This is a Clarification Questions and Responses document for federal contract solicitation FA440726Q0008 concerning electrical work at USTRANSCOM Building 1900.
The contractor shall furnish all labor, materials, equipment, and tools necessary to complete the project, with pricing provided on an overall basis for materials and installation combined. No base bid, alternates, allowances, or unit prices apply, and no addenda or RFI responses modify the scope. The project involves coordination with a previously awarded furniture company contractor to avoid double-counting of telecom work. Completion is governed by an estimated completion date rather than liquidated damages or interim milestones. Drawings will be provided with all cable test results and are to scale for pathway takeoff purposes. The scope includes 52 CAT6A cabling drops in blue, plenum-rated configuration, along with unshielded OM4 fiber with LC connectors at desk locations. Fiber enclosures must house Duplex LC connections and be installed in Communications Room 267. Conduit installation shall comply with TIA 569E standards. All cabling is located beneath the raised access floor in Room 268, with J-hooks serving as the pathway solution if existing tray is unavailable. Wireless Access Points are not included in this solicitation. Wall penetrations are permitted as needed to complete wall drops and work under the raised access floor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical CLARIFICATION FINAL QUESTIONS & RESPONES #2 FA440726Q0008 - USTRANSCOM Building 1900
1. Scope: Furnish & install, labor-only, or both?
Response: The contractor shall furnish all labor, materials, equipment, and tools necessary to complete all project requirements.
2. Scope: Base bid, alternates, allowances, or unit prices?
Response: Overall prices for materials and install.
3. Scope: Any addenda / Request for Information (RFI) responses that modify scope?
Response: No.
4. Scope: Any telecom by electrical/General Contractor (GC)/others (avoid double-count)?
Response: The furniture company that has already been awarded the furniture portion of this project and the contractor who is selected as the awardee for this current solicitation.
5. Scope: Liquidated damages / completion milestones?
Response: Estimated completion Date.
6. Clarification: Are drawings to scale (needed for pathway takeoff)? Drawings to be provided with all cable test results. Response: Power and Comm.
7. Clarification: Do WAPs require 1 or 2 cables? If this is Wireless Access Point.
Response: N/A – No.
8. Clarification: Required pathway type (J-hooks / tray / Electrical Metallic Tubing (EMT) / existing)?
Response: If tray is existing, it will be used. If not, contractor will install and use J-hooks.
9. Please confirm the required color for all CAT6A cabling to be installed under this solicitation.
Response: Blue.
10. Please specify whether CAT6A cabling must be plenum-rated or riser-rated for all 52 drops.
Response: Plenum.
11. The SOW references shielded fiber; however, we need additional details regarding the exact
OM4 fiber type required, including connector type and shielding specifications.
Response: Unshielded OM4 LC is required at the desk.
12. Will specialized fiber conduits be required for any portion of the installation? If so, please identify the conduit type(s) and the quantity needed.
Response: Conduit shall be installed per TIA 569E.
13. Please specify the exact fiber enclosure model or type required for installation in Communications Room 267.
Response: Fiber enclosure shall house all Duplex LC connections.
14. Please confirm whether all existing and new cabling to be accessed or installed is located beneath the raised access floor in Room 268.
Response: Yes, all cables are under the RAF.
15. Please advise whether any wall penetrations will be required to complete the installation as specified.
Response: As needed to install wall drops and under RAF.