Rad permit company request letter template.pdf

PDF 93 KB Posted

Attached to
RPR Porte Cochere, JBSA Fort Sam-Houston, TX Federal contract opportunity
Solicitation number
FA3047-15-T-0031
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendix File

View the file

Other files for this federal contract opportunity

Other files attached to RPR Porte Cochere, JBSA Fort Sam-Houston, TX, newest first.
File Type Posted
FA304715T00310001-150914.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
JBSF150112-RPR_Porte_Cochere.dwg DWG drawing
Installation Access Credential —
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
FA304715T0031.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
01 33 00 Submittal Procedures.doc DOC document
CEPT Work Request Form Editable.pdf PDF
JBSF150112_SOW-Final_150902.pdf PDF
Binder1.pdf PDF
01 35 30 Safety Health and Emergency Response.doc DOC document
5_-_AETC_Form_47.pdf PDF
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
Attach 1 - 502 CES_CEIE Contractor HAZMAT Req'ts_2Apr15_mdb.pdf PDF
request to use radioactive material.pdf PDF
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
DBA_WD_150280.docx DOCX document
01 74 19.00 Construction Waste Management.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
Required Specification List.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 52 13.00 Temporary Facilities and Controls.doc DOC document
01 71 23.16 Cutting and Patching.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
01 78 36.00 Warranty of Construction.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 31 00 44 Project Meetings.doc DOC document
Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Your Company Letterhead) Date

Company Name Address

Mr. Wayne Blanco-Cerda Joint Base Ft. Sam Houston RSO 502d ABW/SEG 2250 Engineer St. Bldg 4196 Ft. Sam Houston, TX 78234-5036

Greeting

We are writing this correspondence as a request to use radioactive material, specifically

Troxler and Humboldt Series #### moisture density gauges on Fort Sam Houston

(Camp Bullis and Canyon Lake are covered by JBFSH/RSO, but must be identified if by location if work is to be performed there) for the (Project Name, Contract Number). We have attached a copy of the Air Force/Army Contract describing work to be performed with the official start date and scheduled completion date of the project. We estimate using gauges on the project from (date) to (date).

The following is submitted for your review and approval: (Please edit and format accordingly)

1. Our gauges have been leak tested in accordance with NRC Regulations, and were found to be acceptable. Copies of current leak tests are attached.

2. Attached you will find a copy or our Nuclear Regulatory Commission (NRC)

Form 374, Radioactive Material License.

3. Or NRC Form 241, Report of Proposed Activities in Non-Agreement States with the NRC.

4. And a copy of the Texas Radioactive Material License (TRC Form 12-1). This form must accompany the NRC Form 241.

5. The authorized gauge users list, and certificates of training.

6. Radiation Safety Program to include standard operating procedures (SOP), training program and designation of Radiation Protection/Safety Officer.

7. Your request for written confirmation that the JBFSH/RSO can conduct periodic assessments and has authority to suspend contractor operations believed to be unsafe is also included.

“___(Your Company Name) ___ recognizes that the Joint Base Ft. Sam Houston

Radiation Safety Officer (RSO) is authorized to periodically conduct assessments to ensure compliance with radiation safety practices to prevent exposures to Air Force personnel and to prevent contamination of Government property. Additionally, ___(Your

Company Name) ___ recognizes the authority of the JBFSH/RSO to suspend contractor operations believed to be unsafe.”

If you need additional information please call (Your company RSO @ xxx-xxx-xxxx).

Salutation

File details come from the government source that posted it. Updated .