DIVISION 2 – EXISTING CONDITIONS

SECTION 02 41 00

DEMOLITION

GENERAL

1. SUBMITTALS: The procedures proposed for the accomplishment of salvage and demolition work shall be submitted for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property, which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.

2. GENERAL REQUIREMENTS: The work includes demolition or removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily so as to not allow accumulation inside or outside the building unless otherwise directed. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer.

3. DUST PROTECTION: The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the building and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

4. PROTECTION:

4.1 Protection of Existing Work: Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to insure against damage to existing work to remain in place, to be reused, or to remain the property of the Government. Any damage to such work shall be repaired or replaced as approved by the Contracting Officer at no additional charge to the Government. The Contractor shall insure that structural elements are not overloaded and be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under any part of this contract.

4.2 Protection of Buildings from the Weather: The interior of the building and all materials and equipment shall be protected from the weather at all times.

4.3 Protection of Trees: Trees within the project site which might be damaged during demolition and which is indicated to be left in place shall be protected by a 6-foot high fence. The fence shall be securely erected a minimum of 5-feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Any tree designated to remain that is damaged during the work under this contract shall be replaced.

4.4 Environmental Protection: All work and Contractor operations shall comply with the requirements of SECTION 01501: ENVIRONMENTAL PROTECTION.

5. BURNING: The use of burning at the project site for the disposal of refuse and debris will not be permitted.

6. USE OF EXPLOSIVES: Use of explosives will not be permitted.

7. AVAILABILITY OF WORK AREAS: Areas in which salvage and demolition work is to be accomplished will be identified on individual delivery orders.

8. EXISTING FACILITIES:

8.1 Utilities:

8.1.1 Utility Services: Disconnection of utility services, with related meters, equipment, relocation of existing utilities, and removal of abandoned utilities services stated shall be as directed by the Contracting Officer.

8.1.2 Removal of Utilities: Existing utilities shall be removed as indicated. When utility lines are encountered that are not indicated on the drawings the Contracting Officer shall be notified.

9.0 DISPOSITION OF MATERIAL:

9.1 Title to Materials: Title to all materials and equipment to be demolished, except Government salvage and historical items, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.

9.2 Material for Contractor Salvage: Material for salvage shall be stored as approved by the Contracting Officer. Salvage materials shall be removed from Government property before completion of the Contract. Material for salvage shall not be sold on the site.

9.3 Unsalvageable Materials: Concrete, masonry, and other noncombustible materials other than concrete permitted to remain in place, shall be disposed outside Government property. Combustible materials shall be disposed of in accordance with SECTION 01100 Environmental Protection.

9.4 Materials for Government Salvage:

9.4.1 Property of the Government Salvaged items shall be removed in a manner to prevent damage and packed or crated to protect the items from damage while in storage or during shipment. Containers shall be properly identified as to contents.

9.4.2 Damaged items: Items damaged during removal or storage shall be repaired or replaced to match existing.

9.5 Historical Items: Historical items shall be removed in a manner to prevent damage. The following items shall be delivered to the Government for disposition:

CORNER STONES.

Contents of Corner Stones.

Documents boxes wherever located on the site.

10. CLEAN-UP:

10.1 Debris and Rubbish: Debris and rubbish shall be removed from basement and similar excavations.

10.2 Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas.

10.3 Regulations: Local regulations regarding highway and disposal apply.

11. REMOVALS AND DISPOSAL OF ASBESTOS CONTAINING MATERIALS:

11.1 Project includes the removal and disposal of asbestos containing materials (ACM). The provisions of DIVISION 18, SECTION 18100 - ASBESTOS REMOVAL apply.

END OF SECTION

02 41 00 - 1

Other files

File Type Posted
FA3016-17-R-0025-0004_Revise_Section_L_signed.pdf PDF
CASS_Attachment_7_Pneumatics_Hardware.pdf PDF
CASS_Attachment_2__Schematics.pdf PDF
CASS_Attachment_5_PLC_Hardware.pdf PDF
CASS_Attachment_3_Station_Hardware.pdf PDF
CASS_Attachment_4_Touch_Screens_Hardware.pdf PDF
FA3016-17-R-0025_CASS_System_Upgrades_2nd_Site_Visit_Q&A.docx DOCX document
CASS_Attachment_8_3052_JBA_400Hz_SingleJacket_Sept_2016.pdf PDF
CASS_Attachment_1_Description,_Operation_and_Maintenance.pdf PDF
CASS_Attachment_6_PLC_Program_Data.pdf PDF
Appendix_D_-_CASS_Existing_Drawings,_2001.zip ZIP file
2_-_SOW_TYMX150072_CASS_T-38_Row_2-7_Rev_22Jun2017.docx DOCX document
FA3016-17-R-0025_New_SOW_attch_D.pdf PDF
Questions_and_Answers__1.xlsx XLSX spreadsheet
Questions_and_Answers__2.docx DOCX document
Atch_1_Statement_of_Work.pdf PDF
Atch_2_Wage_Determination_02_June_17.pdf PDF
FA3016-17-R-0025-P00001_Suspend_Solicitation.pdf PDF
01 10 00 —
32 01 19 61 - Resealing of Joints in Rigid Pavement.docx DOCX document
09 90 00 PAINTS AND COATINGS.doc DOC document
01 45 01 - Quality Control.doc DOC document
03 20 01 00 10 - Concrete Reinforcement.doc.docx DOCX document
RFP_FA3016-17-R-0025.docx DOCX document
Atch_9_Progress_Schedule.xlsx XLSX spreadsheet
Atch_3_Base_Access_Request.pdf PDF
03 01 30.71 - Concrete Rehabilitation.doc DOC document
Atch_11_Project_Location.pdf PDF
32 13 11 - Concrete Pavement for Airfield and Other Heavy-Duty Pavements.docx DOCX document
Atch_4__Financial_Information_Questionnaire.docx DOCX document
Atch_7_AETC_Form_47.pdf PDF
Section_01_35_35__Environmental_Protection Mar 15.pdf PDF
01 21 53 —
03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR CIVIL WORKS.doc DOC document
03 39 00 00 10 - Concrete Curing.docx DOCX document
Appendix_C_Computerized_Master_Control_CASS_System.pptx PPTX presentation
Atch_8_HAZMAT_Letter.pdf PDF
09 90 00.00 40 PAINTING AND COATING.doc DOC document
03 15 13.00 10 EXPANSION JOINT, CONTRACTION JOINT & WATER STOPS.doc DOC document
Atch_2_Wage_Determination.pdf PDF
02 83 00 —
Atch_6_Cost_Estimate_Breakdown.xls XLS spreadsheet
01 03 00 - Project Closeout.docx DOCX document
Appendix_B_CASS_Technical_Order.pdf PDF
Atch_10_Local_Information.pdf PDF
32 12 11 - Bituminous Surface Treatments.doc DOC document
32 01 19 - Field Molded Sealants for Sealing Joints in Rigid Pavements.doc DOC document
32 01 17.16 - Sealing of Cracks in Bituminous Pavements.doc DOC document
00 00 00 - Construction Contract Security Requirements.doc DOC document
03 15 00 00 10 - Concrete Accessories.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .