CEPT Work Request Form Editable.pdf

PDF 40 KB Posted

Attached to
RPR Porte Cochere, JBSA Fort Sam-Houston, TX Federal contract opportunity
Solicitation number
FA3047-15-T-0031
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendix File

View the file

Other files for this federal contract opportunity

Other files attached to RPR Porte Cochere, JBSA Fort Sam-Houston, TX, newest first.
File Type Posted
FA304715T00310001-150914.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
JBSF150112-RPR_Porte_Cochere.dwg DWG drawing
Installation Access Credential —
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
FA304715T0031.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
01 33 00 Submittal Procedures.doc DOC document
JBSF150112_SOW-Final_150902.pdf PDF
Binder1.pdf PDF
01 35 30 Safety Health and Emergency Response.doc DOC document
5_-_AETC_Form_47.pdf PDF
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
Attach 1 - 502 CES_CEIE Contractor HAZMAT Req'ts_2Apr15_mdb.pdf PDF
request to use radioactive material.pdf PDF
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
DBA_WD_150280.docx DOCX document
01 74 19.00 Construction Waste Management.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
Required Specification List.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 52 13.00 Temporary Facilities and Controls.doc DOC document
01 71 23.16 Cutting and Patching.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
01 78 36.00 Warranty of Construction.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 31 00 44 Project Meetings.doc DOC document
Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
Rad permit company request letter template.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - TO BE COMPLETED BY REQUESTER

1. Requester Name & Title 2. Requestor Company Name & Address 3. Date of Request (YYYYMMDD)

4. Requestor Phone Number 5. Requestor Email Address 6. Project Name & Number

9. Work requires: o Asbuilts 10. Asbuilt format required: o Hardcopy o GIS Data o Electronic PDF o Project Site Request o Electronic CAD o Survey o CADD Design Support

11. GIS Data required: o Hardcopy ( GOV Only) 12. Digital Map format required: o PDF o SVG o GIF o PNG o Digital Map o AI o BMP o JPG o TIFF o Geospatial Data o EMF o EPS

13. Geospatial Data format required: o File Geodatabase (*.gdb) 14. Estimate hours needed for CADD design support.

o Personal Geodatabase (*.mdb) o Shapefile (*.shp)

1. Government POC Name & Title 2. Organization Office Symbol, Name & Address 3. Date of Request

4. Gov. POC Phone Number 5. Gov. POC Email Address 6. Gov. POC Signature

7. NDA/Limited Authorization for Use of Electronic Data completed: o Yes (Attach copy) o No

502d CES/CEPT Attn: Michael K. Arzate or Wayne Simoneau

2250 Engineer St. Suite 7, Bldg 4196

Joint Base San Antonio

Fort Sam Houston, TX 78234

CEPT Form 001, 20121024 MASTER FILE COPY

**Digital (electronic) requests must include a SPECIFIC list of geospatial data requested. ALL electronic data, whether GIS or CAD will be provided in its native format. 502d CES WILL NOT CONVERT FILE FORMATS. CAD data may or may not exist for requested items and/or infrastructure. Digital data transfers that exceed email capabilities (5Mb) may be transferred via the "AMRDEC Safesite" file transfer protocol site or via DVD/CD media. If a DVD/CD media transfer is required requestors are required to provide hard media (DVD/CD).

Send hard media with a prepaid return mailer to:

8. Description of request to be accomplished *, ** (See notes below) - GIS data requests must be specific in nature (i.e. road center lines data, storm sewer lines data, etc.). Requests such as "all GIS data for Fort Sam Houston" will NOT be processed.

502d CE TECHNICAL SUPPORT SECTION WORK REQUEST

SECTION II - GOVERNMENT POINT OF CONTACT (Must be completed by a PERMANENT STATUS government employee if Requestor is not government.)

*All requests have a minimum 3 day processing time. Map requests that require new cartography have a minimum 10 day processing time and require a specific description of the required map features, scale, and other information needed. HARDCOPY MAPS ARE ONLY

AVAILABLE TO MILITARY AND DEPARTMENT OF DEFENSE CIVILIANS. HARDCOPY MAPS ARE NOT PRODUCED FOR

PRIVATE CONTRACTORS.

1_Requester_Name__Title:
2_Requestor_Company_Name__Address:
3_Date_of_Request_YYYYMMDD:
4_Requestor_Phone_Number:
5_Requestor_Email_Address:
6_Project_Name__Number:
Textfield0:
Asbuilts: Off
GIS_Data: Off
Project_Site_Request: Off
Survey: Off
CADD_Design_Support: Off
Hardcopy: Off
Electronic_PDF: Off
Electronic_CAD: Off
Hardcopy__GOV_Only: Off
Digital_Map: Off
Geospatial_Data: Off
PDF: Off
SVG: Off
GIF: Off
PNG: Off
AT: Off
BMP: Off
JPG: Off
TIFF: Off
EMF: Off
EPS: Off
File_Geodatabase_gdb: Off
Personal_Geodatabase_mdb: Off
Shapefile_shp: Off
14_Estimate_hours_needed_for_CADD_design_support:
1_Government_POC_Name__Title:
2_Organization_Office_Symbol_Name__Address:
3_Date_of_Request:
4_Gov_POC_Phone_Number:
5_Gov_POC_Email_Address:
6_Gov_POC_Signature:
RadioButton: Off

File details come from the government source that posted it. Updated .