FA304715T0031.pdf

PDF 196 KB Posted

Attached to
RPR Porte Cochere, JBSA Fort Sam-Houston, TX Federal contract opportunity
Solicitation number
FA3047-15-T-0031
Issued by
Department of the Air Force Air Education and Training Command

About this file

FA3047-15-T-0031

View the file

Other files for this federal contract opportunity

Other files attached to RPR Porte Cochere, JBSA Fort Sam-Houston, TX, newest first.
File Type Posted
FA304715T00310001-150914.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
JBSF150112-RPR_Porte_Cochere.dwg DWG drawing
Installation Access Credential —
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
01 33 00 Submittal Procedures.doc DOC document
CEPT Work Request Form Editable.pdf PDF
JBSF150112_SOW-Final_150902.pdf PDF
Binder1.pdf PDF
01 35 30 Safety Health and Emergency Response.doc DOC document
5_-_AETC_Form_47.pdf PDF
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
Attach 1 - 502 CES_CEIE Contractor HAZMAT Req'ts_2Apr15_mdb.pdf PDF
request to use radioactive material.pdf PDF
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
DBA_WD_150280.docx DOCX document
01 74 19.00 Construction Waste Management.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
Required Specification List.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 52 13.00 Temporary Facilities and Controls.doc DOC document
01 71 23.16 Cutting and Patching.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
01 78 36.00 Warranty of Construction.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 31 00 44 Project Meetings.doc DOC document
Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
Rad permit company request letter template.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

502 CES/CE F2MRAA

2250 ENGINEER ST

JBSA FORT SAM HOUSTON TX 78234-7584

TEL: 210-221-3956 FAX:

F2MRAA5196AW01

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

FA3047-15-T-0031 02-Sep-2015 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. % NO TE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and

ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

502D CONTRACTING SQUADRON

2250 ENGINEER ST STE 101

JBSA FT SAM HOUSTON TX 78234-7740

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

14-Sep-2015(Date) PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

210-671-9395MICHAEL J. BURKETT

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

FA3047-15-T-0031

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot JBSF150112-65392 B3820 RPR Porte Cochere

FFP

Contractor is to provide all labor, supervision and transpotation necessary to complete the construction efforts IAW the SOW dated 01 Sep 15.

Period of performance is 70 Calendar Days after NTP for construction.

FOB: Destination

PURCHASE REQUEST NUMBER: F2MRAA5196AW01

SIGNAL CODE: A

NET AMT

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 70 Calendar Days

After NTP

1 502 CES/CE F2MRAA

2250 ENGINEER ST

JBSA FORT SAM HOUSTON TX 78234-

210-221-3956 FOB: Destination

F2MRAA

52.211-13 Time Extensions SEP 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 70 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 70 Calendar Days after NTP:

CLIN 0001 CONSTRUCTION EFFORTS 70 CALENDAR DAYS AFTER NTP

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $563.92 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

Section G - Contract Administration Data

ADMINISTRATIVE AUTHORITY

The resultant contract will be administered by the 502D Contracting Squadron. The address, telephone number and fax number of the Contracting Officer are as follows:

ANN COLEMAN

Contracting Officer

502 CONS/JBKADC

1655 Selfridge Ave Joint Base San Antonio - Lackland, TX 78236-5253 Phone: 210-671-6083 Fax: 210-671-3360 dorothy.coleman@us.af.mil

The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such changes at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (i.e., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems.

Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO. Any request for contract changes/modification shall be submitted to the CO.

The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. An example of a field change is: rerouting planned location of a sidewalk to avoid a tree (when quantities are not changed). All field changes must be approved by the CO prior to execution. All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.

252.204-7006 Billing Instructions OCT 2005

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause-- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

mailto:dorothy.coleman@us.af.mil

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Invoice and Receiving Report - Combo

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Inspection: Destination Acceptance: Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA3047 Admin DoDAAC FA3047 Inspect By DoDAAC F2MRAA Ship To Code F2MRAA Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) F2MRAA Service Acceptor (DoDAAC) F2MRAA Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Contract Administrator – Michael J. Burkett (210-) 671-1712 michael.burkett.3@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Contracting Officer: Dorothy A. Coleman

(210) 671-6083 Dorothy.coleman@us.af.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

Section H - Special Contract Requirements

JBSA REQUIREMENTS

JOINT BASE SAN ANTONIO (JBSA) REQUIREMENTS

Smoking in AETC Facilities. Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC Supplement I, outline the procedures used by the Commander to control smoking in facilities.

Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.

Utilities Conservation. The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.

Availability of Utilities Services. Notwithstanding the provisions of the contract clause FAR 52.236-14, Availability and Use of Utilitiy Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing outlets and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor’s own expense.

Inspection and Acceptance. 502D Civil Engineer Squadron (CES) is designated as the office responsible for inspecting the work while the Contracting Officer (CO) is responsible for final acceptance of the work.

Cell Phone Usage. Contractors are advised that cellular telephone usage when approaching and entering any installation entry gate, driving on the installation or exiting JBSA is prohibited. The 502D Security Forces Squadron (SFS) is strictly enforcing those found in violation and are subject to be ticketed.

JBSA Traffic Code. The following Traffic Codes will be enforced and apply to all personnel operating vehicles Joint Base San Antonio (JBSA). They are extracted from Air Force Manual 31-116, Joint Base San Antonio Supplement; 27 August 2015. For a complete listing of all JBSA Traffic Codes and all other aaplicable traffic policies and procedures, please contact the Contracting Office for a copy of Air Force Manual 31-116 entitled Air Force Motor Vehicle Traffic Suppervision.

Quiet Hours. The quiet hours on JBSA housing and dormitory areas are between 2200-0600 daily.

Quiet Zones. All motor vehicles, including automobiles, trucks, motorcycles, and off-road vehicles (ORV) are prohibited from being operated in the on base residential areas, in sch a manner as to create a disturbance of the peace. Accelerating a vehicle in such a manner as to cause a loud or unusual noise, or exhibtion of speed, is prohibited. Offensive music or similar offensive audio (cursing, racial, or sexual slurs) noise emmanting from a vehicle at any distance is prohibited. The vehicle operator will be identified and AF Form 3545 will be accomplished and, if necessary, the vehicle operator will be apprehended.

Civilian traffic offenders will be issued the DD Form 1805*, except when the offender is operating a

GOV.

Issuance of DD 1805, United Sated District Court Violation Notice.

Hours of Work. The normal duty hours of work on JBSA are from 07:30 a.m. to 4:30 p.m., Monday thru Friday excluding holidays. The lunch period for the contractor requiring escorts is from 11:30a.m. to 12:30p.m. Access to work sites may be restricted to these hours and days. For work during other than normal duty hours, the contractor shall submit in writing for the Contracting Officer’s approval , a notice of any period of scheduled work at times other than normal duty hours for work specified above. This notice shall be submitted no less than three (3) workdays prior to each period of work scheduled at times other than normal duty hours of work including Federal Holidays.

Fire Safety Guidance. The contractor will be required to comply with the Fire Prevention Program regulations/guidance of the military installation to be serviced under this contract. The name(s) of the installation(s), the applicable regulation/title, and the point(s) of contact where the regulations/guidance may be reviewed are listed below:

Name of Installation: Joint Base San Antonio, Texas Title: Fire Safety Guidance, 502 CES/CEF Date: 08 Aug 2014 POC: Michael A. Guzman, Assistance Fire Chief of Fire Prevention Division; (210) 671-2921; OR JBSA – Ft Sam Houston Fire Prevention; (210) 221-2727 JBSA – Lackland Fire Prevention; (210) 671-2921 JBSA – Randolph Fire Prevention; (210) 652-6915 Technical Representatives. 502D CES/CEPMD is designated as the technical representative to ensure project progression, workmanship, and inspection of materials for work being performed under this contract. This clause in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms and conditions of the contract.

Recording and Preserving Historical and Archeological Finds. All items having any apparent historical and archeological interest which are discovered in the course of any construction activities shall be carefully preserved. The contractor shall leave the archeological find undisturbed and shall immediately report the find to the Contracting Officer.

Field Changes. The contractor and the government may agree to perform a no cost field change. Field changes are made when the change appears to be mutally beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the Contracting Officer prior to execution.

502D CES/CEV HAZMART. The awardee will be required to register prior to performance with the 502 CES/CEA HAZMART. The contractor shall obtain the contractor authorization worksheet from 502 CES HAZMART. (210-671-0333 Bldg 5595) This is to be accomplished immediately after receipt of award or Notice of Award. The contractor shall provide an inventory and MSDS of all HAZMAT to be used or stored on JBSA prior to beginning performance. The contractor shall submit a monthly usage report for all HAZMAT consumed during the preceding month to 502 CES/CEA HAZMART by the fifth work day of the subsequent month.

(End)

PROJECT DESCRIPTION

Project Name: Repair Porte Cochere at B3820 Project Number: JBSF150112-65392 Solicitation Number:FA3047-15-T-0031 NAICS Code: 236220 This magnitude for this project is between $25,000 and $100,000 This project is set-aside for Service Disable Veteran Owned Small Business concerns.

Davis Bacon Act is strictly enforced, General Decision Number TX150280 Instructions:

The contractor shall complete as part of the offer and submit the following documents:

Section B: Complete unit pricing and net amount for CLIN 0001.

Section K: Complete all appropriate and applicable represenatations and certifications.

Proposal: Offeror shall submit two (2) each detailed cost quote package (hard copies) similar to RS Means (4Clicks) and all supporting documentation.

The contractor must furnish any required performance and payment bonds within 10 calendar days after award

AVAILABILITY OF FUNDS

Funds are not presently available for this effort, and no contract award will be made until funds re available. The Government reserves the right to cancel this solicitation either before or after the closing date. The Government's obligation under this contract is contingent upon the availability of funds from which payment for contract purposes can be made.

In the event the solicitation is cancelled, the Government is not liable for any proposal costs. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

Section I - Contract Clauses

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUL 2014 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans JUL 2014 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payments APR 2012 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.204-7000 Disclosure Of Information AUG 2013 252.227-7033 Rights in Shop Drawings APR 1966 252.228-7004 Bonds Or Other Security DEC 1991 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___

Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2 Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225- 9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

502 CONS/JBKADC

Dorothy A. Coleman Contracting Officer 1655 Selfridge Ave JBSA Lackland, TX 78245

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by . . . . . . . . . [insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probings, test tunnels].

(b) Weather conditions – JBSA Randolph, Texas

MONTH (1) AVE DAYS RAINFALL (2) INCHES RAINFALL

JAN 6 1.7

FEB 6 2.0

MAR 6 1.7

APR 5 2.9

MAY 6 3.7

JUN 4 3.5

JUL 6 1.9

AUG 3 2.3

SEP 7 3.3

(OCT 4 3.6

NOV 4 2.5

DEC 7 1.7

(1) AVERAGE DAYS WITH PRECIPITATION

(2) AVERAGE AMOUNT OF PRECIPITATION

(c) Transportation facilities N/A.

(d) N/A

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Michael Burkett Address: 1655 Selfridge Ave, JBSA Lackland, TX 78236 Telephone: (210) 671-1712

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil or http://www.arnet.gov

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil or http://www.arnet.gov http://farsite.hill.af.mil/ http://www.arnet.gov/ http://farsite.hill.af.mil/ http://www.arnet.gov/

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

None at this time.

52.252-4 ALTERATIONS IN CONTRACT (APR 1984)

Portions of this contract are altered as follows:

TO BE COMPLETED AT TIME OF AWARD

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

5352.201-9101 OMBUDSMAN (APR 2014)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman. The ombudsman for AETC Contracting Squadrons is Mr. David E. Jones, Deputy Director of Contracting, AFICA/KT, 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-1722; facsimile 210-652-8344. The alternate ombudsman for AETC Contracting Squadrons is Mr. Stephen G. Smith, Chief Clearance & Programs Support Division, 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-7075. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/HQ AFICA/AFISRA/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures ] to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with [insert any additional requirements to comply with AFI 31-101, Integrated Defense, and AFI 31-501, Personnel Security Program Management ] citing the appropriate paragraphs as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

Section J - List of Documents, Exhibits and Other Attachments

LIST OF ATTACHMENTS

Attachment Document Title Date Pages

1. Statement of Work 01 Sep 2015 12

2. Schedule of Material Submittals Undated 1

3. Wage Determination TX150280 21 Aug 2015 6

4. AETC Form 47 Undated 1

5. Appendices Undated 371

Section K - Representations, Certifications and Other Statements of Offerors

ADDENDUM: INSTRUCTIONS

Addendum to Solicitation: Instructions to Offerors

1.0 General Instructions. This section provides general guidance for preparing quotes, as well as specific instructions on the format and content of the RFQ. Throughout this solicitation, the term “Offeror” includes subcontractors, teammates and/or joint venture partners. The Offeror’s quote must include all data and information requested, and must be submitted in accordance with (IAW) these instructions. The Offeror shall be compliant with the requirements as stated in the solicitation. A quote that is sufficiently documented to support technical capability and price in a complete, orderly, and specific detailed manner will enable the Government to perform a thorough and fair evaluation. Compliance with the instructions and solicitation is mandatory.

Failure to comply may result in an unfavorable quote evaluation and render the qutoe ineligible for award.

2.0 Information Regarding Submission Requirements. Documents submitted in response to this solicitation must comply with requirements of the solicitation and Statement of Work

(SOW).

To be considered, the complete quote must be received not later than the date and time established in Block 10 of the SF 18 at:

502 CONS/JBKADC

Attn: Michael Burkett 1655 Selfridge Avenue, Building 5450 JBSA Lackland, TX 78236

All quotes delivered in response to this solicitation shall reflect the following information on the address label:

(1) Solicitation Number FA3047-15-T-0031

(2) The legend "To be delivered unopened to the Contracting Officer/ Specialist"

(3) The volume and copy numbers contained in each box

Offerors are cautioned that JBSA Lackland has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HAND-CARRYING QUOTES. Offerors should allow sufficient time to obtain a visitor pass and arrive at the location PRIOR to the time specified for receipt. Offerors should be aware of the potential that the Government experiences delays in the postal service to JBSA Lackland and take all necessary precautions. Late quotes will be processed in accordance with FAR 52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers.”

All quotes must be in English. Fax or email quotes will not be considered. All questions must be submitted in writing no later than Friday, 9 Sep 15, 2015 by Noon CST. Questions submitted after this date will not be considered. Any quotes, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of quotes is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late quotes would not unduly delay the acquisition; and (i) there is acceptable evidence to establish that it was received at the Government installation designated for receipt of quotes and was under the Government’s control prior to the time set for receipt of quotes; or (ii) It was the only quote received.

3.0 Quote Preparation and Format Instructions. This section provides general guidance for preparing quotes in regards to the format and content of the quote. Each volume shall be complete in itself. To assure timely and equitable evaluation of quotes, offerors must follow the instructions contained herein; all the requirements specified in this solicitation are mandatory.

Offerors are representing that your firm will perform all the requirements specified in the solicitation by submitting your quote. Offerors are required to meet all solicitation requirements, including terms and conditions, and representations and certifications, in addition to those identified as evaluation factors or sub factors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

3.1 Page Limitations. Page limitations shall be treated as maximums. Total page count will be based on the printed quote submission. If page limitations are exceeded, excess pages will not be read nor considered in the evaluation of the quote. A page is defined as each face of an 8.5 x 11-inch sheet of paper containing information. All information except for document numbers, page number, etc., shall be provided in an image area with no less than one inch in margin. Two pages may be printed back-to-back on one sheet of paper. However, this will be considered two

(2) pages for the purpose of page count. The background color of each page of the quote submission shall be white or ivory stock only. The maximum number of pages for each volume is listed below. Price information shall be limited to Volume I. Excess pages will not be evaluated, but will be retained in the file. See table below for specific number of copies required and pages for each of the Volumes.

TITLE NUMBER OF COPIES

MAXIMUM NUMBER OF

PAGES

Volume I. Contracting & Pricing

Original and 2 copies No page limitation.

Volume II. Technical Original and 2 copies Not to exceed five (5) pages total.

3.2 Pages Counted. Each page shall be counted except for the following:

(a) Cover pages

(b) Table of Contents

(c) List of Figures

(d) Glossaries

(e) Tabs

(f) Dividers

(g) Blank pages

3.3 Text. Text type should be Times New Roman or Arial, no smaller than 12-point with normal proportional spacing. Illustrations and tables shall be no smaller than Times New Romans or Arial 10 point. Text lines will be, at a minimum, single-spaced.

3.4 Tables, Charts, Graphs, and Figures. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text. For graphics, exhibits and figures, text shall be no smaller than Times New Roman or Arial 10-point font. Text within tables shall be no smaller than Times New Roman or Arial 10-point font. These limitations shall apply to both electronic and hard copy quotes.

3.5 Binding and Labeling. Each volume (Contracting & Pricing and Technical) of the quote will be bound separately, with each volume in a standard loose-leaf three-ring binder. Each volume shall be written on a stand-alone basis so that its contents may be evaluated on a stand-alone basis. Cross Referencing between volumes is not permitted. Information required for quote evaluation which is not found in its designated volume will be assumed to have been omitted from the quote. Cross-referencing within a quote volume is permitted. Elaborate format and binding are neither necessary nor desirable. The cover and spine of each binder will clearly identify the offeror's name, volume number, Request for Quote (RFQ) number "FA3047-15-T- 0031", RFQ title "RPR PORTE COCHERE, B3820 – JBSA FORT SAM-HOUSTON, TX", and copy number, e.g., copy 2 of 2. The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.

Replacement pages in response to evaluation notices (if any), shall be colored stock with lines in the margin designating the change and the change highlighted.

3.6 Quote Clarity. The quote shall be clear, concise, and shall include sufficient detail for effective evaluation of the offeror’s capabilities and for substantiating the validity of stated claims. The offeror’s quote shall not simply rephrase, reiterate, or restate the Government’s own language, but rather shall provide convincing rationale describing how it intends to fulfill the requirement. Legibility, clarity, and coherence are very important. Provide as specifically as possible the actual methodology you would use for accomplishing and satisfying the requirements. The offeror shall assume that the Government has no prior knowledge of its capabilities, facilities and experience, and will base the evaluation on the information presented in the offeror’s quote.

3.7 Specific Quote Instructions. To assure timely and equitable evaluation of the quote, the offeror must follow the instructions contained herein. The quote must be complete, stand-alone, and respond directly to the requirements of this solicitation. The response shall consist of two (2) separate parts:

Volume I – Contracting & Pricing

Volume II – Technical

3.8 Volume I – Contracting & Pricing. The offeror's quote shall include a signed copy of the solicitation, and signed copy of any issued amendments. Complete all solicitation provisions and/or contract clause fill-ins if applicable. The "original" shall be clearly marked under separate cover.

4.1.1 Instructions.