00 (Summary of Work), Paragraph 1.2 to incorporate Order of Precedence verbiage to deconflict potential inconsistencies between sections of the contract by adding the following language:
“In the event of conflict or inconsistency between any of the below described portions of the contract, precedence shall be given in the following order:
FA4418-15-R-0017
a. Any portions of the proposal or final design (for design/build contracts) which exceed the requirements of the solicitation.
b. Any portion of the proposal which exceeds the final design.
c. Any portion of the final design which exceeds the proposal.Where portions within either the proposal or the final design conflict, the portion that most exceeds the requirements of the solicitation has precedence.
d. The requirements of the solicitation, in the following descending order of precedence:
(i) Standard Form 1442, Price Schedule, and Davis Bacon wage rates.
(ii) Part 1 – Contract Clauses.
(iii) Part 2 – General Requirements.
(iv) Part 3 – Statement of Work/Project Program Requirements.
(v) Part 6 – Attachments (excluding Concept Drawings).
(vi) Part 5 – Prescriptive Specifications, exclusive of performance specifications.
(vii) Part 4 – Minimum Materials, Engineering and Construction Requirements, exclusive of prescriptive specifications.
(viii) Part 6 – Attachments (including Concept Drawings).”
(End of Summary of Changes)