Attach 1 - 502 CES_CEIE Contractor HAZMAT Req'ts_2Apr15_mdb.pdf

PDF 534 KB Posted

Attached to
RPR Porte Cochere, JBSA Fort Sam-Houston, TX Federal contract opportunity
Solicitation number
FA3047-15-T-0031
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendix File

View the file

Other files for this federal contract opportunity

Other files attached to RPR Porte Cochere, JBSA Fort Sam-Houston, TX, newest first.
File Type Posted
FA304715T00310001-150914.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
JBSF150112-RPR_Porte_Cochere.dwg DWG drawing
Installation Access Credential —
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
FA304715T0031.pdf PDF
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
request to use radioactive material.pdf PDF
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
DBA_WD_150280.docx DOCX document
01 74 19.00 Construction Waste Management.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
Required Specification List.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 77 00.00 20 Contract Closeout.doc DOC document
01 33 00 Submittal Procedures.doc DOC document
CEPT Work Request Form Editable.pdf PDF
JBSF150112_SOW-Final_150902.pdf PDF
Binder1.pdf PDF
01 35 30 Safety Health and Emergency Response.doc DOC document
5_-_AETC_Form_47.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
01 71 23.16 Cutting and Patching.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
01 78 36.00 Warranty of Construction.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 31 00 44 Project Meetings.doc DOC document
Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
Rad permit company request letter template.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

One Team, One Mission: Your Success!

The Premier Joint Base in the Department of Defense!

Joint Base San Antonio

502d Air Base Wing

Requirements for Reporting

Contractor Hazardous Material Usage

502 CES Environmental (CEIE)

Hazardous Material (HAZMAT) Management

Federal Acquisition Regulation (FAR) Clauses

52.223-3 & 52.223-5 (i.e. “HAZMAT Clause”) Clause will be included in any/all contract(s) involving the use of hazardous materials (HAZMAT)

Contractors are required to list and provide the Safety Data

Sheets (SDSs formerly MSDS) for any HAZMAT to be delivered under the contract prior to bringing HM onto the installation

AFI 32-7086 & AFI 32-7086 AETC Supplement, Hazardous Material Management Contractors are required to provide the Contracting Office with the list of proposed hazardous materials and supporting documentation necessary to obtain & record HAZMAT usage information.

Contractor HAZMAT Requirements http://www.time.com/time/cartoonsoftheweek/0,29489,1918017_1924050,00.html

Contractor HAZMAT Requirements

• The Contractor

• Will provide an initial inventory of the chemicals that will be used for the contract and corresponding Safety Data Sheets (slides

5&6) (SDS/MSDS) to the Contracting Officer (CO) at least 14 working days before the HAZMAT is brought onto the installation

• Will report monthly HAZMAT usage to the CO by the 10th working day of each month on a CD (slide 6)

• Submit an updated Usage Report (with SDSs) if there is a change or new material is added after the monthly report is submitted, no later than the same work day that the material is received onto the installation

• Must remove any unused/partially used chemical products at the end of the project.

• Is prohibited from leaving chemicals/ hazardous materials on the installation past the contract end-date.

Contractor HAZMAT Requirements

The Contracting Officer Forward the initial inventory with SDSs to the 502 CES

Environmental HM Mgt for entry into the installation HM tracking system (EESOH-MIS) at least 5 days before the material comes onto the installation

Notify the contractor when they are authorized to bring HM onto the installation

Forward monthly usage reports to 502 CES

The 502 CES/CEIE Environmental HM office Input contractor HM inventories and SDSs into EESOH-MIS

Coordinate review & approval with proper environmental, safety, and health officials

Notify the CO when materials are approved for usage

Record monthly HM usage in EESOH-MIS

Project Information

Initial Inventory &

Monthly HM Usage Reports

• The Contractor will provide the initial inventory with SDSs to the CO at least 14 days prior to bringing HM onto the installation

• The Contractor will report the monthly usage report to the CO by the 10th working day of each month.

Example:

Safety Data Sheet (formerly MSDS)

Manufacturer

Name Manufacturer

Trade Name

Note:

Please ensure all SDSs are manufacturer-specific. Generic

SDSs are not allowed in the

Air Force HAZMAT database.

Example:

Product Code and Container

Type of Container

Package part # or order # Size on Product label

Container Size on Product label

Pledge Revitalizing Oil with Natural Orange Oil, 16 fl oz spray bottle

Submit to Contracting Officer (CO)

• Submit the following to the CO by the 10th work day of each month:

Hazardous Material Usage Report (example on slide 5)

Compact Disc (CD) with a copy of the completed form (formatted in

Microsoft Word© or Excel©) and copies of the manufacturer SDSs

[formatted in Adobe© Portable Document Format (pdf)]

• If there is a change or new material is added after the monthly report is submitted:

– Submit an updated Usage Report (with SDSs) no later than the same work day that the material is received on the installation

JBSA-FSH HAZMAT Management

502 Civil Engineering Squadron (CES) Environmental Compliance , Bldg 4196

Steven Diaz, JBSA HM Manager, 295-0936, steven.diaz.2@us.af.mil