DIVISION 32 – EXTERIOR IMPROVEMENTS
SECTION 32 01 17.16
SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
08/08
PART 1 GENERAL
This guide specification covers the requirements for sealing cracks in bituminous pavements.
1.1 UNIT PRICES
1.1.1 Measurement
Determine the quantity of each sealing item to be paid for by actual measurement of the number of linear feet of in-place material that has been approved.
1.1.2 Payment
Payment will be made at the contract unit bid prices per linear foot for the sealing items scheduled. Include in the unit bid prices the cost of all labor, materials, and the use of all equipment and tools required to complete the work.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 509(2006) Elastomeric Cellular Preformed Gasket and Sealing Material
ASTM D 6690(2007) Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM D 789(2007) Determination of Relative Viscosity and Moisture Content of Polyamide (PA)
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS SS-S-200(Rev E; Am 2) Sealant, Joint, Two-Component, Jet-Blast-Resistant, Cold-Applied, for Portland Cement Concrete Pavement
1.3 SYSTEM DESCRIPTION
Machines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.
1.3.1 Routing Equipment
Provide routing equipment which is a self-powered machine operating a power driven tool or bit specifically designed for routing bituminous pavements. The bit shall rotate about a vertical axis at sufficient speed to cut a smooth vertical-walled reservoir in the pavement surface and shall maintain accurate cutting without damaging the sides or top edges of the reservoir. Provide a router capable of following the trace of the crack without deviation. The use of rotary impact routing devices will not be permitted for cleaning cracks.
1.3.2 Concrete Saw
Provide a self-propelled power saw with small diameter ( 6 inches or less) water-cooled diamond or abrasive saw blades for cutting cracks to the depths and widths specified and for removing filler that is embedded in the cracks or adhered to the crack faces. The diameter of the saw blade shall be small enough to allow the saw to closely follow the trace of the crack.
1.3.3 Sandblasting Equipment
Include in the sandblasting equipment an air compressor, hose, and long-wearing venturi-type nozzle of proper size, shape and opening. The maximum nozzle opening shall not exceed 1/4 inch. The air compressor shall be portable; and shall be capable of furnishing not less than 150 cfm and maintaining a line pressure of not less than 90 psi at the nozzle while in use. Demonstrate compressor capability under job conditions before approval. The compressor shall be equipped with traps that will maintain the compressed air free of oil and water. The nozzle shall have an adjustable guide that will hold the nozzle aligned with the crack about 1 inch above the pavement surface. Adjust the height, angle of inclination and the size of the nozzle as necessary to secure satisfactory results.
1.3.4 Waterblasting Equipment
Include with the waterblasting equipment a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water resupply equipment. The water tank and auxiliary resupply equipment shall be of sufficient capacity to permit continuous operations. The hose, wand, and nozzle shall be capable of cleaning the crack faces and the pavement surface on both sides of the crack for a width of at least 1/2 inch. A pressure gauge mounted at the pump shall show at all times the pressure in psi at which the equipment is operating.
1.3.5 Hand Tools
Hand tools may be used, when approved, for removing defective sealant from cracks and repairing or cleaning the crack faces.
1.3.6 Crack Sealing Equipment
Provide unit applicators, used for heating and installing the hot-poured crack sealant materials, that are mobile and equipped with a double-boiler, agitator-type kettle with an oil medium in the outer space for heat transfer; a direct-connected pressure-type extruding device with a nozzle shaped for inserting in the crack to be filled; positive temperature devices for controlling the temperature of the transfer oil and sealant; and a recording type thermometer for indicating the temperature of the sealant. Allow the sealant to circulate through the delivery hose and return to the inner kettle when not in use, due to the applicator unit design.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Installation of Sealant; G Manufacturer's instructions 30 days prior to the use of the material on the project. Installation of the material will not be allowed until the instructions are received.
SD-04 Samples
Materials; G Samples of the materials 30 days prior to their use on the project. No material will be allowed to be used until it has been approved.
SD-06 Test Reports
Test Requirements; G Reports of all tests. Perform testing of the materials in an approved, independent laboratory; submit certified copies of the test reports for approval 30 days prior to the use of the materials at the job site. Samples will be retained by the Government for possible future testing, should the materials appear defective during or after application.
1.5 QUALITY ASSURANCE
Test the crack sealant and backup material, when required, for conformance with the referenced applicable material specification. The materials will be tested by the Government. The cost of the first test of samples will be borne by the Government. If the samples fail to meet specification requirements, replace the materials represented by the sample and test the new materials at the Contractor's expense. Furnish samples of materials, in sufficient quantity to be tested upon request. Conformance with the test requirements of the laboratory tests specified will not constitute final acceptance of the materials. Final acceptance will be based on the performance of the in-place materials.
1.6 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the job site for defects; unload, and store them with a minimum of handling to avoid damage. Provide storage facilities at the job site to protect materials from weather and to maintain them at the temperatures recommended by the manufacturer.
1.7 ENVIRONMENTAL REQUIREMENTS
The ambient air temperature and the pavement temperature within the joint wall shall be a minimum of 50 degrees F and rising at the time of application of the materials. Do not apply sealant if moisture is observed in the crack.
PART 2 PRODUCTS
2.1 SEALANTS
Provide sealants conforming to ASTM D 6690, Type II or ASTM D 6690, Type I.
2.2 BACKUP MATERIALS
Provide backup material that is a compressible, non-shrinking, non-staining, non-absorptive material and nonreactive with the crack sealant. The melting point of the backing material shall be at least 5 degrees F greater than the maximum pouring temperature of the sealant being used, when tested in accordance with ASTM D 789. The material shall have a water absorption of not more than 5 percent by weight when tested in accordance with ASTM C 509. The backup material shall be 25 percent (plus or minus 5 percent) larger in diameter than the nominal width of the crack.
PART 3 EXECUTION
3.1 PREPARATION OF CRACKS
Immediately before the installation of the crack sealant, thoroughly clean the cracks to remove oxidized pavement, loose aggregate and foreign debris. The preparation shall be as follows:
3.1.1 Cracks
3.1.1.1 Hairline Cracks
Cracks that are less than 1/4 inch wide shall be sealed in accordance with ASTM D 2028 Grade MC-250.
3.1.1.2 Small Cracks
Cracks that are 1/4 to 3/4 inch wide shall be routed to a nominal width 1/8 inch greater than the existing nominal width and to a depth not less than 3/4 inch, sandblasted, waterblasted, or wire brushed and cleaned using compressed air.
3.1.1.3 Medium Cracks
Cracks that are 3/4 to 2 inches wide shall be sandblasted and cleaned using compressed air.
3.1.1.4 Large Cracks
Cracks that are greater than 2 inches wide shall be repaired using pothole repair techniques instead of sealing.
3.1.2 Existing Sealant Removal
Cut loose the in-place sealant from both crack faces and to a depth shown on the drawings, using a concrete saw or hand tools as specified in paragraph EQUIPMENT. Depth shall be sufficient to accommodate any backup material that is required to maintain the depth of new sealant to be installed. Prior to further cleaning operations, remove all old loose sealant remaining in the crack opening by blowing with compressed air.
3.1.3 Routing
Perform routing of the cracks using a rotary router with a bit that is at least 1/8 inch wider than the nominal width of the crack to remove all residual old sealant (resealing), oxidized pavement and any loose aggregate in the crack wall.
3.1.4 Sawing
Perform sawing of the cracks using a power-driving concrete saw as specified in paragraph EQUIPMENT. Stiffen the blade as necessary with suitable dummy (or used) blades or washers. Immediately following the sawing operation, clean the crack opening using a water jet to remove all saw cuttings and debris.
3.1.5 Sandblasting
Sandblast clean the crack faces and the pavement surfaces extending a minimum of 1/2 inch from the crack edges. Use a multiple-pass technique until the surfaces are free of dust, dirt, old sealant residue, or foreign debris that might prevent the sealant material from bonding to the asphalt pavement. After final cleaning and immediately prior to sealing, blow out the cracks with compressed air and leave them completely free of debris and water. Ensure that sandblasting does not damage the pavement.
3.1.6 Backup Material
Use backup material on all cracks that have a depth greater than 3/4 inch. Insert the backup material into the lower portion of the crack as shown on the drawings. Ensure that the backup material is placed at the specified depth and is not stretched or twisted during installation.
3.1.7 Rate of Progress of Crack Preparation
Limit the stages of crack preparation, which include routing, sandblasting of the crack faces, air pressure cleaning and placing of the backup material, to only that linear footage that can be sealed during the same day.
3.2 PREPARATION OF SEALANT
Do not heat hot-poured sealants in excess of the safe heating temperature recommended by the manufacturer, as shown on the sealant containers. Withdraw and waste sealant that has been overheated or subjected to application temperatures for over 4 hours or that has remained in the applicator at the end of the day's operation.
3.3 INSTALLATION OF SEALANT
3.3.1 Time of Application
Seal cracks immediately following final cleaning of the crack walls and following the placement of the backup material (when required). Cracks that cannot be sealed under the conditions specified, or when rain interrupts sealing operations, shall be re-cleaned and allowed to dry prior to installing the sealant.
3.3.2 Sealing the Crack
Immediately preceding, but not more than 50 feet ahead of the crack sealing operations, perform a final cleaning with compressed air. Fill the cracks from the bottom up to 1/4 inch below the pavement surface for vehicular traveled pavements and 1/8 inch for airfields. Remove excess or spilled sealant from the pavement by approved methods and discard it. Install the sealant in a manner which prevents the formation of voids and entrapped air. Several passes with the applicator wand may be necessary to obtain the specified sealant depth from the pavement surface. Do not use gravity methods or pouring pots to install the sealant material. Traffic shall not be permitted over newly sealed pavement until authorized by the Contracting Officer. Cracks shall be checked frequently to ensure that the newly installed sealant is cured to a tack-free condition within 3 hours.
3.4 CRACK SEALANT INSTALLATION TEST SECTION
Prior to the cleaning and sealing of the cracks for the entire project, construct a test section at least 200 feet long using the specified materials and approved equipment, to demonstrate the proposed sealing of all cracks of the project. Following the completion of the test section and before any other crack is sealed, inspect the test section to determine that the materials and installation meet the requirements specified. If materials or installation do not meet requirements, remove the materials and reclean and reseal the cracks at no cost to the Government. When the test section meets the requirements, it may be incorporated into the permanent work. Seal all other cracks in the manner approved for sealing the test section.
3.5 CLEANUP
Upon completion of the project, remove unused materials from the site and leave the pavement in a clean condition.
3.6 QUALITY CONTROL PROVISIONS
3.6.1 Crack Cleaning
Provide quality control provisions during the crack cleaning process to correct improper equipment and cleaning techniques that damage the bituminous pavement in any manner. Cleaned cracks shall be approved prior to installation of the crack sealant.
3.6.2 Crack Seal Application Equipment
Inspect the application equipment to ensure conformance to temperature requirements and proper installation. Evidences of bubbling, improper installing, and failing to cure or set will cause to suspend operations until causes of the deficiencies are determined and corrected.
3.6.3 Crack Sealant
Inspect the crack sealant for proper cure and set rating, bonding to the bituminous pavement, cohesive separation within the sealant, reversion to liquid, and entrapped air and voids. Sealants exhibiting any of these deficiencies, at any time prior to the final acceptance of the project, shall be removed from the crack, wasted, and replaced as specified herein at no additional cost to the Government.
3.7 DISPOSITION OF MATERIAL
All waste materials demolished shall be removed from the government property to an approved landfill site.
--End of Section--