Room 268 CLARIFICATION QUESTIONS and ANSWERS-Doc-2.pdf
PDF 82 KB Posted
- Attached to
- Electrical and Comm/Lan
- Solicitation number
- FA440726Q0008
About this file
This is a Clarification Questions & Answers document for federal contract solicitation FA440726Q0008 for electrical work at USTRANSCOM Building 1900.
The contractor shall furnish all labor, materials, equipment, and tools necessary to complete the electrical project, with pricing provided on an overall basis for materials and installation combined. No addenda or Request for Information responses modify the scope, and no liquidated damages or completion milestones apply beyond an estimated completion date. Coordination is required between the selected electrical contractor and the furniture company previously awarded the furniture portion of the project to avoid double-counting of telecom work. Drawings will be provided to scale and include all cable test results for power and communications systems. Pathway installation shall utilize existing cable tray where available; if tray does not exist, the contractor will install and use J-hooks. Wireless Access Points are not included in this scope (no WAP cables required).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical CLARIFICATION QUESTIONS & ANSWERS #2 - FA440726Q0008 - USTRANSCOM Building 1900
1. Scope: Furnish & install, labor-only, or both?
Response: The contractor shall furnish all labor, materials, equipment, and tools necessary to complete all project requirements.
2. Scope: Base bid, alternates, allowances, or unit prices?
Response: Overall prices for materials and install.
3. Scope: Any addenda / Request for Information (RFI) responses that modify scope?
Response: No.
4. Scope: Any telecom by electrical/General Contractor (GC)/others (avoid double-count)?
Response: The furniture company that has already been awarded the furniture portion of this project and the contractor who is selected as the awardee for this current solicitation.
5. Scope: Liquidated damages / completion milestones?
Response: Estimated completion Date.
6. Clarification: Are drawings to scale (needed for pathway takeoff)? Drawings to be provided with all cable test results.
Response: Power and Comm.
7. Clarification: Do WAPs require 1 or 2 cables? If this is Wireless Access Point.
Response: N/A – No.
8. Clarification: Required pathway type (J-hooks / tray / Electrical Metallic Tubing (EMT) / existing)?
Response: If tray is existing, it will be used. If not, contractor will install and use J-hooks.