Attachment 8 - UFC 4 470 14 - Child Development Centers.pdf
PDF 1 MB Posted
- Attached to
- Child Development Center Playgrounds
- Solicitation number
- FA301027Q0002
About this file
This is Unified Facilities Criteria (UFC) 4-740-14 for Child Development Centers, effective August 28, 2026, that supersedes previous versions from 2002 and 2014. The document establishes comprehensive planning, design, construction, and operational standards for Department of Defense child development facilities serving children ages six weeks through five years across Navy, Marine Corps, Army, and Air Force installations.
The UFC specifies mandatory design requirements organized by functional program areas: core administration (entrance, reception, offices, isolation areas), staff support (break rooms, training facilities, storage), facility support (kitchens, laundry, janitorial services, security systems), and child activity rooms (CARs). Space requirements vary by Service and facility classification (Small, Medium, Large, Extra Large, or Mega). CAR space requirements are fixed and non-negotiable, with Navy and Marine Corps providing 850 square feet for infants/pre-toddlers, 950 for toddlers, and 1,440 for preschoolers. Army and Air Force provide comparable but slightly different room configurations. The document mandates caregiver-to-child ratios ranging from 1:4 for infants to 1:15 for school-age children, with maximum group sizes specified for each age group. Critical design elements include accessibility compliance, fire protection and life safety systems, security and antiterrorism measures per UFC 4-010-01, environmental site assessments, flood-resistant design, exterior acoustical criteria, and outdoor activity areas with age-appropriate play equipment. Services must approve site selection, design teams, facility requirements, and final design documents prior to project advancement. The criteria applies to new construction, repairs, alterations, additions, and design-build procurement methodologies both domestically and overseas.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFC 4-740-14
28 August 2026
UNIFIED FACILITIES CRITERIA (UFC)
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
CHILD DEVELOPMENT CENTERS
This Page Intentionally Left Blank
UNIFIED FACILITIES CRITERIA (UFC)
CHILD DEVELOPMENT CENTERS
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.
Indicate the Military Department Preparing Activity responsible for the document.
U.S. ARMY CORPS OF ENGINEERS
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity)
AIR FORCE CIVIL ENGINEER CENTER
Record of Changes (changes are indicated by \1\ ... /1/)
Change No. Date Location
This UFC supersedes FC 4-740-14N, dated April 2014 and UFC 4-740-14, dated August 2002.
FOREWORD
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States, its territories, and possessions is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA). Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.
UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Military Department’s responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Systems Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Technical content of UFC is the responsibility of the cognizant DoD working group. Defense Agencies should contact the respective DoD Working Group for document interpretation and improvements. Recommended changes with supporting rationale may be sent to the respective DoD working group by submitting a Criteria Change Request (CCR) via the Internet site listed below.
UFC are effective upon issuance and are distributed only in electronic media from the following source:
• Whole Building Design Guide website https://www.wbdg.org/dod.
Refer to UFC 1-200-01, DoD Building Code, for implementation of new issuances on projects.
AUTHORIZED BY:
THOMAS P. SMITH, P.E., SES
Chief, Engineering and Construction U.S. Army Corps of Engineers
S. KEITH HAMILTON, P.E., SES
Chief Engineer and Assistant Commander Planning, Design and Construction Naval Facilities Engineering Systems Command
THOMAS P. BROWN, SES
Deputy Director of Civil Engineers DCS/Logistics, Engineering & Force Protection (HAF/A4C) HQ United States Air Force
MARK S. SINDER, SES
Deputy Assistant Secretary of Defense (Infrastructure Modernization and Resilience) Office of the Secretary of Defense https://www.wbdg.org/FFC/DOD/ufc_implementation.pdf https://www.wbdg.org/dod i
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION
1-1 INCORPORATES AND CANCELS
1-2 PURPOSE AND SCOPE
1-3 APPLICABILITY
1-4 GENERAL BUILDING REQUIREMENTS
1-5 CYBERSECURITY
1-6 GLOSSARY
1-7 REFERENCES
CHAPTER 2 TECHNICAL REQUIREMENTS
2-1 REGULATORY AUTHORITIES
2-1.1 Navy
2-1.2 Marine Corps
2-1.3 Army
2-1.4 Air Force
2-2 REPAIRS, ALTERATIONS AND ADDITIONS
2-3 SCOPE OF FACILITY
2-3.1 Standard Designs
2-3.2 Function Program Areas
2-4 FACILITY PLANNING
2-4.1 Facility Classification
2-5 USERS OF FACILITY
2-5.1 Children
2-5.2 Facility Staff
2-5.3 Visitors
2-5.4 Age Groups and Group Sizes
2-5.5 Ages Accepted
2-5.6 Group Size and Caregiver/Child Ratio
2-5.7 Operational Considerations
2-6 SPACE REQUIREMENTS
2-6.1 Introduction
2-6.2 Space Programs ii
2-6.3 Core Administration, Staff Support and Facility Support
2-6.4 Child Activity Rooms
2-6.5 Multipurpose Rooms / Active Play Rooms
2-6.6 Sample Space Program and CAR Tables
2-6.7 Administrative Offices
2-6.8 Child Activity Rooms
2-7 ORGANIZATION AND LAYOUT
2-7.1 General Adjacencies
2-7.2 Child Activity Room Adjacencies
2-8 LOCATION DETERMINANTS AND SITE PLANNING
2-8.1 Environmental Site Assessments
2-8.2 Land Area Requirements
2-8.3 Site Selection
2-8.4 Noise Requirements
2-8.5 Natural Light
2-8.6 Site Development Considerations and Passive Strategies
2-8.7 Natural Environment
2-8.8 Site Elevation
2-8.9 Flood Resistant Design
2-8.10 Visibility
2-8.11 Hazards
2-8.12 Vehicular Traffic
2-8.13 Soil Testing
2-8.14 Domestic Water Testing
2-8.15 Site Layout
2-8.16 Internal Traffic Flow
2-8.17 Outdoor Activity Areas
2-9 SECURITY AND ANTITERRORISM
2-9.1 Army
CHAPTER 3 DESIGN
3-1 GENERAL
3-1.1 Authorized Building Program iii
3-2 ACCESSIBILITY
3-3 STRUCTURE
3-3.1 Foundation
3-4 ARCHITECTURE
3-4.1 Exterior Design
3-4.2 Stories
3-4.3 Entrance
3-4.4 Roof
3-4.5 Windows and Doors
3-4.6 Exterior Wall Criteria
3-4.7 Interior Construction
3-5 INTERIOR DESIGN
3-5.1 Finishes
3-5.2 Finish Selection
3-5.3 Finish Salient Characteristics
3-5.4 Kitchen Design
3-6 ACOUSTICS
3-6.1 Exterior Acoustics
3-6.2 Noise Levels
3-6.3 Acoustical Criteria
3-6.4 Interior Acoustics
3-7 PLUMBING
3-7.1 General
3-7.2 Tornado Storm Shelter
3-7.3 Water Quality Testing
3-8 MECHANICAL
3-8.1 General
3-8.2 Safety Requirements
3-9 FIRE PROTECTION AND LIFE SAFETY
3-9.1 Occupancy Classification
3-9.2 Fire Separation Distance
3-9.3 Exit Requirements iv
3-9.4 Pedestrian Emergency Evacuation Sidewalk Route and Gathering Area.
3-9.5 Air Force Requirements for Emergency Evacuation Route and Gathering Area
3-9.6 Additional Exiting Requirements for Extreme Cold Weather Locations. ..
3-9.7 Fire Separation
3-9.8 Fire Extinguisher Cabinets
3-9.9 Fire Suppression Systems
3-9.10 Kitchen Suppression Systems
3-9.11 Fire Alarm and Mass Notification System
3-10 ELECTRICAL
3-10.1 Power
3-10.2 Lightning Protection
3-10.3 Primary Power
3-10.4 Standby Power
3-10.5 Metering
3-10.6 Interior Power
3-10.7 Interior Lighting
3-10.8 Exterior Lighting
3-10.9 Lighting Controls
3-10.10 Exit Marking
3-10.11 Emergency Lighting
3-11 TELECOMMUNICATIONS
3-11.1 Intercom System
3-12 SECURITY
3-12.1 Electronic Security Systems (ESS)
3-12.2 Intrusion Detection System (IDS)
3-13 ACCESS CONTROL SYSTEM (ACS)
3-13.1 Navy and Marine Corps
3-13.2 Army
3-13.3 Air Force
3-14 VIDEO SURVEILLANCE SYSTEM (VSS)
v
3-14.1 Navy
3-14.2 Marine Corps
3-14.3 Army
3-14.4 Air Force
3-15 CROSS-CORRIDOR SECURITY DOORS
3-15.1 Army
3-16 EXTERIOR SIGNAGE
3-17 SITE WORK
3-17.1 Grading and Drainage
3-17.2 Minimum and Maximum Slopes
3-17.3 Hydrologic Regime
3-17.4 Downspouts
3-17.5 Subsurface Drainage
3-17.6 Walkways
3-17.7 Parking/Vehicular Circulation
3-17.8 Parking and Vehicular Access Types
3-17.9 Pavement Markings
3-17.10 Curbing
3-17.11 Bicycle Rack
3-17.12 Perimeter Fencing
3-18 UTILITIES
3-18.1 Storm Drainage System
3-18.2 Wastewater System
3-18.3 Domestic Water
3-18.4 Fire Protection Water
3-19 LANDSCAPING
3-19.1 Child Safety
3-19.2 Child Learning Opportunities
3-19.3 Durability
3-19.4 Irrigation
CHAPTER 4 SPECIFIC DESIGN CRITERIA
4-1 INTRODUCTION
vi
4-1.1 Casework/Built-in Equipment
4-1.2 Furnishings, Fixtures, and Equipment (FF&E)
4-2 ADMINISTRATIVE, STAFF SUPPORT, AND FACILITY SUPPORT
4-3 CHILD ACTIVITY AREAS (CAR)
CHAPTER 5 OUTDOOR ACTIVITY AREAS
5-1 INTRODUCTION/PURPOSE
5-2 PLANNING CRITERIA
5-2.1 Size
5-2.2 Layout
5-2.3 Utilize Existing Features
5-2.4 Utilities
5-2.5 Drainage
5-2.6 Access and Exiting
5-3 GENERAL DESIGN CRITERIA
5-3.1 Accessibility
5-3.2 Accessibility Pathways
5-3.3 Access to Use Zone Surfacing
5-3.4 Sensory Rich Materials
5-3.5 Special Requirements
5-3.6 Exterior Storage
5-3.7 Fencing
5-3.8 Navy and Marine Corps
5-3.9 Army
5-3.10 Air Force
5-3.11 Shade
5-3.12 Size Requirements
5-3.13 Structures
5-3.14 Play Equipment
5-3.15 Industry Standards
5-3.16 Additional DoD Standards
5-3.17 Selection Criteria
5-3.18 Installation Criteria vii
5-3.19 Exclusions
5-3.20 Exceptions and Modifications
5-3.21 Surfaces
5-3.22 Use Zones
5-3.23 Wheeled Toy Pathways
5-3.24 Other Hard Surface Areas
5-3.25 General
5-3.26 Plumbing
5-3.27 Drinking Water
5-3.28 Misters
5-3.29 Irrigation System
5-4 AGE-SPECIFIC AREA DESIGN CRITERIA
5-4.1 Infant and Pre-toddler
5-4.2 Toddlers
5-4.3 Preschoolers/Pre-K/Kindergarten
APPENDIX A BEST PRACTICES
A-1 INTRODUCTION
A-2 DESIGNING FOR CHILDREN
A-2.1 Stages of Development
A-2.2 Infants
A-2.3 Toddlers
A-2.4 Preschool
A-2.5 Anthropometric Guidelines
A-2.6 Choking Hazards
A-3 GENERAL DESIGN GUIDANCE
A-3.1 Space Attributes
A-3.2 Exterior Design
A-3.3 Interior Design
A-3.4 Signage and Wayfinding
A-3.5 Site Walkways
A-4 LANDSCAPING
A-4.1 Buffers viii
A-4.2 Building Entry
A-5 INDIVIDUAL ROOM DESIGN GUIDANCE
A-5.1 Entrance/Lobby/Reception
A-5.2 Child Activity Rooms
A-5.3 Infants
A-5.4 Pre-toddlers
A-5.5 Toddlers
A-5.6 Preschool
A-6 OUTDOOR ACTIVITY AREA
A-6.1 Safety Background
APPENDIX B SAMPLE FURNISHINGS, FIXTURES, AND EQUIPMENT LISTS
B-1 FF&E SAMPLE LISTS
APPENDIX C GLOSSARY
C-1 ACRONYMS
APPENDIX D REFERENCES
D-1 GOVERNMENT
D-2 NON-GOVERNMENT
FIGURES
Figure 2-1 Functional Relationship Bubble Diagram
Figure 3-1 Long Narrow Lite
Figure 4-1 Entrance/Lobby/Corridors/Vestibule
Figure 4-2 Reception / Work Area
Figure 4-3 Administrative Offices
Figure 4-4 Break / Staff Room
Figure 4-5 Training Room
Figure 4-6 Central Storage
Figure 4-7 Staff / Public Toilets / Janitor’s Closet
Figure 4-8 Kitchen
Figure 4-9 Laundry
Figure 4-10 Child Activity Rooms (CARs)
Figure 4-11 CAR Toilets ix
Figure 4-12 CAR Diaper Changing Area
Figure 4-13 CAR Adult Sink with Counter
Figure 4-14 Child Interest Centers
Figure 4-15 Multipurpose Room/Active Play Room
Figure 4-16 Lactation Space
Figure 4-17 Nurse’s Office (Marine Corps) / Isolation Area (Army) / Health Room (Air Force)
Figure 4-18 Outdoor Activity Area
Figure A-1 Anthropometric Dimensions
TABLES
Table 2-1 Program Areas
Table 2-2 Caregiver/Child Ratios
Table 2-3 Sample Program Space Requirements for Core Administration (Navy, Marine Corps)
Table 2-4 Sample Program Space Requirements for Staff Support (Navy, Marine Corps)
Table 2-5 Sample Program Space Requirements for Facility Support (Navy, Marine Corps)
Table 2-6 CAR Space Requirements (Navy, Marine Corps)
Table 2-7 Sample Program Space Requirements for Core Administration (Army) 21
Table 2-8 Sample Program Space Requirements for Staff Support (Army)
Table 2-9 Sample Program Space Requirements for Facility Support (Army) .. 23
Table 2-10 CAR Space Requirements (Army)
Table 2-11 Sample Program Space Requirements for Core Administration (New Facilities - Air Force)
Table 2-12 Sample Program Space Requirements for Staff Support (New Facilities – Air Force)
Table 2-13 Sample Program Space Requirements for Facility Support (New Facilities – Air Force)
Table 2-14 CAR Space Requirements (New Facilities – Air Force)
Table 2-15 CAR Space Requirement Breakdown (Navy, Marine Corps)
Table 2-16 CAR Space Requirement Breakdown (Army) x
Table 2-17 CAR Space Requirement Breakdown (Air Force)
Table 3-1 Army Hardware Schedule
Table 3-2 Navy and Marine Corps Hardware Schedule
Table A-1 Anthropometrical Data
Table B-1 Sample FF&E List for Child Development Centers (Navy, Marine Corps)
Table B-1 Sample FF&E List for Child Development Centers (Navy, Marine Corps) (Cont.) 153
Table B-1 Sample FF&E List for Child Development Centers (Cont.)
Table B-1 Sample FF&E List for Child Development Centers (Navy, Marine Corps) (Cont.) 155
Table B-2 Sample Kitchen Equipment List for Child Development Centers (Navy, Marine Corps)
Table B-3 Sample FF&E List for Child Development Centers (Army)
Table B-4 Equipment Matrix (Air Force)
CHAPTER 1 INTRODUCTION
1-1 INCORPORATES AND CANCELS.
This UFC incorporates and cancels UFC 4-740-14, Design: Child Development Centers (USACE and Air Force only), dated 1 August 2002 and FC 4-740-14N, Navy and Marine Corps Child Development Centers, dated 1 April 2014 and all other unpublished draft FCs.
1-2 PURPOSE AND SCOPE.
This UFC provides requirements for evaluating and planning the site, determining programming requirements, establishing space distribution needs, determining building size, and designing indoor and outdoor spaces for Department of Defense (DoD) Child Development Center (CDC) facilities to support child development programs. The information in this UFC applies to the design of new construction projects including repair, alteration, conversion and addition projects in the continental United States and overseas. It also applies to the procurement of design/build services for the above-noted projects. Further, this UFC serves as an ongoing program management tool within CDCs. This UFC is not intended as a substitution for thorough review during design by individual Program Managers and Operations Staff in the appropriate Service.
1-3 APPLICABILITY.
This UFC follows the same applicability as UFC 1-200-01, paragraph 1-3, with no exceptions.
This UFC is intended to be a source of basic architectural and engineering information for individuals involved in the planning, programming, design, or evaluation of CDC facilities and in managing a CDC. Where one Service's criteria vary from the other Services' criteria, it is noted in the text as a Service Exception. Navy exceptions do not apply to the Marine Corps unless specifically noted. Joint Bases must follow the Service criteria for the Supporting Component. The term “Air Force” is used in the text to indicate applicability to Department of the Air Force installations, including Space Force installations, unless otherwise noted.
1-4 GENERAL BUILDING REQUIREMENTS.
Comply with UFC 1-200-01, which provides applicability of model building codes and government unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high performance and sustainability requirements in accordance with UFC 1-200-02, and safety. Use this UFC in addition to UFC 1-200-01 and the other UFCs and criteria referenced therein.
See Chapter 5, “General Design Criteria,” for additional certification requirements on the design of the outdoor activity area, including the selection and installation of playground equipment.
1-5 CYBERSECURITY.
Facility-related control systems (including systems separate from a utility monitoring and control system) must be planned, designed, acquired, executed, and maintained in accordance with UFC 4-010-06, and as required by individual Service Implementation Policy.
1-6 GLOSSARY.
APPENDIX C contains acronyms, abbreviations, and terms.
1-7 REFERENCES.
APPENDIX D contains a list of references used in this document. The publication date of the code or standard is not included in this document. Unless otherwise specified, the most recent edition of the referenced publication applies in accordance with UFC 1-200- 01.
CHAPTER 2 TECHNICAL REQUIREMENTS
2-1 REGULATORY AUTHORITIES.
Prior to project development, confirm the acquisition methodology and coordinate the design team composition and facility requirements with the following contacts for the appropriate Service. The following authorities must approve the acquisition methodology, the design team composition, site selection, facility requirements, the DD Form 1391, concept development, and the final Design-Build (DB) request for proposal (RFP) or final Design-Bid-Build (DBB):
2-1.1 Navy.
• Commander of Naval Installations Command (CNIC) N96 Child and Youth Programs, and N944 Fleet and Family Readiness, Integrity Drive, Millington, TN 38055-6560
• NAVFAC FEC
Planners must contact N96 and N944 during planning development and prior to final signature of the DD Form 1391.
2-1.2 Marine Corps.
• Headquarters Marine Corps (HQMC), Marine and Family Programs Division (MFY-3)
• MCICOM GF-AM (Asset Management)
• Headquarters Marine Corps, Business and Support Division (MRD)
Planners must contact HQMC MFY-3 during planning development and prior to final signature of the DD Form 1391.
2-1.3 Army.
• United States Army Materiel Command (AMC) IMCOM DFMWR Child and Youth Services (CYS)
• USACE Engineering & Support Center, Huntsville (CEHNC) Centers of Standardization (COS)
Planners must contact the Army Center of Standardization during planning development and prior to final signature of the DD Form 1391. The Building Official/Authority Having Jurisdiction (BO/AHJ) is the Chief of Engineering and Construction at the District or Center responsible for the project. For additional details, refer to UFC 1-200-01.
2-1.4 Air Force.
Facility modifications, renovations or additions or changes must be coordinated with the local Civil Engineer Squadron, Air Force Services Center (AFSVC) and the Air Force Civil Engineering Center.
• Air Force Civil Engineer Center (AFCEC) for architectural issues (Facilities Directorate) and technical issues relating to fire, life safety, and certification (Operations Directorate).
• Air Force Services Center (AFSVC) for programmatic and functional requirements.
• HQ, Department of the Air Force, Director of Services (DAF/A1SOC) for functional policies.
2-2 REPAIRS, ALTERATIONS AND ADDITIONS.
Repairs, alterations, and additions must update existing facilities to meet this guidance and criteria within budgetary constraints and structural limitations. Regulatory Authorities must be notified prior to repair, alteration, or additions to an existing facility.
2-3 SCOPE OF FACILITY.
The CDC accommodates a DoD child care program in accordance with Public Law 104- 106, Section 568 of Title 10, United States Code, and Department of Defense Instruction (DoDI) 6060.2, Child Development Programs. The Military Child Care Act (MCCA) of 1989 (Public Law101-89) was recodified as the Military Family Act and Military Child Care Act, February 10, 1996. These facilities are inclusive of all children and all abilities.
For conflicts between this UFC and Service specific requirements, contact the Regulatory Authorities for clarification.
2-3.1 Standard Designs.
This UFC serves as the framework for development of the CDC (for children ages 6 weeks - 5 years) facility type only. Reference additional guidance indicated below:
• Navy and Marine Corps: Navy and Marine Corps Standard Design - Child Development Center (CDC) on Whole Building Design website.
• Army: Centers of Standardization (COS) for CDC Criteria and Standard Designs (https://mrsi.erdc.dren.mil/cos/standard-designs/).
• Air Force: Air Force Standard CDC Design on Whole Building Design website.
For facilities that provide care for School Age Care, Middle School Youth and Teen programs reference UFC 4-740-06 Youth Centers.
2-3.2 Function Program Areas.
Table 2-1 lists and describes the CDC functional program areas. They are broken down into four categories: core administration, staff support, facility support, and child activity areas.
Table 2-1 Program Areas
Functional Program Area Description Core Administration
Entrance/Lobby/Waiting Area Includes vestibule, circulation from the vestibule to the reception desk, circulation in front of the reception desk, and areas dedicated to waiting.
Air Force: Vestibule must be securable with glass surround. Do not provide waiting area.
Public/Staff Toilet Architectural Barriers Act (ABA)-compliant.
Reception/Work Area Accommodates staff workers behind the reception counter and circulation to adjacent office spaces and the isolation/health area, if applicable. Includes office equipment and general work space.
Air Force: Implement AFSVC’s standardized custom millwork design for the reception desk.
No deviations allowed.
Administration Offices The required offices will vary by Service and Installation. Refer to Chapter 2, “Administrative Offices,” for Service contacts and additional guidance. Include associated storage.
Director Workspace, securable storage, and conference space for the CDC director.
Assistant Director(s) Workspace for an assistant director; not included for every Service or facility.
Facility Supervisors
Air Force: Workspace and securable storage for facility supervisors; not included for every Service or facility. Verify with Service contacts if this space is needed.
Community Child Care Coordinator
Air Force: Workspace, securable storage, and conference space for the Community Child Care Coordinator; not included for every Service or facility. Verify with Service contacts if this space is needed.
Table 2-1 Program Areas (Cont.)
Nurse's Office Army: Isolation Area Air Force: Health Room
Marine Corps, Army: Provides a private room to isolate a sick child from the rest of the children until a parent can pick up him or her.
Marine Corps: Additionally, this functions as a workspace that requires a desk, lockable storage, and a lockable medicine cabinet.
Air Force: Area for observing a sick child/youth.
Training and Curriculum Specialist(s)/Trainer
Workspace for specialist(s), space for staff training, and file storage. May be combined with other spaces.
Navy, Marine Corps: Provide T&C office, separate from the training room. Medium to extra-large facilities has multiple T&C employees, based on a ratio of staff-to-trainer.
Family Child Care (FCC) or Child Development Homes
(CDH)
Marine Corps: Workspace for program staff (one staff per 15 FCC providers, i.e., licensed or in the process of becoming licensed), one clerical, and file storage. May require additional space for an FCC lending program. May be located in the CDC or combined with other spaces.
Navy: Workspace for program staff (one staff per 30 CDH providers, i.e., licensed or in the process of becoming licensed) and file storage. May require additional space for a CDH lending program. Not included for every facility.
Resource and Referral Navy/Marine Corps: Workspace with securable storage. May be located in the CDC or combined with other spaces.
Lactation Room Accommodates mothers in a breastfeeding friendly environment.
Air Force: Provided in Shared Suite spaces adjacent to Child Activity Rooms.
Staff Support Break Room Includes counter/cabinet space for microwave and small appliances, sink and refrigerator;
tables and chairs; and individual lockable storage.
Staff Support (Cont.)
Training Room Space to facilitate staff training. Provide shelving or storage for resources and training supplies. Trainer may be co-located in training room or in separate office.
Navy/Marine Corps: Space may accommodate computers for TACS/T&C’s and staff to facilitate training/distant learning.
Air Force: Workspace, storage, and smartboard. Provide direct exterior access.
Training Room Storage Army: Storage of resources and training supplies. Separate from Training Room.
Central Storage Storage shelves/cabinets to store both bulk and individual items used throughout the facility.
Staff/Public Toilet ABA-compliant, distributed throughout facility, and sized based upon building code requirements.
Facility Support Car Seat and Stroller Storage Navy/Marine Corps: Prefer these near or at the entry to the wing for infants and pre-toddlers rooms.
Army: Accommodates storage space for car seats and strollers.
Air Force: Custom contractor-furnished, contractor-installed (CFCI) millwork to accommodate car seats must be provided in Shared Suite spaces adjacent to Child Activity Rooms.
Bye-Bye Buggy and Multi-seat Stroller Storage
Accommodate storage space for staff use and storage of bye-bye buggy and multi-seat stroller. Do not create blind corners.
Kitchen Accommodates food preparation, dishwashing, cart storage, dry goods storage, coolers and freezers, and cook work stations.
Air Force: Implement AFSVC's standardized kitchen floor plan and accompanying kitchen equipment specifications. No deviations allowed. Specified equipment has been vetted to precisely fit within standardized floor plan's footprint.
Facility Support (Cont.)
Janitorial Accommodates janitorial supplies, equipment, and mop sink.
Navy/Marine Corps: Large and Extra Large facilities may have more than one room.
Air Force: Each kitchen must have a separate janitorial closet.
Laundry Accommodates washers and dryers, a sink, work surface for folding, storage cabinet for detergents, and space for laundry carts or baskets.
Army: Provide floor sink.
Air Force and Navy: Washers and dryers must be stackable, with one dryer ABA compliant.
Air Force: Implement AFSVC CDC standardized Laundry Room floor plan and millwork configuration(s). Note that wash tub must be located directly in front of door.
Security and Monitoring Systems Accommodates video surveillance system (VSS) video equipment, intrusion detection system, access control system, and exit notification system.
Other Facility Support Includes building circulation, construction, mechanical rooms, communication rooms, and electrical rooms (see Chapter 4 for more information). Generally calculated as a percentage of total building area, ranging from 20 to 30 percent.
Child Activity Areas Child Activity Rooms (CAR) Accommodates developmental and routine activities, children's displays, eating, sleeping, and other child care activities in a self-contained environment. Each room accommodates two ratio groups and includes storage, food preparation, and diapering/toileting areas.
Child Activity Areas (Cont.)
Multipurpose Room / Active Play Rooms
Active Play Rooms (Army)
Optional. Service contacts provided in “Regulatory Authorities,” must provide approval for inclusion of this space. Space to accommodate children for large group activities, wheel toy play, exercise, group games, or indoor play. This room may also support other activities such as parenting classes and staff training.
Army: Provide Active Play Rooms for CDCs.
Multipurpose rooms are provided in Child Development Center – School Age (CDC-SA) and Youth Center (YC) Facilities only.
Outdoor Activity Areas Supervised outdoor areas with direct access from the CARs. Outdoor activity play areas serve as extensions of classroom space and must be provided to support programming.
Playground must be divided into individual separate areas to accommodate the different age groups occupying the facility. For large facilities, outdoor space may be divided for multiple areas for the same age groups.
Playground equipment must be arranged to so that children are visible and supervision is maintained.
Infants and/or Pre-toddlers Separate, fenced or naturally separated areas with visual and audible connections to the other outdoor activity areas and play equipment. Infant and pre-toddler areas may be combined or may be separate.
Navy: Rooms are interchangeable.
Dedicated Pre-toddler rooms exclude the use of cribs. Only infants have refrigerators under the counter.
Toddlers Toddlers/Preschool (Army)
Separate, fenced area with visual and audible connections to the other outdoor activity areas and play equipment.
Preschool Pre-Kinder/Kindergarten (Army)
Separate, larger fenced area with visual and audible connections to the other outdoor activity areas, play equipment, and more structured activity areas.
Child Activity Areas School Age School Age Additions only (Army) School Age Care (SAC) Facility only (Navy)
Separate, larger fenced area with visual and audible connections to the other outdoor activity areas, play equipment, and more structured activity areas.
2-4 FACILITY PLANNING.
Evaluate the total child care requirements for the populations and missions of the individual Installation. Plan and budget for durable materials and details. A CDC is used intensely, and the design must be sensitive to the life cycle cost of materials.
Conduct a Needs Validation Assessment (NVA) to determine the total childcare requirements for the population and mission of individual installations.
2-4.1 Facility Classification.
Once the demand has been determined, classify the facility size as follows:
• Small.
Less than 100 children/youth.
Army: Less than 126 children.
• Medium.
100 to 200 children/youth.
Army: 127-232 children.
• Large.
201 to 300 children/youth.
Army: 233-338 children.
- Air Force: 201 to 303 children/youth.
• Extra Large.
Navy and Marine Corps: 301 children/youth and up.
• Mega.
Air Force: 304 children/youth full capacity maximum size.
• School Age Addition
Refer to UFC 4-740-06 for additional criteria when attaching a CDC- School Age or Youth Center facility to a CDC.
2-5 USERS OF FACILITY.
The primary users of CDCs are as follows:
2-5.1 Children.
Reference table 2-2 for age range and adult/child ratios.
2-5.2 Facility Staff.
• Program Administrators/ Directors
• Assistant Directors
• Facility Supervisor (Air Force)
• School Age Care Coordinator (if applicable) (Air Force)
• Community Child Care Coordinator (Air Force)
• Training and Curriculum Specialist(s)
• Direct Care Staff
• Group Leaders/Caregivers/Program Assistants
• Family Child Care Director (Navy/Marine Corps)/Child Development Home Directors (Navy)
• Receptionist or Operations/Front Desk Clerks/U.S. Department of Agriculture (USDA) Clerks/Monitors
• Cooks and Food Service Staff
• Custodial Staff
• Maintenance
• Motor Vehicle Operators
• Contractors
2-5.3 Visitors.
a. Parents
b. Volunteers
2-5.4 Age Groups and Group Sizes.
Children are grouped according to age and different age group sizes vary. Navy, Marine Corps and Air Force: Group sizes are used to determine the number and type of CARs in the CDC.
2-5.5 Ages Accepted.
DoDI 6060.02 states that Child Development Programs (CDP) are for children from birth through 12 years; however, this UFC addresses design of CDC for children from six weeks through five years of age.
2-5.6 Group Size and Caregiver/Child Ratio.
Table 2-2 provides the age groups, ratios of caregivers to children, and group limits.
These ratios exceed NFPA and require additional life safety features; see Chapter 3, “Fire Protection and Life Safety,” for these additional requirements. In individual centers, actual age ranges between groups may overlap. In some centers, children may be grouped in mixed-age activity rooms. In these cases, use the design criteria for the youngest children in the group. Appendix A provides more information on the age groups and their developmental needs.
Table 2-2 Caregiver/Child Ratios
Group
Age Range
Adult/Child Ratio Group Limit*
Infants 0 through 12 months (until the child’s first birthday).
1 to 4 8 (Navy: 12***)
Pre-Toddlers 12 months through 24 months (until the child’s second birthday).
1 to 5 10
Toddlers 24 months through 36 months (until the child’s third birthday).
1 to 7 14
Preschool/Pre- K/ K
36 months through when child starts Kindergarten
1 to 12 (Army: 1 to 10 for Preschoolers, 1 to 12 for Kindergarten**)
(Army: 20 for Pre-Schoolers, 24 for Kindergarten**)
School Agers± When a child starts Kindergarten through the end of the school year after the child turns 12
1 to 15 (Army:
1 to 12 when co-mingled with Kindergarten)
* The group limit is the limit for children only.
**Reference Army Regulation (AR) 608-10 for exceptions to allow larger caregiver/child ratios.
***Group limit is increased to 12 if the room meets an occupancy of 35 SF per person with staff.
± Refer to UFC 4-740-06, the Army Standard and the Army Standard Design Criteria Room by Room Descriptions for additional criteria when attaching a Child Development Center - School Age facility to a Child Development Center.
2-5.7 Operational Considerations.
There are other programs who accommodate children whose parents are unavailable before and after school hours or who require care between school and family gathering time. However, in DoD facilities, before and after school care typically takes place in School Age Care (SAC) or Youth Centers. For standard operating hours, consult with the installation and headquarters (HQ).
2-6 SPACE REQUIREMENTS.
2-6.1 Introduction.
This UFC states area requirements in terms of Gross Floor Area (GFA), Net Floor Area (NFA), and Uninterrupted Activity Space (UAS). GFA is the total area of all floors measured to the exterior face of exterior walls. For additional information, refer to UFC 3-101-01. NFA is the net usable area of spaces within the inside perimeter of the outside walls, excluding the area required for building construction, mechanical and electrical equipment. Space requirements for individual spaces are expressed as NFA.
GFA is determined, where appropriate, by adding the NFA totals to an estimated area for building construction (including wall thickness, ventilation space, etc.) and mechanical/electrical equipment rooms.
Uninterrupted Activity Space (UAS) is defined as a subspace of the Child Activity program area, used exclusively for activity and excludes custom built-in millwork, diaper changing, food preparation, toilets, storage areas, installed millwork, door swings, and overall circulation space. Dedicated circulation is built into each subspace. For the Air Force and Army, custom built-in millwork includes cubbies, diaper changing stations, and base cabinets for storage and sinks.
2-6.2 Space Programs.
2-6.2.1 Navy, Marine Corps.
Sample space programs for the four CDC size classifications are illustrated in Tables 2- 3 to 2-6. They are grouped according to the four functional program areas. An interactive spreadsheet is available to help develop a space program for a specific project. It is completed by first selecting the appropriate facility size classification, which generates a partial space program in accordance with Tables 2-3 through 2-6. The programmer then must select the facility options and enter the quantity of age-specific CARs. The Child Development Center Space Program spreadsheet is titled “Child Development Center Space Program Spreadsheet” and is available as a downloadable Microsoft© Excel© file from the Whole Building Design Guide website.
2-6.2.2 Army.
Sample space programs for the three CDC size classifications are illustrated in Tables 2-7 to 2-10. They are grouped according to the four functional program areas. For new CDC’s, DA standard designs provide fixed sizes and functional arrangements for all facility size classifications.
2-6.2.3 Air Force.
The Air Force has a large and medium standardized CDC floor plan which must be companion documents to UFC 4-740-14. Should discrepancies occur between the space allotments discussed in this section and the floor plans' square footage, the space designated in the standardized floor plans must supersede the other. Interior dimensions of CAR’s may not be reduced. Sample space programs for the two Department of the Air Force (DAF) size classifications are illustrated in Tables 2-11 to 2-
14. They are grouped according to the four functional program areas. For new CDCs, DAF standard designs provide fixed sizes and functional arrangements for all facility size classifications.
2-6.3 Core Administration, Staff Support and Facility Support.
2-6.3.1 Navy, Marine Corps.
The space programs illustrated in Tables 2-3 to 2-6 are sample programs and are not intended to establish fixed design programs for CDC planning teams. Determine the actual total space program for CDC Core Administrative functions, Staff Support functions, and Facility Support functions by considering the anticipated number of children accommodated by the facility and the specific space and design criteria provided in this UFC.
2-6.3.2 Army.
The space programs illustrated in Tables 2-7 to 2-10 are sample programs and are not intended to establish fixed design programs for CDC planning teams. Refer to Army Standard Design Criteria Room by Room Descriptions for program space requirements.
2-6.3.3 Air Force.
The program space requirements illustrated in Tables 2-11 to 2-14 are goals for existing and non-standard facilities and are not intended to establish rigidly enforced design criteria for CDC planning teams. Determine the actual total space program for CDC Core Administrative functions, Staff Support functions, and Facility Support functions by considering the anticipated number of children accommodated by the facility and the specific space and design criteria provided in this UFC.
2-6.4 Child Activity Rooms.
The space requirements for CARs in Table 2-6 (Navy, Marine Corps), Table 2-10 (Army), and Table 2-14 (Air Force) are mandatory and must not be changed.
Determine the total number of activity rooms for specific age groups based on the number and ages of children to be accommodated in accordance with Chapter 2, “Technical Requirements” (only applicable for existing and non-standard CDCs when working with Air Force). Provide a Lactation Room near the Infant/Pre-toddler wing of the facility and visible to staff for monitoring. Air Force: Provide Lactation Space in Shared Suite spaces adjacent to Child Activity Rooms.
2-6.5 Multipurpose Rooms / Active Play Rooms.
Service contacts, provided in Chapter 2, Regulatory Authorities, will determine when climatic conditions warrant the requirement for a multipurpose room. In general, only Navy bases with extreme (heat, cold, rain) weather may consider programming a multipurpose room. Army: Provide Active Play Rooms for CDCs. Multipurpose rooms are typically provided in Child Development Center – School Age (CDC-SA) and Youth Center (YC) facilities only.
2-6.6 Sample Space Program and CAR Tables.
Tables 2-3 through 2-14 provide the previously mentioned sample space programs for each Service. Sizes shown are net areas.
Table 2-3 Sample Program Space Requirements for Core Administration (Navy, Marine Corps)
Standard CDC Areas
Functional Spaces Small Medium Large Extra Large ft.2 (m2) ft.2 (m2) ft.2 (m2) ft.2 (m2)
Entrance and Lobby. Includes a separate vestibule, circulation space from the vestibule to the reception desk, circulation space in front of the reception desk, and areas dedicated to waiting.
(11.2)
(16.7)
(37.2)
(41.8)
Reception/Work Area. Generally, includes space required for staff workers behind the reception counter and circulation space leading to adjacent office space, to the isolation room, and to the toilet. Does not include space for general public. Includes the net space required to enclose office equipment such as printers, faxes, copiers, computers, monitors, and video recording equipment, if any. Also includes general office work space (work tables or work surfaces).
(26.9)
(36.2)
(49.2)
(49.2)
Administration Offices. The required offices will vary both by Service and by Installation.
Refer to Chapter 2, “Administrative Offices,” for more information. These ranges are rough estimates.
to
(37.2 to
55.7) to
(49.2 to
67.8) to
(49.2 to 77.1) to
1,080 (81.8 to 100.3)
Nurse's Office. Marine Corps includes office and separate area for observing a sick child.
(7.4)
(7.4)
(14.9)
(14.9)
Nursing Mother’s Room (Army) / Lactation Space. Area for mothers (1-2) to have privacy in a breastfeeding friendly environment.
Includes space for soft seating, sinks, side table, diaper changing station, and millwork/counter. Extra Large requires two rooms.
(9.3)
(9.3)
(9.3)
(9.3)
Table 2-4 Sample Program Space Requirements for Staff Support (Navy, Marine Corps)
Standard CDC Areas
Functional Spaces Small Medium Large Extra Large ft.2 (m2) ft.2 (m2) ft.2 (m2) ft.2 (m2)
Break/Staff Room. Includes counter/cabinet space for microwave, sink and refrigerator, and space for tables and chairs for staff.
Provide lockable lockers for coats and jackets.
(21.4)
(25.1)
(32.5)
(39.9)
Training Room. Includes space for movable training tables, resource bookshelves, and minimum of two workstations (verify with program) for computer-based training. Sized to accommodate 30% of staff.
(26.0)
(35.3)
(44.6)
(53.9)
Central Storage. Generally, includes space required for storage of both bulk and individual items for use within the CARs and in the office area. Includes space to store audio/visual or other equipment that is rotated in the CARs or used in training.
(9.3)
(12.1)
(13.9)
(16.7)
Staff/Public Toilet. This area must be sized based upon building code requirements (occupant load/occupancy).
(11.2)
(18.6)
(26.0)
(33.4)
Table 2-5 Sample Program Space Requirements for Facility Support (Navy, Marine Corps)
Standard CDC Areas
Functional Spaces Small Medium Large Extra Large ft.2 (m2) ft.2 (m2) ft.2 (m2) ft.2 (m2)
Kitchen. Includes space for food preparation and dishwashing, as well as cart storage, dry goods storage, coolers and freezers, and work station for cooks.
Note: Areas include walk-in freezers and refrigerators for Medium CDCs and larger, sized for weekly deliveries.
(65.0)
1,000 (92.9)
1,200 (111.5)
1,400 (130.1)
Janitorial. Includes floor space required for storing janitorial supplies, flammable cabinet, and equipment. Includes a mop sink. Large and Extra Large facilities may have more than one room.
(5.6)
(5.6)
(7.4)
(7.4)
Bye-Bye Buggy Storage. Alcoves in the vicinity of the infants and pre-toddlers rooms for storage of bye-bye buggies.
(2.3)
(4.7)
(7.0)
(9.3)
VSS Room. Includes video equipment and electronic storage components for surveillance system. Co-location with communications room is possible based on user needs. See
UFC 3-580-01.
(5.6)
(5.6)
(5.6)
(5.6)
Laundry. Includes area required for washers and dryers (one dryer more than the number of washers), and a sink and work surface for folding. Stackable systems are acceptable. In large and extra-large facilities, (2) laundry rooms are permitted: (1) large laundry room and (1) small laundry room.
(7.4)
(10.2)
(12.1)
(20.4)
Other Facility Support. Generally calculated as a percentage of total building area, includes building construction, circulation/corridors, public restrooms, mechanical rooms, communication rooms, and electrical rooms (see Chapter 3, “Services,” for more information). A rough percentage of total building area for these items would range from 28 to 32 percent, however, these spaces are inherently variable because of installation-specific requirements. Consult with architect and CDC Program Manager when programming these spaces.
Table 2-6 CAR Space Requirements (Navy, Marine Corps)
Age Group(s) Accommodated Room Area ft.2
(m2) Infants and Pre-toddlers. This room can accommodate two groups of infants (eight children total) or two groups of pre-toddlers (10 children total).
850* (79)
Toddlers. This room can accommodate two groups of toddlers (14 children total).
950* (88.3)
Preschoolers. This room can accommodate two groups of Preschoolers (24 children total).
1,440* (133.8)
School Age (Optional). This room can accommodate two groups of school age (30 children total). Verify with HQ or Program Authority to include this room, refer to Ch. 1.
1,080* (100.3)
Multi-purpose Room (Optional) for Small and Medium CDCs.
Space to accommodate children for large group activities, wheel toy play, exercise, group games, or indoor play. Space includes storage and a toilet. This room may also support other activities such as parenting classes and staff training. Verify with HQ or Program Authority to include this room, refer to Ch. 1.
1,200 (111.5)
Multi-purpose Room (Optional) for Large and Extra-Large CDC’s. Space to accommodate children for large group activities, wheel toy play, exercise, group games, or indoor play. Space includes storage and a toilet. This room may also support other activities such as parenting classes and staff training. Verify with HQ or Program Authority to include this room, refer to Ch. 1.
2,200 (204.4)
Note: While the rooms are set up to accommodate more than one age group in terms of space and facilities, usually different age groups will never share a room.
See Chapter 2, “Child Activity Rooms” for more detailed breakdown of CAR spaces.
*Refer to Child Activity Room Space Requirement Breakdown in Tables 2-15 to 2-17.
Table 2-7 Sample Program Space Requirements for Core Administration (Army)
Standard CDC Areas
Functional Spaces Small Medium Large ft.2 (m2) ft.2 (m2) ft.2 (m2)
Vestibule/Waiting Area. Includes vestibule, circulation space from the vestibule to the reception desk, circulation space in front of the reception desk, and areas dedicated to waiting.
Refer to standard design.
Central Counter/Reception. Generally, includes space required for staff workers behind the reception counter and circulation space leading to adjacent office space, to the isolation room, and to the toilet. Does not include space for general public. Includes the net space required to enclose office equipment such as printers, faxes, copiers, computers, and video recording equipment, if any. Also includes general office work space (work tables or work surfaces).
Administration Offices. The required offices will vary both by Service and by Installation.
Refer to Chapter 2, “Administrative Offices,” for more information.
Admin Storage. General storage for office supplies and other supplies.
Isolation Area. Includes rest area for a sick child.
Isolation Area Toilet. Includes toilet area for a sick child.
Lactation Space. Individual private space for a nursing mother to provide care to her child.
Space for glider/rocking chair and a small side table.
Table 2-8 Sample Program Space Requirements for Staff Support (Army)
Standard CDC Areas
Functional Spaces Small Medium Large ft.2 (m2) ft.2 (m2) ft.2 (m2)
Staff Lounge. Includes counter/cabinet space for microwave, sink and refrigerator, and space for tables and chairs for staff. Provide lockers for coats and jackets.
Refer to standard design
Training Room. To facilitate training/distance learning by CDC staff.
Training Room Storage. General storage for training materials and supplies. Located adjacent to, and directly accessed from, the Training Room.
Central Storage. Space for storage of program material.
Staff/Public Toilet. This area must be sized based upon building code requirements (occupant load/occupancy).
Table 2-9 Sample Program Space Requirements for Facility Support (Army)
Standard CDC Areas
Functional Spaces Small Medium Large ft.2 (m2) ft.2 (m2) ft.2 (m2)
Kitchen. Includes space for food preparation and dishwashing, as well as cart storage, dry goods storage, coolers and freezers, and work station for cooks.
Janitor. Includes floor space required for storing janitorial supplies and equipment.
Includes a mop sink.
Buggy Storage. An alcove storage area to accommodate infant “bye-bye” buggies.
Stroller/Car Seat Area. Space for patrons’ car seats and strollers. Directly accessible from the corridor and accessible from the waiting area.
VSS Equipment Room. Includes video equipment and electronic storage components for surveillance system.
Laundry. Includes area required for washers and dryers, and a sink and work surface for folding.
Other Facility Support. Generally calculated as a percentage of total building area, includes building construction, circulation/corridors, public restrooms, mechanical rooms, and electrical rooms (see Chapter 3, “Services,” for more information). A rough percentage of total building area for these items would range from 25 to 30 percent, however, these spaces are inherently variable because of installation-specific requirements.
Table 2-10 CAR Space Requirements (Army)
Age Group(s) Accommodated Room Area ft.2
Infants/Pre-toddlers/Toddlers. This room can accommodate two program assistants and a maximum of 14 children (depending upon age of children). Includes a storage room and toilet area.
Refer to standard design for areas.
Preschoolers/Pre-K/Kindergarten and Outreach/Transitional Care. This room can accommodate two program assistants and a maximum of 24 children (depending on age of children). Includes a storage room and toilet area.
Active Play Room. An active indoor play area for CDC children to utilize during inclement weather/temperature extremes. Includes a storage room and toilet area.
*Refer to Child Activity Room Space Requirement Breakdown in Table 2-16.
Table 2-11 Sample Program Space Requirements for Core Administration (New Facilities - Air Force)
Functional Spaces Standard CDC Areas
Medium Large ft.2
(m2) ft.2
(m2) Entrance/Lobby. Includes vestibule, circulation space from the vestibule to the reception desk, circulation space in front of the reception desk, and areas dedicated to waiting. This area must include circulation space that allows easy access of food carts from the kitchen, if required.
1,181 (109.72)
1,213 (112.69)
Reception/Work Area. Generally, includes space required for staff workers behind the reception counter and circulation space leading to adjacent office space, to the health room, and to the toilet. Does not include space for general public. Includes the net space required to enclose office equipment such as printers, faxes, copiers, computers, and video recording equipment, if any. Also includes general office work space (work tables or work surfaces).
(49.15)
(43.29)
Administration Offices. The required offices will vary both by Service and by Installation.
Refer to Chapter 2, "Administrative Offices," for more information.
(53.88)
(62.34)
Health Room. Includes area for isolating and observing sick children.
(10.59)
(10.59)
Health Room Toilet. Includes area for use by sick children only. Space included in Health Room.
(5.02)
(5.02)
Table 2-12 Sample Program Space Requirements for Staff Support (New Facilities – Air Force)
Medium Large ft.2
(m2) ft.2
(m2) Break/Staff Room. Includes space for counter/cabinet space for microwave, sink and refrigerator, space for tables and chairs for staff. Provide closet or lockers for coats and jackets.
(44.59)
(43.20)
Training Room. Includes space for a conference room, resource bookshelves, etc. (includes Resource Area).
(57.04)
(58.06)
Central Storage. Generally, includes space required for storage of both bulk and individual items for use within the CARs and in the office area. Includes space to store audio/visual or other equipment that is rotated in the CARs or used in training.
(101.36)
(147.62)
Staff/Public Toilet. This area must be sized based upon building code requirements (occupant load/occupancy) and ABA compliant.
(40.41)
(49.80)
Table 2-13 Sample Program Space Requirements for Facility Support (New Facilities – Air Force)
Medium Large ft.2
(m2) ft.2
(m2) Kitchen. Includes space for food preparation and dishwashing, as well as cart storage, dry goods storage, coolers and freezers, and work station for cooks.
(113.62)
(113.62)
Janitorial. Includes floor space required for storing janitorial supplies and equipment. Includes a mop sink. Large facilities may have more than one room.
(9.10)
(10.68)
Laundry. Includes area (split into multiple rooms for larger facilities) required for washers and dryers, a sink, and work surface for folding.
(12.63)
(25.27)
Other Facility Support.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .