Amendment 0003 - Solicitation Amendment - FA303020R00010003.pdf

PDF 571 KB Posted

Attached to
Simplified Acquisition Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA303020R0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document summarizes a solicitation for a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide maintenance, repair, alteration, and construction services at Goodfellow Air Force Base and its recreation camp in Texas. Services include a broad range of real property maintenance and minor construction work. The contract will have a one-year basic period followed by four one-year options and will be awarded as a single-award IDIQ with both minimum and maximum values between $300,000 and $10,000,000 over the life of the contract. An initial task order of at least $300,000 will be issued upon award. Responsible 8(a) small businesses in Texas may submit proposals by December 2, 2019 to be considered for award. The contractor will perform task order work using prepriced items from RSMeans Facilities Construction Cost Data and appropriate price coefficients.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineering Requirements (SABER), newest first.
File Type Posted
Amendment 0005 - Solicitation Amendment FA303020R00010005 SF 30.pdf PDF
Amendment 0005 - Attachment 14 - Questions Answers 04 Dec 19.pdf PDF
Amendment 0005 - Solicitation Amendment - FA303020R00010005.pdf PDF
Amendment 0005 - Attachment 15 - Record of Attendance.pdf PDF
Amendment 0004 - Solicitation Amendment - FA303020R00010004.pdf PDF
Amendment 0004 - Solicitation Amendment - FA303020R00010004 SF 30.pdf PDF
Amendment 0004 - Attachment 14 - Questions & Answers 02 Dec 19.pdf PDF
Amendment 0003 - Attachment 11 - Seed - Soo Replace Lights on Scherz - Revised.pdf PDF
Amendment 0003 - Solicitation Amendment FA303020R00010003 SF 30.pdf PDF
Amendment 0003 - Attachment 14 - Questions & Answers.pdf PDF
Amendment 0002 - FA303020R00010002.pdf PDF
Amendment 0002 - FA303020R00010002 - SF 30.pdf PDF
Amendment 0001 Attachment 1 - Section L 14 Nov 19.pdf PDF
Amendment 0001 Attachment 9 - Past Performance Questionaire.pdf PDF
Amendment 0001 Solicitation Amendment FA303020R00010001 SF 30.pdf PDF
Amendment 0001 Solicitation Amendment - FA303020R00010001.pdf PDF
Amendment 0001 Attachment 2 - Section M 14 Nov 19.pdf PDF
Attachment_7_-_SABER_Specifications_-_Part_2.pdf PDF
Attachment_9_-_Past_Performance_Questionnaire_DRAFT.pdf PDF
Attachment_6_-_Wage_Determination_-_Residential_-_TX20190226.pdf PDF
Attachment_13_-_Base_Access_Letter-_TEMPLATE.pdf PDF
Attachment_3_-_NAF_General_Provisions_-_19_Dec_2018.pdf PDF
Attachment_2_-_Section_M.pdf PDF
Attachment_4_-_Wage_Determination_-_Building_TX20190282.pdf PDF
Attachment_7_-_SABER_Specifications_-_Part_1.pdf PDF
Attachment_11_-_Seed_-_SOO_Replace_Lights_on_Scherz.pdf PDF
Attachment_12_-_Seed_-_Street_Lighting_Plan_Drawing.pdf PDF
Attachment_5_-_Wage_Determination_-_Heavy_Highway_-_TX21090002.pdf PDF
Attachment_8_-_Cost_Proposal_Transmittal_Template.pdf PDF
Attachment_1_-_Section_L.pdf PDF
Solicitation_-_FA303020R0001.pdf PDF
Attachment_10_-_Seed_RFP.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

FA303020R00010003

Section A - Solicitation/Contract Form

Section B - Supplies or Services and Prices/Cost

Additional Information/Notes

SUPPLIES AND SERVICES

(a) Bare Cost Total in the current year's RSMeans (Computerized Pricing Guide - CPG) cost estimating database compatible with e4Clicks Premier and Assemblies, Facilities and Master Composite (e4Clicks P/N E4CBundle-010) shall be referred to as the Unit Price Book (UPB). Additionally, the Bare Costs listed in the UPB listed above will not be localized.

(b) PRICING COEFFICIENTS: The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The Offeror's coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S. Means costs data books listed in paragraph (a), above, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services;

daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax;

general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract; consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. The coefficients will not be localized and are not subject to economic price adjustments. The coefficients will remain unchanged under the terms and conditions of the contract. The categories of pricing coefficients in this contract are based on work hours, location of the work and bare cost dollar value. If a task order includes work that has more than one applicable pricing coefficient category, then the coefficient will be determined based on the preponderance of the work and applied to the total direct costs.

(c) Hours of Work shall be defined as follows:

(1) Standard Working Hours (also referred to as Normal Duty Hours). The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days (see Section F, paragraph entitled "NORMAL WORK HOURS"). The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least four (4) full work days in advance of the desired date, and (b) the Contracting Officer approves the request. Non-standard hours worked at the convenience of the Contractor and with the approval of the Contracting Officer will be at a standard hours coefficient.

(2) Non-Standard Working Hours. Non-standard working hours are defined as the period from 4:30 p.m. to 7:30 a.m., Monday through Friday, as well as weekends and federal holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor technical/cost proposals, including justification for the request. Non-standard hours, worked without the express approval of the Contracting Officer, will be at the coefficient for standard hours. Non-Standard work hours requested by the Government will be stated on the Request for Proposal. Task Orders subject to an accelerated construction schedule may also have the non-standard working hours coefficient applied to the Task Order (TO) items.

(d) Work Areas shall be defined as follows:

(1) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited. Contractor personnel are permitted access to these areas on a need basis only.

(2) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the USAF Controlled areas.

(e) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.

(f) Sections K, L and M will be deemed incorporated in the resultant award, by reference.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM QUANTITY

MINIMUM AMOUNT $300,000.00

MAXIMUM QUANTITY

MAXIMUM AMOUNT $10,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM QUANTITY

MINIMUM AMOUNT $15,000.00

MAXIMUM QUANTITY

MAXIMUM AMOUNT $750,000.00

Item Supplies/Service Quantity Unit Unit Price Amount

0001 Basic Period, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

0001AA Standard Hours - Non Secure Area Under $200K Firm Fixed Price

3.0 Lot

0001AB Standard Hours - Secure Area Under $200K Firm Fixed Price

1.0 Lot

0001AC Non-Standard Hours - Non-Secure Area Under $200K Firm Fixed Price

1.0 Lot

0001AD Non-Standard Hours - Secure Area Under $200K Firm Fixed Price

1.0 Lot

0002 Basic Period, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

0002AA Standard Hours - Non Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

0002AB Standard Hours - Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

0002AC Non-Standard Hours - Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

0002AD Non-Standard Hours - Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

0003 Basic Period, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

0003AA Standard Hours - Non Secure Area Over $500K Firm Fixed Price

1.0 Lot

0003AB Standard Hours - Secure Area Over $500K Firm Fixed Price

1.0 Lot

0003AC Non-Standard Hours - Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

0003AD Non-Standard Hours - Secure Area Over $500K Firm Fixed Price

1.0 Lot

0004 Base Period, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 1, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

1001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

3.0 Lot

Option Line Item

1001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

1001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

1001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 1, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

1002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

1002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

1002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

1002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 1, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

1003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

1003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

1003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

1003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 1, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 2, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

2001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

3.0 Lot

Option Line Item

2001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

2001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

2001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 2, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

2002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

2002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

2002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

2002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 2, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

2003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

2003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

2003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

2003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 2, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 3, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

3001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

3.0 Lot

Option Line Item

3001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

3001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

3001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 3, $200K to $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

3002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

3002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

3002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

3002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 3, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

3003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

3003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

3003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

3003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 3, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 4, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

4001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

3.0 Lot

Option Line Item

4001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

4001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

4001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 4, $200K to $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

4002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

4002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

4002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

4002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 4, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs general & administrative expense;

overhead; profit; project direct costs;

bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services; daily cleanup;

payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment;

additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage;

and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given SLIN.

Option Line Item

4003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

4003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

4003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

4003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

1.0 Lot

Option Line Item

Option Period 4, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

1.0 Lot

Section C - Description/Specifications/Statement of Work

Requirements Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX and Goodfellow AFB Recreation Camp.

-Enter coefficients into Section B.

-See Section L regarding Site Visit information.

-Verbal explanations given before award will NOT be binding. Any authorized changes to this solicitation will be made in writing by issuing an amendment(s) to the offerors. Offerors shall acknowledge the amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) with the offer.

-Projects under the resulting SABER contract will consist of construction work based on the Specifications (attachment 4) and be furthered defined within each individual task order. Work to be performed under the SABER contract will be within NAICS code 236220.

-Classification Code: Z - Maintenance, repair, and alteration of real property.

-Size Standard: $39,500,000.00 -Disclosure of Magnitude of Construction Projects: Between $5,000,000 and $10,000,000.

-Set aside for all responsible 8(a) concerns serviced by the San Antonio District Office or from firms with approved bona fide places of businesses within the geographical boundaries of the San Antonio District Office.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. 1996-08 0001 Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Email:

Telephone: 325-654-3765

0001AA Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Email:

Telephone: 325-654-3765

0001AB Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0001AC Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0001AD Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0002 Inspection and Acceptance Location

Both Destination

Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0002AA Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0002AB Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0002AC Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0002AD Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0003 Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler

Telephone: 325-654-3765 Email:

0003AA Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0003AB Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0003AC Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0003AD Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

0004 Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY BLVD

AF BPN NO MILSBILLS PROCESSES

GOODFELLOW AFB, TX 76908 4104

United States

OfficeCode:

Brian Wheeler Telephone: 325-654-3765 Email:

Option Line Item

1001AA

Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F1Z312 Cage:

DunsNumber:

Duns4Number:

CountryCode: USA

17 CES CERF RA

460 EAST KEARNEY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .