This document is a Clarification Questions and Answers file for federal contract FA440726Q0008 issued by USTRANSCOM for Building 1900 at Scott Air Force Base.

The solicitation requires installation of communications and fiber infrastructure at 32 locations within Building 1900. Specific requirements include: two shielded CAT6A cables per location terminating in RJ45 jacks at patch panels; two OM4 duplex fiber cables per location with LC/UPC connectors; fiber testing in compliance with TIA 568.3-D/E for multimode fiber; and all workstation and wall fiber cables terminating in an under-raised-floor zone box, with only two OM4 trunk cables (LC cassettes) extending to Communications Room 268. The fiber patch panel will be landed into an existing rack in Communications Room 267. Additional electrical scope work includes seven systems-furniture power whips, installation or rewiring of power lines to the facility UPS as requested by the customer, and permitting requirements to be determined by the 375th Civil Engineering Squadron, which will assess whether state-level IEPA storm/water/air permitting or federal wetland/NEPA reviews apply to the work performed on Scott Air Force Base.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical CLARIFICATION QUESTIONS - FA440726Q0008 - USTRANSCOM Building 1900

Communications and Fiber Scope 1.

Shielded CAT6A quantity: Please confirm whether the requirement is for 52 total shielded CAT6A cable drops, or 52 workstation drops plus 12 additional cables serving the six dual-RJ45 wall locations, for 64 total shielded CAT6A cables?

The requirement is to install two CAT6A cables to 32 locations.

2.

OM4 fiber quantity: Please confirm whether the 52 OM4 workstation cables are in addition to 12 fiber connections serving the six dual-OM4 wall locations and the two OM4 trunk cables from the under-floor zone box to Communications Room 267?

The requirement is to install two OM4 Duplex cables to 32 locations.

3.

Workstation and wall fiber configuration: For each workstation and wall connection, please identify the required fiber strand count, simplex or duplex configuration, connector type, and connector polish?

2 CAT6A, 2 OM4 Duplex LC/UPC.

4.

Fiber trunk configuration: Please identify the required strand count and connector configuration for each of the two OM4 trunk cables. Please also confirm whether the trunks serve separate networks, provide redundancy, or perform another designated function?

The fiber trunk will be LC cassettes/OM4.

5.

Fiber distribution architecture: Please confirm that all workstation and wall fiber cables terminate in the under-raised-floor zone box and that only the two trunk cables extend from the zone box to the fiber patch panel in Communications Room 267. Please also confirm whether preterminated fiber assemblies are acceptable?

The fiber trunk will service Rm 268 & the 32 locations will connect to under RAF ZB.

6.

Fiber testing: Please confirm the required test wavelengths and whether Tier 1 optical-loss testing is sufficient. If OTDR and/or bidirectional testing is required, please identify the applicable testing standard and reporting requirements?

Testing will be in compliance with TIA 568.3-D/E f/MM FOCA.

7. Patch-panel capacity and configuration: Please identify the required port capacity for each of the two shielded CAT6A patch panels and the required capacity, adapter type, and cassette or enclosure configuration for the fiber patch panel and under-floor zone box?

The requirement is for 2 CAT6A lines per each 32 locations, RJ45 Jacks.

The requirement is for 2 OM4 lines per each 32 locations, LC connectors across all.

Electrical Scope

8. Systems-furniture power whips: Please confirm whether the seven systems-furniture power whips are to be furnished new, or whether some or all of the existing whips disconnected and stored below the raised access floor are intended to be reused. Please identify the required whip connector type and approximate lengths, if known?

Recommend sending the attached to answer.

9. UPS-fed electrical work: Section 4.1.5 requires installation or rewiring of existing power lines to the facility UPS as requested by the customer. Please clarify the anticipated quantity and extent of this work, including circuit count, panel location, approximate routing distances, spare breaker capacity, and whether outages or after-hours work are anticipated?

Recommend sending the attached to answer.

10. Drop count discrepancy: Section 4.2 references "approximately 28 communication locations," while the workstation-level detail (26 workstations × 2 CAT6A + 2 OM4 fiber drops each) totals 52 of each. Can you confirm the correct total quantity of CAT6A and fiber drops required?

32 locations with 2 CAT6A and OM4 lines each.

11. Fiber configuration: Section 4.2.3.3 specifies "2 OM4 fiber optic cables" per workstation.

Please confirm whether this means two single-strand fiber cables per workstation, or two duplex fiber pairs per workstation.

The requirement is for 2 OM4 duplex lines at each location.

12. Patch panel rack: The RFQ lists no Government Furnished Equipment. Is an existing rack already in place in Comm Room 267 to house the new patch panels, or will the contractor need to supply one? If supplied, what size/style is required?

Fiber will be landed into an existing rack.

13. Permitting: Given the work is performed entirely on Scott AFB, can you confirm whether any Illinois state or local permitting applies, or whether this falls solely under base civil engineering requirements?

The 375CES will determine if the work requires state-level IEPA storm/waterair permitting or federal wetland/NEPA reviews.