Attachment 12 - Specifications 18-1083 Replace Exterior Fencing w CDC Requirements.pdf

PDF 422 KB Posted

Attached to
Child Development Center Playgrounds
Solicitation number
FA301027Q0002
Issued by

About this file

This file comprises two interconnected documents: Section 32 31 13 (Chain Link Fence and Gates Specifications) and Section 01 10 10 (Design Requirements for a Child Development Center), which establish comprehensive design and construction criteria for a Child Development Center (CDC) facility replacement, including exterior fencing work.

The Chain Link Fence specification details requirements for polymer-coated steel chain link fabric and galvanized steel framework with swing and cantilever slide gates, referencing ASTM standards for materials, installation, and performance. Fencing must be black or dark green vinyl-coated chain link minimum six feet high with posts facing outward, inverted weaving, and no gaps exceeding 3.5 inches between components. Double-wide gates (minimum 12 feet clear width) for maintenance and emergency vehicle access, plus personnel gates (minimum 44 inches wide) with specific handle heights at 48 inches are required. The broader CDC design document establishes facility-wide requirements including LEED Silver certification mandatory compliance, sustainable design principles per Air Force policy, and adherence to UFC 4-740-14 and applicable building codes. Site work requirements include force protection measures based on "Primary Gathering" classification per UFC 4-010-02, remote-operated barrier gates at multiple access points, paved evacuation gathering points minimum 75 feet from the facility, and comprehensive grading and utility coordination. The contractor must secure geotechnical investigation services, obtain all permits including NPDES and stormwater management, provide radon testing to EPA compliance levels (maximum 4.0 pCi/l), verify lead-based paint and volatile organic compound safety, and coordinate emergency access with Base fire departments. All deviations from specified criteria require approval from HQ USAF/A1SA, and the government will not compensate for expenses exceeding LEED Silver certification levels.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 31 13

CHAIN LINK FENCE AND GATES

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. DIVISION 01 - GENERAL REQUIREMENTS: Drawings, quality, product and performance requirements, general and supplemental conditions apply as applicable to the project and project documents.

1.2 SUMMARY

A. This Section includes industrial/commercial chain link fence and gates specifications:

1. Polymer coated steel chain link fabric

2. Polymer coated galvanized steel framework and fittings

3. Gates: swing and cantilever slide

4. Installation

B. Related Sections:

1. 01 33 23 Shop Drawings, product data

2. 01 43 13 Manufacturers Qualifications

3. 03 30 53 Miscellaneous Cast in Place Concrete

4. 31 22 19 Finish Grading

1.3 REFERENCES

A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

B. ASTM F567 Standard Practice for Installation of Chain Link Fence

C. ASTM F626 Specification for Fence Fittings

D. ASTM F668 Specification for Polymer Coated Chain Link Fence Fabric

E. ASTM F900 Specification for Industrial and Commercial Swing Gates

F. ASTM F934 Specification for Standard Colors for Polymer-Coated Chain Link

G. ASTM F1043 Specification for Strength and Protective Coatings of Steel Industrial Chain Link Fence Framework

H. ASTM F1083 Specification for Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanized) Welded, for Fence Structures

I. ASTM F1184 Specification for Industrial and Commercial Horizontal Slide Gates

J. UL325 Automatic operators: Door, Drapery, Gate, Louver and Window

1.4 SUBMITTALS

A. Shop drawings: Site plan showing layout of fence location with dimensions, location of gates and opening size, cleared area, elevation of fence, gates, footings and details of attachments. Comply with the provisions of Section 01 33 23.

B. Material samples: When required, provide representative samples of chain link fabric, framework and fittings.

C. Specification Changes: May not be made after the date of bid.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

A. Framework, posts, rails, fabric, and fittings for chain link fence system:

1. MERCHANTS METALS®

www.merchantsmetals.com Tech-Info@merchantsmetals.com Phone: (888) 260-1600 Or approved equal.

2.2 CHAIN LINK FABRIC

A. Steel Chain Link Fabric: Heights indicated on drawings. <Select from table below and insert ASTM serial designation, mesh size, wire gauge, coating specification, including class and color when applicable, top/bottom selvage >

1. Polymer Coated Steel Fabric: ASTM F668, wire gauge specified is that of the metallic coated steel core wire.

a. Class 1 extruded

b. Class 2a extruded and adhered

c. Class 2b fused and adhered

d. Color – To be determined by customer.

2. Fabric Selection Table: Steel chain link mesh sizes and gauges produced in one piece widths 3 feet (910 mm) to 12 feet (3660 mm) http://www.merchantsmetals.com/ mailto:Tech-Info@merchantsmetals.com

3. Fabric selvage:

Standard fabric selvage for 2 in (50 mm) mesh 72 in. (1.8 m) high and higher is knuckle finish at one end, twist at the other.

Fabric less than 72 in (1.8 m), knuckle finish top and bottom, K&K. Manufacturing and installation issues dictate all mesh sizes less than 2 in. (50 mm) have a knuckle selvage for both top and bottom, K&K.

2.3 ROUND STEEL PIPE FENCE FRAMEWORK

A. Round steel pipe and rail: Schedule 40 standard weight pipe, in accordance with ASTM F1083, 1.8 oz/ ft² (550 g/m²) hot dip galvanized zinc exterior and 1.8 oz/ft² (550 g/m²) hot dip galvanized zinc interior coating.

High Strength Grade: Minimum yield strength 50,000 psi (344 MPa)

B. Polymer Coated Pipe: Polymer coated pipe shall have a PVC coating fused and adhered to the exterior zinc coating of the galvanized pipe in accordance with ASTM F1043. The minimum thickness of the PVC coating shall be 10-mils (0.254 mm), for polyester 3 mils (0.0076 mm). Color to match fabric per ASTM F934.

Framework Wind Load Caution:

Fences containing windscreens or privacy slats and fences greater than 8 feet (2.4

m) in height using, 1 in. (25 mm) mesh or smaller - recommend a wind load force analysis for post selection and post spacing. See Chain Link Manufactures Institute

– Wind Load Guide CLFMI: WLG 2445. A interactive Wind load Fence Post Calculator is available at www.wheatland.com]

2.3 TENSION WIRE

A. Polymer Coated Steel Tension Wire: 7 gauge core (0.177 in.) (4.50 mm) wire complying with ASTM F1664. Match coating class and color to that of the chain link fabric.

1. Class 1, extruded

2. Class 2a, extruded and adhered

3. Class 2b, fused and adhered

2.4 FITTINGS

A. Tension and Brace Bands: Galvanized pressed steel complying with ASTM F626, minimum steel thickness of 12 gauge (0.105 in.) (2.67 mm), minimum width of 3/4 in. (19 mm) and minimum zinc coating of 1.20 oz/ft² (366 g/m²). Secure bands with 5/16 in. (7.94 mm) galvanized steel carriage bolts.

B. Terminal Post Caps, Line Post Loop Tops, Rail and Brace Ends, Boulevard Clamps, Rail Sleeves: In compliance to ASTM F626, pressed steel galvanized after fabrication having a minimum zinc coating of 1.20 oz/ft² (366 g/m²).

C. Truss Rod Assembly: In compliance with ASTM F626, 3/8 in. (9.53 mm) or 5/16” (7.94 mm) diameter steel truss rod with a pressed steel tightener, minimum zinc coating of 1.2 oz/ft² (366 g/m²), assembly capable of withstanding a tension of 2,000 lbs. (970 kg).

D. Tension Bars: In compliance with ASTM F626. Galvanized steel one-piece length 2 in. (50

mm) less than the fabric height. Minimum zinc coating 1.2 oz. /ft² (366 g/m²).

*[Bars for 2 in. (50 mm) and 1 ¾ in. (44 mm) mesh shall have a minimum cross section of 3/16 in. (4.8 mm) by 3/4 in. (19 mm)] http://www.wheatland.com/

*[Bars for 1 in. (25 mm) mesh shall have a cross section of 1/4 in. (6.4 mm) by 3/8 in. (9.5 mm)] *[Small mesh 3/8 in. (10 mm), 1/2 in. (13 mm) and 5/8 in. (16 mm) shall be attached (sandwiched) to the terminal post using a galvanized steel strap having a minimum cross section of 2 in. (51 mm) by 3/16 in. (4.8 mm) with holes spaced 15 in. (381 mm) on center to accommodate 5/16 in. (7.9 mm) carriage bolts which are to be bolted thru the strap the mesh and thru the terminal post.]

E. Polymer Coated Color Fittings: In compliance with ASTM F626, minimum coating thickness 0.006 in. (0.152 mm) fused and adhered to the zinc coated fittings. Match color to fence system.

2.5 TIE WIRE and HOG RINGS

A. Basic commercial / industrial applications - specify 9 gauge core aluminum alloy ties and hog rings per ASTM F626.

B. Added security or fence containing privacy slats specify 9 gauge core (0.148) (3.76 mm) steel Galvanized Before Weave (GBW) with preformed power fastened wire ties and preformed hog rings having minimum zinc coating 1.20 oz/ft² (366 g/m²) per ASTM F626.

C. Polymer coated, match the coating, class and color to that of the chain link fabric

2.6 SWING GATES

A. Swing Gates: Galvanized steel pipe welded fabrication in compliance with ASTM F900. Gate frame members 1.900 in. OD (48.3 mm). ASTM F 1083 schedule 40 galvanized steel pipe. Frame members spaced no greater than 8 ft. (2440 mm) apart vertically and horizontally. Welded joints protected by applying zinc-rich paint in accordance with ASTM Practice A780. Positive locking gate latch, pressed steel galvanized after fabrication. Galvanized malleable iron or heavy gauge pressed steel post and frame hinges. Provide lockable drop bar and gate holdbacks with double gates. Match gate fabric to that of the fence system. Gateposts per ASTM F1083 schedule 40 galvanized steel pipe. Polymer coated gate frames and gateposts; match the coating type and color to that specified for the fence framework. Moveable parts such as hinges, latches and drop rods may be field coated using a liquid polymer touch up.

2.8 CONCRETE

Concrete for post footings shall have a 28-day compressive strength of 2,500 psi. (17.2 MPa).

PART 3 EXECUTION

3.1 CLEARING FENCE LINE

Clearing: Surveying, clearing, grubbing, grading and removal of debris for the fence line or any required clear areas adjacent to the fence. The contract drawings indicate the extent of the area to be cleared and grubbed.

3.2 FRAMEWORK INSTALLATION

A. Posts: Posts shall be set plumb in concrete footings in accordance with ASTM F567.

Minimum footing depth, 24 in. (609.6 mm) plus an additional 3 in. (76.2 mm) depth for each 1 ft. (305 mm) increase in the fence height over 4 ft. (1220 mm). Minimum footing diameter four times the largest cross section of the post up to a 4.00” (101.6 mm) dimension and three times the largest cross section of post greater than a 4.00” (101.6 mm) dimension.

<Local codes, site soil conditions, local frost depth, fence height and wind load may require larger diameter or deeper footings - See Chain Link Manufactures Institute – Product Guide and Wind Load Guide CLFMI: WLG 2445> Top of concrete footing to be at grade crowned to shed water away from the post or 6 inches (152 mm) below grade crowned to shed water away from the post. Line posts installed at intervals not exceeding 10 ft. (3.05 m) on center.

B. Top rail: When specified, install 21 ft. (6.4 m) lengths of rail continuous thru the line post or barb arm loop top. Splice rail using top rail sleeves minimum 6 in. (152 mm) long. Rail shall be secured to the terminal post by a brace band and rail end. Bottom rail or intermediate rail shall be field cut and secured to the line posts using boulevard clamps or brace band with rail end. Fences 12 feet (3.66 m) high or higher require mid rail.

C. Terminal posts: End, corner, pull and gate posts shall be braced and trussed for fence 6 ft.

(1.8 m) and higher and for fences 5 ft. (1.5 m) in height not having a top rail. The horizontal brace rail and diagonal truss rod shall be installed in accordance with ASTM F567.

D. Tension wire: Shall be installed 4 in. (101.6 mm) up from the bottom of the fabric. Fences without top rail shall have a tension wire installed 4 in. (101.6 mm) down from the top of the fabric. Tension wire to be stretched taut, independently and prior to the fabric, between the terminal posts and secured to the terminal post using a brace band. Secure the tension wire to each line post with a tie wire. Install the top tension wire through the barb arm loop for fences having barbed wire and no top rail.

3.3 CHAIN LINK FABRIC INSTALLATION

Chain Link Fabric: Install fabric to outside or inside (comply with facility’s regulations) of the framework maintaining a ground clearance of no more than 2 inches (50 mm). Attach fabric to the terminal post by threading the tension bar through the fabric; secure the tension bar to the terminal post with tension bands and 5/16 in. (7.94 mm) carriage bolts spaced no greater than 12 inches (304.8mm) on center. Small mesh fabric less than 1 in. (25 mm), attach to terminal post by sandwiching the mesh between the post and a vertical 2 in. wide (50mm) by 3/16 in. (4.76 mm) galvanized steel strap using carriage bolts, bolted thru the bar, mesh and post spaced 15 in. (381 mm) on center. Chain link fabric to be stretched taut free of sag. Fabric to be secured to the line post with tie wires spaced no greater than 12 inches (304.8 mm) on center and to horizontal rail spaced no greater than18 inches (457.2

mm) on center. Secure the fabric to the tension wire by crimping hogs rings around a fabric wire picket and tension wire.

3.4 GATE INSTALLATION

A. Swing Gates: Installation of swing gates and gateposts in compliance with ASTM F 567.

Direction of swing shall be inward or outward (See drawings for specifics). Gates shall be plumb in the closed position having a bottom clearance of 3 in. (76 mm), grade permitting.

Hinge and latch offset opening space shall be no greater than 3 in. (76 mm) in the closed position. Double gate drop bar receivers shall be set in a concrete footing minimum 6 in.

(152 mm) diameter 24 in. (609.6 mm) deep. Gate leaf holdbacks shall be installed for all double gates.

3.4 NUTS AND BOLTS

Bolts: Carriage bolts used for fittings shall be installed with the head on the secure side of the fence. All bolts shall be peened over to prevent removal of the nut.

3.5 ELECTRICAL GROUNDING

Grounding: Grounding of the fence and gates is not the responsibility of the fence contractor and not included in the fencing scope of work for this contract. Grounding, when required, shall be specified and included in Contract Section 33 79 00 Site Grounding. A licensed electrical contractor shall install grounding when required.

3.5 CLEAN UP

Clean Up: The area of the fence line shall be left neat and free of any debris caused by the installation of the fence.

END OF SECTION 32 31 13

SECTION 01 10 10

06/25/12

SECTION 01 10 10

DESIGN REQUIREMENTS FOR A CHILD DEVELOPMENT CENTER (CDC)

TABLE OF CONTENTS

Design Requirements

1. General

2. Design Requirements

3. Sustainable Design

4. Geotechnical and Foundations

5. Sitework

6. Utilities

7. Landscape and Irrigation

8. Architectural

9. Structural and Comprehensive Interior Design Requirements

10. Structural Design

11. HVAC

12. Plumbing

13. Fire Suppression

14. Electrical Systems

15. Electronic Systems

16. Fire Detection and Alarm System

17. Corrosion Control and Cathodic Protection

18. Food Service Design

19. Outdoor Play Environment

20. Room Data Sheets

21. Fire Protection/Prevention Inspection Guide

22. Equipment Matrix

DESIGN REQUIREMENTS FOR CHILD DEVELOPMENT CENTER (CDC)

1. GENERAL

1.1 DOCUMENT INTENT

Section 01 10 10 supplements and modifies the Unified Facilities Criteria for Child Development Centers (UFC 4-740-14) and the drawings contained herein.

This section was developed to provide typical conditions for large size Air Force Child Development Centers at any location, but applies to facilities of any size and/or addition. In cases where this section is applied to facilities of lesser size, any code requirement based on total building occupancy shall be adjusted to reflect the actual size of the facilities as shown in the drawings that are also part of this Request for Proposal.

Note that Section 01 10 10 and UFC 4-740-14 contain certain requirements that exceed codes and that these requirement changes have been approved by the appropriate government agencies overseeing Child Development Center operations and construction. Section 01 10 10 also includes other specifications intended to produce Child Development Centers that meet the Government's needs and requirements for a complete and usable facility.

Appendix A (Installation Specific Design/Construction Criteria) provides additional Base-specific requirements that further modify, define and develop those typical criteria included in section 01 10 10 for the local base conditions.

If there is a question on the specifications, prototype design drawings, and requirements presented in this Request for Proposal, the contractor is required to request written clarification and direction from the contracting officer. The government does not seek nor does it encourage deviations from the criteria specified in this Request for Proposal. Deviations and changes to the Section 01 10 10 and the Appendix A will require approval from multiple level governmental agencies up to, and including, the highest Air Force level. This process can be lengthy.

All three documents (UFC-4-740-14, Section 01 10 10, and the Appendix A) should be read and followed carefully as all three documents contain design requirements that contribute to a successful design.

1.2 PROJECT DESCRIPTION

This project is for design and construction of a single story Child Development Center in accordance with UFC 4-740-14; Design: Child Development Centers, and the requirements of this document. Square footages are indicated on the Base specific drawings. The contractor is responsible for final design and obtaining all permits in accordance with this document and all applicable building codes. This project shall allow fast track construction.

Construction shall not commence on any part of the work until after completion and approval of specific design elements in accordance with section 01 10 12; Design after Award. Reviews by the Government are not to be interpreted as an approval of the Contractor's apparent progress toward meeting the contract requirements but are intended to discover any information which can be brought to the Contractor's attention which might prevent costly errors and omissions. The Contractor shall remain completely responsible for all deliverables in full compliance with the requirements of this contract. If the Contractor elects to do fast track construction, approval for any part on the design by the government does not constitute overall project design approval. The contractor shall be responsible for all conflicts that arise from coordination of design and construction. This project shall be designed and constructed in accordance with sustainable design principles outlined by the LEED process. The contractor shall obtain a LEED Silver level of certification through USGBC and provide the government with a copy of all documents submitted to USGBC

2. DESIGN REQUIREMENTS

2.1 GENERAL

The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared include, but are not limited to construction drawings, specifications, submittals, and design analysis as required in Section 01 10 12 Design after Award. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with the Design Criteria. Base specific criteria will be provided in the Appendix A. Submittals shall be provided as hard copy and electronic/digital.

2.2 DESIGN

The project shall be designed in accordance with the RFP using sustainable design principles and efficient practices. The design of the building and the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based.

The Contractor’s Architect shall work with Base’s Architect to define and specify the exterior aesthetic. This includes but is not limited to the selection of the exterior finishes and textures, the incorporation of additional windows either on the exterior or as clerestories, the slope of the roof and the entry walkway. The first appearance of this facility from the parking lot to the entry is extremely important and the Contractor needs to ensure that aesthetic is well designed. The Contractor is also responsible for assisting the Base Architect in providing sketches and perspectives in order to get the necessary approvals to proceed with the design and construction of the facility.

If Appendix A is referenced in the Section 01 10 10 but no information is provided in the Appendix the Contractor can assume that no further information shall be provided.

2.3 SPECIFICATION INTENT

The intent of this specification section is to further describe the performance requirements for appearance, function, materials, quality, and types of construction to enable engineering, design, and construction to be completed by the Contractor. In this specification section, design requirements are provided for each element of the work which outlines the parameters and design to which the Contractor shall design. In addition, the UFGS specifications referenced throughout this section shall be used as the basis for quality, materials, and construction and form part of the contract.

2.4 COORDINATION BETWEEN THE VARIOUS DISCIPLINES

The Contractor shall be responsible for the coordination between disciplines in order to fulfill the requirements of this contract and to provide for a complete, integrated, and functional design.

2.5 QUALITY OF WORK

Construction documents shall be of sufficient detail to afford a clear understanding of the construction work required. The work shall be organized in a manner that will assure thorough coordination between the various details on the drawings and the specifications. The Contractor shall crosscheck all work until all conflicts have been reconciled. The design shall comply with the base specific General Design Guidelines and Architectural Compatibility Guidelines; see Appendix A for further detail.

2.6 RFP DESIGN AND TECHNICAL CRITERIA

Design and construction shall comply with UFC 4-740-14, as modified by this RFP’s Specification Section 01-10-10; the drawings; appendices and requirements contained in this Request for Proposals (RFP). The design and technical criteria contained and cited in this RFP establish minimum standards for design and construction quality. The objective of this solicitation is to obtain functional, fully operational and sustainable facilities that conform to the basic dimensions and configurations presented in the RFP. The drawings provided within this RFP represent the functional and organizational space arrangement requirements of the funding agency and building Users. Any proposed modification(s) to the RFP floor and site plans are strictly limited to accommodate actual design and construction conditions. No deviations from the criteria will be allowed without approval by the United States Air Force’s Chief of Airman and Family Services Division (HQ USAF/A1SA). If a deviation is sought (either by Contractor or Installation), contractor must submit written deviation request to the Contracting Officer's Representative, Who will forward it to the appropriate channels and HQ/USAF/A1SA for approval or disapproval. Requests for deviations from the criteria cannot be approved by any USAF Base-level Civil Engineering Squadron (CES) or Force Support Squadron (FSS) personnel.

Requests for deviations from the criteria cannot be approved by any USAF Major Command (MAJCOM) personnel. Requests for deviations from the criteria cannot be approved by the USAF’s HQ AFCEE or HQ AFSVA. Requests for deviations from the criteria cannot be approve by the United States Army Corps of Engineers (USACE) or Naval Facilities Engineering Command (NAVFAC).

All questions or problems encountered by the Contractor in following criteria shall be promptly submitted with recommendations to the Contracting Officer's Representative for approval by HQ USAF/A1SA.

This RFP’s primary governing document is Section 01 10 10 and shall govern in case of conflicts. Section 01 10 10 is intended to modify and update some criteria within UFC 4-740-14. However, in the case of any conflicts that may arise between the RFP’s Section 01 10 10, Appendix A, the prototype design drawings and/or UFC 4-740-14, the contractor shall contact the Contracting Officer for guidance. These CDC spaces have been designed and approved through the RFP process and shall not be deviated from. The Contractor is responsible for bringing these conflicts to the attention of the Contracting Officer's Representative for approval. Refer to paragraph 1.1 for further information.

A preliminary code research has been performed as part of the creation of these documents. The Contractor will be responsible to perform a full code research for the project and design and construct a facility in compliance with applicable codes. The preliminary code review and life safety analysis that occurred during the preparation of the RFP were cursory reviews to check on overall design issues. The government does not believe the RFP documents present inherent building code or life safety problems. The Contractor has final design responsibility and shall be responsible for building code and life safety compliance, regulatory compliance, and RFP criteria compliance

Architectural detail, materials and finishes are paramount to the success of this project. Exterior materials and finishes shall be compatible with other existing facilities on the base. All efforts have been made to specify compatible products and construction materials.

Contractor is responsible to perform RADON testing of the entire facility footprint and provide the government with a report of findings. All testing shall be conducted in accordance with U.S. EPA protocols by a certified RADON testing professional. Radon measurement shall not exceed the U.S. EPA Compliance level of 4.0 pCi/l. If the level of Radon is above the compliance level, the government will issue a contract change to design and install a system to mitigate the Radon to ensure the radon level in the completed facility does not exceed the compliance level. If mitigating is required, the contractor shall be required to conduct follow up testing of the completed facility, under closed building conditions, to ensure the facility is within EPA compliance guidelines. The contractor shall be responsible for any further mitigation efforts at no cost to the government should the follow up testing not be within EPA compliance guidelines.

The Contractor is responsible for providing documentation verifying that children are not exposed to lead-based paint, volatile organic compounds, heavy metals in the drinking water and molds. Areas that have been recently painted, carpeted, tiled, or otherwise renovated shall be well ventilated before they are used by children.

2.6.1 Section 01 10 10 DESIGN REQUIREMENTS: Specification Section 01 10 10 DESIGN REQUIREMENTS defines the design and performance criteria. The applicable building codes and standards shall be used as the minimum criteria to develop the construction documents for areas of work not specifically defined.

2.6.2 Section 01 10 12 DESIGN AFTER AWARD: Specification Section 01 10 12 DESIGN AFTER AWARD defines the format and submittal requirements in which the design and the construction documents shall be prepared by the Contractor.

2.6.3 Technical Specifications: The contractor shall develop the technical specifications from the Unified Facilities Guide Specification (UFGS) System, Divisions 2 through 48. For the areas of work in which the UFGS specifications have not been provided, the Contractor shall develop these specifications as required. Technical specifications required for this project are listed herein for each element of the work. However, this listing is not limited to the other specifications that may be required for all elements of the work.

2.7 DESIGN CODES, STANDARDS AND CRITERIA

The design shall comply with the base specific General Design Guidelines and the base’s Architectural Compatibility Guidelines. In cases of conflict refer to paragraph 1.1 for order of governance.

In addition to the specific codes, standards and criteria referenced throughout this RFP, the Contractor shall prepare design and construction documents for all elements of the project in accordance with UFC 4-740-14 and the following codes using the most current editions. Where conflict between RFP and building codes or there is a conflict between codes, UFC 3-600-01 shall apply. This list is not intended to be a complete list. All work shall be designed and constructed to meet all applicable codes, standards and laws. Reference other sections of this RFP and the UFGS specifications referenced for use for other standards and references not listed below.

ABA Architectural Barriers Act AFDS Air Force Design Guide, current edition ANSI American National Standards Institute Standards ASCE American Society of Civil Engineers, Minimum Design Loads for

Buildings and Other Structures, Latest edition.

ASHRAE American Society of Heating, Refrigeration and Air Conditioning

Engineers ASTM American Society for Testing and Materials DCID Director of Central Intelligence Directive 6/9, Physical

Security Standards for Sensitive Compartmented Information Facilities

EIA Electronic Industries Association EISA Energy Independence and Security Act ETL Engineering Technical Letters IBC International Building Code IEEE Institute of Electrical and Electronics Engineers

IES Illuminating Engineering Society Lighting Handbook IMC International Mechanical Code IPC International Plumbing Code MILHDBK Military Handbooks NEC National Electrical Code, current edition NEMA National Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association Codes and Standards, most current edition SMACNA Sheetmetal & Air Conditioning Contractors National Association TI’s Technical Instructions TM’s Technical manuals UFC Unified Facilities Criteria UL Underwriter's Laboratories

The Contractor shall also follow all current national and state codes, regulations and specifications involving civil, architectural, interior design, structural, mechanical, electrical, and environmental disciplines which are applicable to the engineering design and construction industry, including OSHA Safety and Health Standards and Air Force policy on Ozone Depleting Chemicals (ODC’s).

Use the most current versions of the National Fire Codes and Life Safety Codes published by the National Fire Protection Association (NFPA) with the incorporation of the Department of Defense permanent compensatory measures to exceed the staff to child ratios outlined in the most current version of the AFCESA Fire Inspection Guide for Child Development Centers, the International Building Code (IBC) and the Architectural Barriers Act (ABA) is mandatory. In case of conflict between code requirements, the most stringent criteria shall apply.

2.8 DESIGN UNITS

The design shall be developed using English units.

2.9 ACRONYMS AND ABBREVIATIONS

AASHTO American Association of Highway and Transportation Officials ABA Architectural Barriers Act ACI American Concrete Institute A-E Architect-Engineer A/E/C Architect/Engineer/Contractor AF Air Force AFF Above Finish Floor AF&PA American Forest and Paper Association AFI Air Force Instruction

AFM

AFCEE

AFCESA

AFSVA

Air Force Manual Air Force Center for Engineering and the Environment Air Force Civil Engineering Support Agency Air Force Services Agency

AHU Air Handling Unit AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute API American Petroleum Institute AR Army Regulation ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigeration, and Air

Conditioning Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AT/FP Anti-terrorism/Force Protection AWS American Welding Society BCE Base Civil Engineer BICSI Building Industry Consulting Service International BIM Building Information Modeling BMP Best Management Plan BRAC Base Realignment and Closure C Centigrade CADD Computer Assisted Design and Drafting CATV Cable Television CCB Construction Criteria Base

CCTV

CDC

Closed Circuit Television Security Child Development Center

Cfm cubic feet per minute CFR Code of Federal Regulations cfs cubic feet per second cm Centimeter c.m. corrugated metal CMAA Crane Manufacturers Association of America CMU Concrete Masonry Unit COM Customer’s Own Material COR Contracting Officer’s Representative CoS Center/s of Standardization CP Cathodic Protection CSV Comma-Separated-Values CWE Current Working Estimate D-B Design-Build D-B-B Design-Bid-Build DD Department of Defense DDC Direct Digital Controls DM Design Manual DOD Department of Defense DPW Directorate of Public Works DX Direct Expansion EIA Electronic Industries Alliance EISA Energy Independence and Security Act EC Engineering Circular EM Engineering Manual EMCS Energy Management and Control System EMI Electromagnetic Interference EN-DA Architectural/Structural/Civil Engineering Section, Mobile

District

EN-DW Project Support Section, Mobile District ENG Engineer Form designation EN-GG Geotechnical and Dam Safety Section, Mobile District EPA Environmental Protection Agency ER Engineering Regulations ETL Engineering Technical Letter F Fahrenheit FAR Federal Acquisition Regulation FFE Furniture, Fixtures and Equipment FPP Furniture Placement Plan fps feet per second FSC Federal Supply Class FSN Federal Standard Number FSS Federal Supply Schedules FY Fiscal Year GD Geographic District gpm gallons per minute HAG Historical Analysis Generator HAP Hourly Analysis Program HTW Hazardous and Toxic Waste HVAC Heating, Ventilating and Air Conditioning IBC International Building Code ICC International Code Council IEEE Institute of Electrical and Electronics Engineers IES Illumination Engineering Society IFGC International Fuel Gas Code I-H In-house IMC International Mechanical Code IMCOM Installation Management Command IOF Illustrated Order Form IPC International Plumbing Code IPCEA Insulated Power Cable Engineer’s Association IRC International Residential Code IRP Installation Restoration Program ISA Instrument Society of America JOC Job Order Contract LAN Local Area Network LEED Leadership in Energy and Environmental Design MAJCOM Major Command MBMA Metal Building Manufacturers Association MCA Military Construction Army MCASES Micro Computer-Aided Cost Estimating System MCP Military Construction Program MILCON Military Construction MIL-HDBK Military Handbook MO Maximum Order MS Microsoft MT MILCON Transformation MWPCA Massachusetts Water Pollution Control Association NACE National Association of Corrosion Engineers NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association NOR Notice of Registration

NPDES National Pollutant Discharge Elimination System O&M Operation and Maintenance OMA Operation and Maintenance Army PACES Parametric Cost Engineering System PAE Project Architect-Engineer PCASE Pavement-Transportation Computer Assisted Structural

Engineering PCI Precast/Prestressed Concrete Institute PDF Portable Document Format PIV Post Indicator Valve PM Project Manager PPTO Price Performance Trade Off psi pounds per square inch PVC Polyvinyl Chloride PVD Power, Voice and Data QCP Quality Control Plan, Qualified Credentialed Professional RA Requirements Analysis RFP Request for Proposal RFQ Request for Quote RTA Ready-To-Advertise SABER Simplified Acquisition of Base Engineering Requirements SDI Steel Deck Institute SID Structural Interior Design SIOH Supervision, Inspection and Overhead SGML Standard Generalized Markup Language SMACNA Sheet Metal and Air Conditioning Contractors’ National

Association SOW Statement of Work TIA Telecommunication Industry Association TI Technical Instruction TL Technical Letter TM Technical Manual TRACE Trane Air Conditioning Economics UFC Unified Facilities Criteria UG Underground UL Underwriter’s Laboratory UMCS Utility Monitor and Control Systems USDOT United States Department of Transportation UFGS Unified Facility Guide Specification

USACE

USGBC

U.S. Army Corps of Engineers United States Green Building Council

VAV Variable Air Volume WAN Wide Area Network

2.10 CODES AND REFERENCES

The Contractor shall use the most current code and/or reference published.

ACGIH-2092M, AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH),

Industrial Ventilation: A Manual of Recommended Practice (Metric)

ACGIH-2092S, AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH),

Industrial Ventilation: A Manual of Recommended Practice

ACI 117-06 – Specifications for Tolerances for Concrete Construction and Materials

ACI 302.1R-04 – Guide for Concrete Floor and Slab Construction

ACI 318-08 – Building Code Requirements for Structural Concrete

ACI 530-08 – Building Code Requirements for Masonry Structures

AF CDC Criteria

AF Policy CDC/School-Age (SA)/ Youth Programs (YP) Drinking Water

AFCESA Inspection Guide for AF Child Development Facilities

AFI 31-101, Physical Security Program

AFI 32-1068 – Heating Systems and Unfired Pressure Vessels

AFI 32-1084, Standard Facilities Requirements Handbook

AFI 48-144 Safe Drinking Water Surveillance Program

Air Force Base Architectural Compatibility Plan (ACP)

Air Force Base General Plan

Air Force Sustainable Design and Development Policy memo dated 31 July 2007

Air Force Instruction 34-248, Child Development Centers

AISC 325-05 – Steel Construction Manual, 13th Edition

AISC 327-05 – Seismic Design Manual

AISI – Cold Formed Steel Design Manual

American National Standards Institute (ANSI) B16.5, Pipe Flanges and Flanged Fittings

American Standard for Nursery Stock, ANSI 260.1

ANSI Z358.1– American National Standard for Emergency Eyewash and Shower Equipment

ABA - Architectural Barriers Act (ABA)

ASCE 7-05 – Minimum Design Loads for Buildings and Other Structures

ASHRAE Handbooks – Latest Edition

ASHRAE Standard 62.1– Ventilation for Acceptable Indoor Air Quality

ASHRAE Standard 90.1– Energy Standard

ASHRAE Guideline 0

ASME B 31.8, Gas Transmission and Distribution Piping Systems

ASTM A 123, Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 167, Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A 240, Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels for General Applications

ASTM A 269, Seamless and Welded Austenitic Stainless Steel Tubing for General Service

ASTM A 36/A 36M, Carbon Structural Steel

ASTM B 32, Solder Metal

ASTM D 520, Zinc Dust Pigment

ASTM D 2513, Thermoplastic Gas Pressure Piping Systems

ASTM D 2683, Socket-Type Polyethylene Fittings for Outside Diameter-Controlled Polyethylene Pipe and Tubing

ASTM F 1951, Determination of Accessibility of Surface Systems Under and Around Playground Equipment

ASTM F 1292, Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment

ASTM F 1487, Playground Equipment for Public Use

ASTM F 2049, Fences/Barriers for Public, Commercial, and Multi-Family Residential Use Outdoor Play Areas

ASTM F 2075, Engineered Wood Fiber for Use as a Playground Safety Surface Under and Around Playground Equipment

ASTM F 2373, Public Use Playground Equipment for Children 6 Months through 23 Months

ASTM Standards – American Society of Testing and Materials

AWS – Structural Welding Codes

AWS A5.8/A5.8M, AMERICAN WELDING SOCIETY (AWS), Filler Metals for Brazing and Braze Welding

AWWA – American Water Works Association standards

Base Manuals; see Appendix A for further detail

Caring for Our Children: National Health and Safety Performance Standards:

Guidelines for Out-of-Home Child Care, 2nd Edition

CSA Directory, CSA INTERNATIONAL, (updated continuously online) Certified Products Listings

CSPC 325, Consumer Product Safety Commission Public Playground Safety Handbook

Department of Defense Instruction Number 6060.2, Child Development Programs

District Design Manual; see Appendix A for further detail

EISA Section 438, Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects

ETL 04-3 – Design Criteria for Prevention of Mold in Air Force Facilities

ETL 83-1 Design of Control Systems for HVAC

EPACT 05 Energy Policy Act 2005

FC 3-600-01: Fire Protection Engineering for Facilities

FM Data sheet 2-8N – Installation of Sprinkler Systems

Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings

IBC – International Building Code, most current edition, as modified by UFC 1- 200-01.

IMC – International Mechanical Code.

IPC – International Plumbing Code

Lead Contamination Control Act of 1988 (Pub. L. 100–572, § 1, Oct. 31, 1988, 102 Stat. 2884)

Lead and Copper Rule (40 CFR 141 Subpart E)

Manual on Uniform Traffic Control Devices

MIL-HDBK 1013, Facilities Engineering Design and Construction

MIL-HDBK-1190, Facility Design Manual

MSS SP 69 – Manufacturers Standardization Society of the Valve and Fittings Industry Inc. – Pipe Hangers and Supports – Selection and Application

MSS SP-110, MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS), Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends

MSS SP-72, MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS) Ball Valves with Flanged or Butt-Welding Ends for General Service

NAEYC Early Childhood Program Standards and Accreditation Criteria

National Electrical Code

National Pollutant Discharge Elimination System (NPDES) for Construction Activities

“Natural Playscapes” by Rusty Keeler

NEMA 250, Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA ICS 6, Industrial Control and Systems: Enclosures

NEMA LD 3, High-Pressure Decorative Laminates

NFPA 10, Standard for Portable Fire Extinguishers, most current edition

NFPA 101 – National Fire Protection Association 101, Life Safety Code, most current edition

NFPA 13 – Standard for the Installation of Sprinkler Systems

NFPA 14 – Hose Systems

NFPA 220, Standard on Types of Building Construction, most current edition

NFPA 54 – Natural Gas Fuel Code

NFPA 70 - National Electrical Code

NFPA 70E – Standard for Electrical Safety in the Workplace

NFPA 72, National Fire Alarm Code

NFPA 720, Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment

NFPA 88A, Standard for Parking Structures

NFPA 90A – Installation of Air Conditioning and Ventilating Systems

NFPA 90B – Installation of Warm Air Heating and Air

NFPA 96, Ventilation Control and Fire Protection of Commercial Cooking Operations

NSF 2, Food Equipment

NSF 35, High Pressure Decorative Laminates for Surfacing Food Service Equipment

NSF 7, Commercial Refrigerators and Freezers

NSF Product Listing, NSF Product Listings of Food Equipment and Related Products, Components, and Materials

PDC-TR 06-08 – Single Degree of Freedom Structural Response Limits for Antiterrorism Design

SDI Diaphragm Mnl – Diaphragm Design Manual

SDI Pub No 29 – Design Manual for Composite Decks, Form Decks, Roof Decks, and Cellular Metal Floor Deck with Electrical Distribution

SJI – Steel Joist Institute, Standard Specifications and Load Tables

SMACNA Guidelines – Sheet Metal and Air-conditioning Contractors' National Association

SMACNA HVAC Duct Const Stds, HVAC Duct Construction Standards - Metal and Flexible

State Department of Transportation Standards

The National Association for the Education of Young Children (NAEYC) Early Childhood Program Standards and Accreditation Criteria

TI 800-01, Child Development Centers

TM 5-813-1/AFM 88-10 Vol. 1, Water Supply Sources and General Considerations

TM 5-822-2/AFM 88-7 Chapter 5 General Provisions and Geometric Design for Roads, Streets, Walks, and Open Storage Areas

UFC 1-200-01 – General Building Requirements

UFC 3-110, Design: Architectural

UFC 3-110-03 Roofing

UFC 3-120-10 Interior Design

UFC 3-210-01A, Area Planning, Site Planning, and Design

UFC 3-210-05FA, Landscape Design and Planning Criteria

UFC 3-210-06A, Site Planning and Design

UFC 3-210-10, Low Impact Development

UFC 3-230-03A Water Supply

UFC 3-230-10A, Water Supply: Water Distribution

UFC 3-230-17FA, Drainage in Areas Other than Airfields

UFC 3-240-04A, Wastewater Collection

UFC 3-240-06A Wastewater Collection and Pumping

UFC 3-240-07FA, Sanitary and Industrial Wastewater Collection: Gravity Sewers and Appurtenances

UFC 3-240-08FA Sanitary and Industrial Wastewater Collection: Pumping Stations and Force Mains

UFC 3-250-01FA, Design: Pavement Design for Roads, Streets, Walks and Open Storage Areas

UFC 3-250-04FA, Design Standard Practice for Concrete Pavements

UFC 3-250-08FA, Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements

UFC 3-301-01 Structural Engineering

UFC 3-310-04 Seismic Design for Buildings

UFC 3-350-01 Design: Interior, Exterior Lighting and Controls

UFC 3-400-01 – Design: Energy Conservation

UFC 3-400-02 – Engineering Weather Data

UFC 3-410-01FA – Design: Heating, Ventilating, and Air Conditioning

UFC 3-410-02FA – Design: Heating, Ventilating and Air Conditioning (HVAC) Control System

UFC 3-410-02A Change 1 – 2007 Heating, Ventilating, and Air Conditioning (HVAC) Controls System

UFC 3-420-01FA – Design: Plumbing Systems

UFC 3-430-05FA – Design: Gas Distribution

UFC 3-520-01 Interior Electrical Systems

UFC 3-530-01 Design: Interior and Exterior Lighting and Controls

UFC 3-550-03FA Electrical Power Supply and Distribution

UFC 3-560-01 Electrical Safety

UFC 3-570-02A Cathodic Protection

UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design

UFC 3-600-01 – Design: Fire Protection Engineering for Facilities General Design Requirements

UFC 4-010-01 – DoD Minimum Antiterrorism Standards for Buildings

UFC 4-010-02 – DoD Minimum Antiterrorism Standoff Distances for Buildings

(FOUO)

UFC 4-010-02, DoD Minimum Antiterrorism Standards for Buildings

UFC 4-021-01 Mass Notification Systems

UFC 4-030-01, Sustainable Development

UFC 4-740-14 Unified Facilities Criteria for Child Development Centers

UL 1046, Grease Filters for Exhaust Ducts

UL 197, Commercial Electric Cooking Appliances

UL 207, Refrigerant-Containing Components and Accessories, Nonelectrical

UL 471, Commercial Refrigerators and Freezers

UL 489, Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures

UL 710, Exhaust Hoods for Commercial Cooking Equipment

UL Elec Equip Dir, Electrical Appliance and Utilization Equipment Directory

Uniform Federal Accessibility Standards, FED-STD-795

USGBC – United States Green Building Council – LEED requirements

USDA – Child and Adult Care Food Program Guidelines

3. SUSTAINABLE DESIGN

The Contractor shall design and construct this facility to meet the United States Green Building Council (USGBC) LEED (Leadership in Energy and Environmental Design) rating of Silver certification for New Construction per the current accepted USGBC rating system. Contractor shall be responsible for obtaining a LEED Silver certification through USGBC.

The Contractor shall be responsible for leading and coordinating the process of registering and obtaining certification of the project with USGBC. This includes but is not limited to the completion of all letter templates and required documentation, as well as the submission for certification with USGBC. The Contractor shall determine the credits and points which will be the best approach to achieve the LEED Silver certification. The Contractor shall have a LEED Accredited Professional on their team to lead, manage and coordinate all of the LEED activities. Contractor shall comply with Air Force Sustainable Design and Development Policy memo dated 31 July 2007, Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings, Executive Order 13423 and Energy Policy Act 2005.

Per Engineering and Construction Bulletin No. 2012-14 dated 23 April 2012, in accordance with the National Defense Appropriations Act of 2012 Section 2830, the Government will not compensate the contractor for any expense expended with the express intent to obtain LEED certification above the Silver level. It is recognized that competitive best value proposal details and requirements cited elsewhere in this document and supporting documents may provide for features which allow for a certification higher than Silver to be obtained. Whether to achieve a future marketing advantage or for other purposes, a contractor may obtain LEED Gold or Platinum certification provided that achieving such certification imposes no additional cost on the Government. The Government’s evaluation of contractor proposals will not consider any offeror’s statement of intent to achieve or otherwise provide a certification higher than Silver.

4. GEOTECHNICAL AND FOUNDATIONS

4.1 GENERAL DESIGN REQUIREMENTS

The Geotechnical support for design documentation shall be written in either English or metric units, consistent with the RFP requirements for the overall project design.

The RFP geotechnical design requirements contained in the following “Geotechnical and Foundations” paragraphs and in the provided Appendix A represent minimum requirements to be used for preparing project design and construction documents.

4.1.1 Conflicts: Where conflict occurs between project-specific Appendix A requirements and the requirements contained herein-below, the Appendix A requirements shall govern. The more stringent/conservative of the RFP geotechnical design requirements, the AFB Facility Design Standard where applicable, the Contractor’s Final Geotechnical Report recommendations, or the applicable Unified Facility Guide Specification (UFGS) Section requirements and notes, as approved by the Contracting Officer, shall govern when preparing the final construction drawings and specifications. Legible copies of the completed exploration logs and summarized laboratory test results, and a map showing locations of all explorations, shall be included with the final construction documents.

4.1.2 Geotechnical Engineering Firm: The Contractor shall secure the services of a competent and reputable Geotechnical Engineering consulting firm to provide the geotechnical basis of design for foundations, pavements, retaining walls, utility earthwork, grading, and all other geotechnical related items. The Geotechnical Engineering Firm shall be familiar with seismic, geologic and geotechnical conditions, hazards and issues in the geographic region where the project is located. The Geotechnical Engineering Firm shall have at least five (5) years of experience in the region. All geotechnical engineering work products (Report, specifications, details, etc) shall be reviewed and approved by a Senior Civil or Geotechnical Engineer.

Approving engineers shall affix their stamp indicating professional registration in the State where the Base is located. Lastly, the firm shall provide all necessary engineering support during construction.

4.2 EARTHWORK

Material shall be classified in accordance with ASTM D 2488 (visual/manual only) and/or ASTM D 2487 (laboratory), and compaction efforts shall be specified by ASTM standards referenced in the applicable UFGS Section. ASTM D1557 (Modified Proctor) shall be specified for all design and construction compaction testing; ASTM D698 (Standard Proctor) will not be allowed for determining the laboratory moisture-density relationships. Fill and backfill for buildings, utilities, and paved areas shall be placed in maximum 8-inch loose lifts when compacted with heavy rollers, and in maximum 4-inch loose lifts when compacted with hand-operated equipment.