Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- RPR Porte Cochere, JBSA Fort Sam-Houston, TX Federal contract opportunity
- Solicitation number
- FA3047-15-T-0031
About this file
Attachment 2 Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66
| PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NUMBER: | |
| SCHEDULE OF MATERIAL SUBMITTALS | JBSF150112-65392 | Building 3820, Porte Cochere Repairs |
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||
| NUMBER OF COPIES REQUIRED | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, |
CONTRACT REFERENCE, TYPE OF
| SUBMITTAL | CERTIFICATION OF | |||
| COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S |
| RECOMMENDATIONS | MANUFACTURER'S | |||
| WARRANTY | CATALOG DATA | OPERATING | ||
| INSTRUCTIONS | DOCUMENT | REQUIRED SUBMISSION | ||
| DATE | DATE RECEIVED IN | |||
| CONTRACTING | DATE TO CIVIL | |||
| ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE |
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DIS- |
APPROVED
| 1 | Hazardous Material Inventory & Monthly Usage Report | 3 | |||||
| 2 | Inventory of the chemicals that will be used and corresponding Safety Data Sheets | 3 | |||||
| 3 | Permits | 3 | |||||
| 4 | Activity Hazard Analysis (AHA) | 3 | |||||
| 5 | Safety Plan (SOW Ref) | 3 | |||||
| 6 | Quality Control Plan | 3 | |||||
| 7 | Material Listing | 3 | |||||
| 8 | Construction Site Maintenance | 3 | |||||
| 9 | Noise Control | 3 | |||||
| 10 | Accident Prevention Plan (APP) | 3 | |||||
| 11 | Hot Work Permit | 3 | |||||
| 12 | Product Data | 3 | |||||
| 13 | Test Reports | 3 | |||||
| 14 | SWPPP (SOW Ref) | 3 | |||||
| 15 | DD 1354 (SOW Ref) | 3 | |||||
| 16 | Warranty Letters (SOW Ref) | 3 | |||||
| 17 | As-Built Drawings (SOW Ref) | 3 | |||||
| 18 | Demolition Plan (SOW Ref) | 3 | |||||
| 19 | Waste Manifests (SOW Ref) | 3 | |||||
| 20 | Division 1 (SOW Ref) | 3 | |||||
| 21 | Division 2 Demolition and Deconstruction (SOW Ref) | 3 | |||||
| 22 | Division 3 Concrete (SOW Ref) | 3 | |||||
| 23 | Division 5 Metals (SOW Ref) | 3 | |||||
| 24 | Division 7 Metal Roof (SOW Ref) | 3 | |||||
| 25 | Division 9 Paints and Coating (SOW Ref) | 3 | |||||
| 26 | Division 10 Traffic Signage (SOW Ref) | 3 | |||||
| 27 | Division 31 Earthwork (SOW Ref) | 3 |
FA3047-15-T-0031
RPR PORTE COCHER, JBSA FORT SAM-HOUSTON, TX
Attachment 2: Schedule of Material Submittals
NOT ALL INCLUSIVE