03 39 00 00 10 - Concrete Curing.docx

DOCX document 21 KB Posted

Attached to
Centralized Aircraft Support System (CASS) Upgrade
Solicitation number
FA3016-17-R-0025
Issued by

About this file

SOW Appendix A, Specifications, FA3016-17-R-0025

View the file

Other files

File Type Posted
FA3016-17-R-0025-0004_Revise_Section_L_signed.pdf PDF
CASS_Attachment_7_Pneumatics_Hardware.pdf PDF
CASS_Attachment_2__Schematics.pdf PDF
CASS_Attachment_5_PLC_Hardware.pdf PDF
CASS_Attachment_6_PLC_Program_Data.pdf PDF
CASS_Attachment_3_Station_Hardware.pdf PDF
CASS_Attachment_4_Touch_Screens_Hardware.pdf PDF
FA3016-17-R-0025_CASS_System_Upgrades_2nd_Site_Visit_Q&A.docx DOCX document
2_-_SOW_TYMX150072_CASS_T-38_Row_2-7_Rev_22Jun2017.docx DOCX document
FA3016-17-R-0025_New_SOW_attch_D.pdf PDF
Appendix_D_-_CASS_Existing_Drawings,_2001.zip ZIP file
Questions_and_Answers__2.docx DOCX document
Questions_and_Answers__1.xlsx XLSX spreadsheet
Atch_2_Wage_Determination_02_June_17.pdf PDF
FA3016-17-R-0025-P00002_Unsuspend.pdf PDF
Appendix_D,_CASS_Drawing_2001.zip ZIP file
Atch_11_Project_Location.pdf PDF
32 13 11 - Concrete Pavement for Airfield and Other Heavy-Duty Pavements.docx DOCX document
Atch_4__Financial_Information_Questionnaire.docx DOCX document
Atch_7_AETC_Form_47.pdf PDF
01 10 00 —
32 01 19 61 - Resealing of Joints in Rigid Pavement.docx DOCX document
09 90 00 PAINTS AND COATINGS.doc DOC document
01 45 01 - Quality Control.doc DOC document
03 20 01 00 10 - Concrete Reinforcement.doc.docx DOCX document
RFP_FA3016-17-R-0025.docx DOCX document
Atch_9_Progress_Schedule.xlsx XLSX spreadsheet
Atch_3_Base_Access_Request.pdf PDF
03 01 30.71 - Concrete Rehabilitation.doc DOC document
Atch_10_Local_Information.pdf PDF
32 12 11 - Bituminous Surface Treatments.doc DOC document
32 01 19 - Field Molded Sealants for Sealing Joints in Rigid Pavements.doc DOC document
32 01 17.16 - Sealing of Cracks in Bituminous Pavements.doc DOC document
00 00 00 - Construction Contract Security Requirements.doc DOC document
03 15 00 00 10 - Concrete Accessories.docx DOCX document
03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK.doc DOC document
01 00 00 - General Requirements —
03 31 01 00 10 - Cast In Place Structural Concrete For Civil Works.docx DOCX document
32 17 24 00 10 - Pavement Markings.docx DOCX document
Atch_1_Statement_of_Work.pdf PDF
32 13 73 - Compression Joint Seals for Concrete Pavement.docx DOCX document
32 01 11 52 Rubber Removal.doc DOC document
32 17 23.00 20 PAVEMENT MARKINGS.doc DOC document
32 11 16 - Base Course for Rigid and Subases for Flexible Pavements.doc DOC document
Atch_5_Contractor_Responsibility_Questionnaire.docx DOCX document
01 54 00 - Green Procurement —
Section_01_35_35__Environmental_Protection Mar 15.pdf PDF
01 21 53 —
03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR CIVIL WORKS.doc DOC document
Appendix_C_Computerized_Master_Control_CASS_System.pptx PPTX presentation
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 03 - CONCRETE

SECTION 03 39 00.00 10

CONCRETE CURING

11/10

PART 1 GENERAL

This specification covers concrete work primarily for drainage structures, equipment slabs, and driveways.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 182 (2009) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats

ASTM INTERNATIONAL (ASTM)

ASTM C 171 (2007) Standard Specification for Sheet Materials for Curing Concrete

ASTM C 309 (2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 400 (1963) Requirements for Water for Use in Mixing or Curing Concrete

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Curing Materials; G Curing and Protection; G

SD-06 Test Reports

Testing and Inspection for CQC; G

1.3 DELIVERY, STORAGE, AND HANDLING

Materials shall be stored in such a manner as to avoid contamination and deterioration. Materials shall be capable of being accurately identified after bundles or containers are opened.

PART 2 PRODUCTS

2.1 CURING MATERIALS

2.1.1 Membrane-Forming Compound

Membrane-Forming curing compound shall conform to ASTM C 309, Type 1-D or 2, except that only a styrene acrylate or chlorinated rubber compound meeting Class B requirements shall be used for surfaces that are to be painted or are to receive bituminous roofing, or waterproofing, or floors that are to receive adhesive applications of resilient flooring. The curing compound selected shall be compatible with any subsequent paint, roofing, waterproofing, or flooring specified. Non-pigmented compound shall contain a fugitive dye, and shall have the reflective requirements in ASTM C 309 waived.

2.1.2 Burlap and Cotton Mat

Burlap and cotton mat used for curing shall conform to AASHTO M 182.

2.2 WATER

Water for curing shall be fresh, clean, potable, and free of injurious amounts of oil, acid, salt, or alkali, except that non-potable water may be used if it meets the requirements of COE CRD-C 400.

PART 3 EXECUTION

3.1 CURING AND PROTECTION

3.1.1 General

Concrete shall be cured by an approved method for the period of time given below:

Type III portland cement 3 days

Portland cement when accelerator is used to achieve high 3 days early strength, except when fly-ash

Type I portland cement 7 days

Type II portland cement 14 days

Portland cement blended with 25 percent of less fly-ash 14 days

Portland cement blended with more than 25 percent fly-ash 21 days

Immediately after placement, protect concrete from premature drying, extremes in temperatures, rapid temperature change and mechanical injury for the duration of the curing period. Concrete shall be protected from the damaging effects of rain for 12 hours and from flowing water for 14 days (7 days with Type III cement). No fire or excessive heat including welding shall be permitted near or in direct contact with concrete or concrete embedments at any time. Maintain air and forms in contact with concrete at a temperature above 50 degrees F for the first 3 days and at a temperature above 32 degrees F for the remainder of the specified curing period. Exhaust fumes from combustion heating units shall be vented to the outside of the enclosure, and heaters and ducts shall be placed and directed so as not to cause areas of overheating and drying of concrete surfaces or to create fire hazards. Materials and equipment needed for adequate curing and protection shall be available and at the site prior to placing concrete. No fire or excessive heat, including welding, shall be permitted near or in direct contact with the concrete at any time.

3.1.2 Moist Curing

Maintain concrete, to be moist-cured, continuously wet for the entire curing period, commencing immediately after finishing. If water or curing materials used stain or discolor concrete surfaces which are to be permanently exposed, the concrete surfaces shall be cleaned as approved. When wooden forms are left in place during curing, they shall be kept wet at all times. If steel forms are used in hot weather, non-supporting vertical forms shall be carefully broken loose from the concrete, soon after the concrete hardens, and curing water continuously applied into the void so as to continuously saturate the entire concrete surface. If the forms are removed before the end of the curing period, curing shall be carried out as on unformed surfaces, using suitable materials. Horizontal surfaces shall be cured by ponding, by continuous sprinkling, by continuously saturated burlap or cotton mats, or by continuously saturated plastic coated burlap. Burlap and mats shall be clean and free from any contamination and shall be completely saturated before being placed on the concrete. Provide an approved work system to ensure that moist curing is continuous 24 hours per day. Horizontal construction joints may be allowed to dry for 12 hours immediately prior to the placing of the following lift.

3.1.3 Membrane Forming Curing Compounds

3.1.3.1 Application Restrictions

Concrete may be cured with an approved membrane-forming curing compound in lieu of moist curing except that membrane curing will not be permitted on any surface to which a grout-cleaned finish is to be applied or other concrete is to be bonded, on any surface containing protruding steel reinforcement, on an abrasive aggregate finish. Membrane curing compound shall not be used on surfaces that are maintained at curing temperatures with free steam.

3.1.3.2 Pigmented Curing Compound

A pigmented curing compound meeting the requirements of the above paragraph may be used on surfaces that will not be exposed to view when the project is completed.

3.1.3.3 Non-pigmented Curing Compound

A non-pigmented curing compound containing a fugitive dye may be used on surfaces that will be exposed to view when the project is completed. Concrete cured with non-pigmented curing compound must be shaded from the sun for the first 3 days when the ambient temperature is 90 degrees F or higher.

3.1.3.4 Application

Apply the curing compound to formed surfaces immediately after the forms are removed and prior to any patching or other surface treatment except the cleaning of loose sand, mortar, and debris from the surface. The surfaces shall be thoroughly moistened with water, and the curing compound applied as soon as free water disappears. The curing compound shall be applied to unformed surfaces as soon as free water has disappeared and bleeding has stopped. The curing compound shall be applied in a two-coat continuous operation by approved motorized power-spraying equipment operating at a minimum pressure of 75 psi, at a uniform coverage of not more than 400 square feet per gallon for each coat, and the second coat shall be applied perpendicular to the first coat. Concrete surfaces that have been subjected to rainfall within 3 hours after curing compound has been applied shall be re-sprayed by the method and at the coverage specified. All concrete surfaces on which the curing compound has been applied shall be adequately protected for the duration of the entire curing period from pedestrian and vehicular traffic and from any other cause that will disrupt the continuity of the curing membrane.

3.1.4 Ponding or Immersion

Concrete shall be continually immersed throughout the curing period. Water shall not be more than 20 degrees F less than the temperature of the concrete.

3.1.5 Cold Weather Curing and Protection

When the daily ambient low temperature is less than 32 degrees F maintain the temperature of the concrete above 40 degrees F for the first seven days after placing. During the period of protection removal, control the air temperature adjacent to the concrete surfaces so that concrete near the surface will not be subjected to a temperature differential of more than 25 degrees F as determined by suitable temperature measuring devices furnished by the Contractor, as required, and installed adjacent to the concrete surface and 2 inches inside the surface of the concrete. Perform the installation of the thermometers as directed.

-- End of Section --