Attachment 15 - CDC Playground SOW.pdf

PDF 323 KB Posted

Download PDF, 323 KB

Attached to
Child Development Center Playgrounds
Solicitation number
FA301027Q0002
Issued by

About this file

This is a Statement of Work (SOW) for design and construction of playgrounds at Keesler Air Force Base Child Development Center and School Age Care/Youth Programs facilities in Biloxi, Mississippi.

The project uses a design-build framework with a base bid and four optional bid items (OBIs). The base bid includes 100% design services (120 calendar days) and core preschool playground construction (60 calendar days), totaling 180 calendar days. Optional items include Infant Playground (45 days), Pretoddler Playground (45 days), Toddler Playground (45 days), and School-Age Care/Youth Programs Playground with basketball court (75 days). The contractor must perform site and topographical surveys, design all playgrounds in compliance with Department of Air Force standards, Consumer Product Safety Commission guidelines, ASTM standards, and accessibility requirements. Design deliverables include 50%, 95%, and 100% submittals with hard copies (half-size sets), PDF files, and AutoCAD *.dwg format files distributed to Keesler AFB Civil Engineering Squadron, Force Support Squadron, and Air Force Services Center. Construction requirements include concrete sidewalks and pads with 2% drainage slope, accessibility-compliant evacuation routes, fencing with bollard protection, maintenance and personnel gates, Pebbleflex or similar impact surfacing meeting CPSC standards, wooden storage sheds, landscaping with Geo Zoysia sod, and installation of government-furnished playground equipment. The contractor must obtain all required permits including storm water management and NPDES permits, develop a Storm Water Pollution Prevention Plan, provide erosion and sediment control, and ensure utilities are properly marked and coordinated. The contractor must have minimum five years' playground construction experience and three years' playground maintenance experience. Working hours are 7:00 AM to 5:00 PM excluding weekends and federal holidays. The government will furnish playground equipment, musical equipment, and reasonable utilities; the contractor provides all other materials, labor, tools, and equipment.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEESLER AIR FORCE BASE

CHILD AND YOUTH PROGRAMS (CYP) PLAYGROUNDS

STATEMENT OF WORK (SOW)

October 30, 2026

1 Description of Services

This Statement of Work (SOW) defines the actions for the exterior work at the Keesler Air Force Base (AFB) Child Development Center (CDC) and School Age Care/Youth Programs (SAC/YP).

• Keesler AFB CDC - 604 J St, Keesler AFB, MS 39534

• Keesler AFB SAC/YP – 603 J St, Keesler AFB, MS 39534

The purpose of this SOW is to design build a CDC Infant Playground, a CDC Pretoddler Playground, a CDC Toddler Playground, an accessible CDC Preschool Playground, an accessible SAC Playground with basketball court, outdoor storage at both locations (CDC and SAC), an ensuring evacuation paths and pads are available and comply with the standards below at both locations. The Contractor shall be responsible for all conflicts that arise from coordination of design and construction. The contractor shall submit a request for information (RFI) when there is a conflict between this SOW and criteria/ standards.

The contractor shall adhere to all applicable criteria as specified below.

NOTE: The below list is not in order of precedence.

• Keesler AFB Architectural Compatibility Guide Standards

• FC 4-740-14F, Child Development Programs

• UFC-4-740-06, Youth Centers

• Department of the Air Force Instruction (DAFI) 34-144, Child and Youth Programs

• The Consumer Product Safety Commission (CPSC) (http://cpsc.gov/) Handbook for

Public Playground Safety

• ASTM F1292, Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment

• ASTM F1487, Standard Consumer Safety Performance Specification for Playground

Equipment for Public Use

• ASTM F1951, Standard Specification for Determination of Accessibility of Surface

Systems Under and Around Playground Equipment

• AFCEC Fire Inspection Guide for Child Development and School Age

• Check for additional Keesler project criteria

2 Scope of Work

The Contractor shall provide all management, labor, tools, equipment, materials, transportation, supervision, and other necessary services to design and construct playgrounds at the Keesler AFB Child Development Center (CDC) and Youth Center (SAC/YP), to include all associated Optional Bid Items (OBIs) as defined herein.

The project shall be executed utilizing a design-build framework, structured with core requirements and scalable OBIs to optimize execution within available funding thresholds.

All work and deliverables shall be completed in strict accordance with this Statement of Work (SOW) and shall comply with all applicable Department of the Air Force (DAF) regulations and Child and Youth http://cpsc.gov/

Programs (CYP) standards. The Contractor shall retain sole responsibility for the performance, quality, and compliance of all deliverables throughout the life of the contract.

3 Technical Requirements/Tasks

3.1 Base bid: 100% Design Services

• 3.1.1 The Contractor shall perform 100% design services for the Playgrounds construction and all four (4) associated Optional Bid Items (OBIs) listed under Section 3.3.

• 3.1.2 All designs shall comply with applicable Department of the Air Force (DAF), Department of War (DoW), Unified Facilities Criteria (UFC), and national safety standards for child development and youth playground spaces.

• 3.1.3 Period of Performance Base Bid: 100% Design Services,120 calendar days

Core Preschool Playground Construction (Included in Base Bid),60 calendar days Total of 180 calendar days for the Base Bid

Option 1: Infant Playground, 45 calendar days Option 2: Pretoddler Playground , 45 calendar days Option 3: Toddler Playground, 45 calendar days Option 4: School-Age Care / Youth Programs Playground, 75 calendar days

3.2 Core Preschool Playground Construction (included in base bid)

• 3.2.1 Preschool Playground Construction: The Contractor shall construct the core preschool playground area in strict accordance with the approved 100% design package.

• 3.2.2 Government-Furnished Equipment (GFE) Installation: The Contractor shall receive, inventory, secure, assemble, and install all GFE playground equipment in the designated preschool playground area. The Contractor shall ensure all GFE installations meet manufacturer specifications and safety certifications.

3.3 Optional Bid Items (OBIs) / Playground Areas

At the unilateral discretion of the Government, and subject to the availability of funds, the Government may award one or more of the following Optional Bid Items. If awarded, the Contractor shall construct the designated area(s) in accordance with the approved 100% design:

• 3.3.1 Option 1 (Area 1 – Infant Playground): The Contractor shall construct the designated Infant Playground area, including site preparation, surfacing, and safety features.

• 3.3.2 Option 2 (Area 2 – Pretoddler Playground): The Contractor shall construct the designated Pretoddler Playground area, including site preparation, surfacing, and safety features.

• 3.3.3 Option 3 (Area 3 – Toddler Playground): The Contractor shall construct the designated Toddler Playground area, including site preparation, surfacing, and safety features.

• 3.3.4 Option 4 (Area 5 – School-Age Care [SAC] / Youth Programs [YP] Playground): The Contractor shall construct the designated SAC/YP Playground area, including site preparation, surfacing, and safety features.

4 Planning Requirements

4.1 Contract will be required to perform a Site and Topographical Surveys that will include the following: property lines, utility locations, easements, setbacks, all structures above and below grade, trees, wetlands, environmentally protected areas, streets, roads, etc. and provide finish contours as needed and required for completion of designs.

4.1.1 The installation and other organizations are permitted to provide site and topographical surveys, and other information/conditions, directly to the Contractor.

The Contractor is required to verify all site and topographical surveys and other existing conditions.

4.2 First Deliverables will be completed as a hard copy of the drawings, two half-size set drawings for Keesler AFB Civil Engineering Squadron (CES) and Force Support Squadron (FSS) and two half-size set drawings for Air Force Services Center (AFSVC). Additionally, Keesler AFB CES, FSS, and AFSVC will be provided with PDF and AutoCAD *.dwg format as well.

4.3 Handicapped Access: Where required ramps shall be provided for handicapped access (only required for CDC Preschool Playgrounds, SAC Playgrounds, YP Playgrounds, and the YP/SAC Playground and Basketball Court), if necessary, due to grades. The site access for the physically disabled shall be as required by Architectural Barriers Act (ABA).

4.4 Sidewalks: All pedestrian sidewalks are required for all playgrounds. Sidewalks shall be provided for emergency evacuations and to connect play areas. Sidewalks shall not have steps nor be blocked by buffers, portable items, or barriers of any kind. Existing sidewalks connecting operational areas, parking areas, streets and other walks as pedestrian traffic demands shall be maintained. All sidewalks shall be subject to use by the physically handicapped. Accessibility requirements for the paths shall not exceed 2 percent cross slopes and 5 percent longitudinal slopes and ABA standards shall be maintained. Sidewalks shall be firm, stable, and slip resistant. An accessible route shall connect all areas within the Accessible Playgrounds.

4.4.1 Turning Radius Outside of each CDC Child Activity Room – Sidewalks shall be firm, stable, and slip resistant. An accessible route shall connect all areas within the playground. A minimum walk width of 5 feet shall be maintained. Exit doors swinging outward shall have a minimum sidewalk radius of 5-feet following the door swing to ensure evacuations can take place with the door ajar. Sidewalks shall be Portland cement concrete unless noted otherwise. Space may not be available at existing buildings to occur.

4.5 Pedestrian Evacuation Sidewalk Routes and Evacuation Pads: Paved gathering points/pads with the closest edge a minimum of 75 feet away from any point of the facility has been provided for fire/emergency evacuation and are depicted on the Conceptual Drawings.

Existing paved evacuation sidewalks are depicted on the Conceptual Drawing(s). Note: Any changes to the fire evacuation routes and pads will require approval from AFSVC and AFCEC. An existing evacuation sidewalk within the playgrounds has been shown on the proposed site plan from the outdoor play environment personnel gates. Inside the Accessible Playground, the existing evacuation sidewalk size, locations, and personnel gate locations have been indicated on the proposed site plan; these are a portion of the evacuation routes from the activity rooms. If any portion of the emergency evacuation sidewalk route is new or proposed, the minimum walk width of five feet shall be maintained and shall allow use for children using a wheelchair or crutches. Evacuation sidewalks shall not be blocked by gates, buffers, portable items or barriers of any kind.

4.6 Fencing: An existing fence is provided at the perimeter of the outdoor play environment. If any portion of the existing fence is required to be replaced and/or altered per the requirements of this SOW, the new fence shall match the type and height of the adjacent existing perimeter fence, and the fence posts shall be installed to face the outside of the outdoor play environment. Note: if the existing fence does not meet the standards outlined below the Contractor will submit a RFI to determine how to move forward.

• A means shall be employed to ensure that no gap is between the bottom of the new fence and the ground.

• A 6-inch-wide concrete mow strip will be installed with the fence's vinyl-coated selvage extending below the bottom fence rail and underground, into the trench where the concrete is poured. This embeds the selvage in the concrete, preventing animals from digging under the fence and protecting it from lawn equipment. The top of the curb shall be flush with adjacent surfaces to allow for sufficient water run off after rainfall.

• Space between the new fence components and the facility, as well as any other space large enough to cause entrapment, shall not exceed 3.5 inches.

• No more than two threads of the inside bolt shall be visible; cut off bolt threads to eliminate injury.

• When attaching the new fence fabric, the bolt head shall face the inside of the outdoor play environment.

• The new fence shall be a minimum height of six feet, unless noted otherwise.

• All fence components shall be vinyl coated in a black, brown, tan or green color that complies with the Keesler AFB Architectural Compatibility Guide Standards.

4.6.1 To deter uncontrolled vehicles from damaging the existing and/or new perimeter fence and entering the outdoor play environments, the Contractor shall use bollards, raised planters, trees and/or other devices where the existing and/or new perimeter fence is located adjacent to access drives or base roadway system. Where additional force protection measures are required, the Contractor shall use Keesler AFB approved devices to protect each playground. Berms and ditches shall not be permitted as a force protection measure.

4.7 Maintenance Gates: A double wide gate with a minimum clear width of 12 feet wide shall be installed for maintenance and emergency vehicle access into each outdoor play environment.

The double-wide gate shall be installed in locations acceptable to Keesler AFB for maintenance access. Contractor shall coordinate with Keesler AFB Fire Department.

4.8 Personnel Gates: Personnel gates a minimum of 44 inches wide shall be installed allowing access out of each outdoor play environment. The personnel gates shall swing in both directions and shall be outfitted with handles/latches that allow opening the gate in one motion. Handles/ fork latches shall be installed at exactly 48 inches in height above the ground.

Note: Panic Hardware is not required and/or permitted. Fingerguards are not required.

4.9 Playground Material Preference: A wood fiber-polymer composite material made of a minimum of 95% recycled materials. These shall be:

Low-maintenance – no sanding, seal, or painting.

Durable – resistant to rot, fading, staining, mold, splintering, and termites. Resists wear, fading, and the growth of mold and mildew.

Fasteners are installed between deck boards, keeping the walking surface smooth and unblemished.

4.10 Site Demolition and Removal: The Contractor shall provide surveying as necessary to locate work items prior to initiating demolition work. All demolition of site work shown on the plans is approximate. Demolition limits shall be confirmed by the contractor and approved by the Contracting Officer’s Representative (COR). Erosion and sediment control Best Management Practices (BMPs) shall be in place and approved by the COR prior to initiating demolition work. BMPs shall be maintained through the entirety of the project. The Contractor is responsible for all demolition debris removed from the site and off Keesler AFB. The Contractor shall be responsible for all disposal permits and regulation requirements. The Contractor shall coordinate with the Base Civil Engineer Group (CEG) or Squadron (CES) to confirm proposed haul route and access gate locations and transportation of any imported/exported demolition or borrow materials within and outside the Base.

4.11 Installation: Contractor shall install furnished playground equipment in accordance with manufacturer's recommendations and must ensure that all equipment installation meets Consumer Product Safety Commission (CPSC) and American with Disabilities Act (ADA) guidelines for acceptability for Public Playgrounds. Contractor shall install new concrete in preparation for new poured-in-place fall protection impact surfacing (government furnished) under playground equipment and throughout the existing fall protection area. Surfacing must meet CPSC guidelines for acceptability of unitary material for impact surfacing around playground equipment. Contractors must ensure depth of surfacing meets critical height requirements for installed and modified playground equipment. The poured in place, two-course, ADA compliant, fall protection impact surfacing shall be not less than two- and one-half inches (2-1/2”) thick, thicker if required, and shall be tapered to grade at the existing concrete expansion joints forming the perimeter of the playground. Contractor will ensure a 2% slope on all play surfaces and concrete surfaces for drainage. Completed Impact Surfacing shall be free draining without surface water ponding. Contractor is to provide number and type of drain per site specific climate and soil conditions. Contractor must provide (AFSVC) with a letter certifying playground equipment meets above criteria. Installation, construction, and miscellaneous repair actions include but are not limited to the specific items listed, refer to specific finalized site designs for guidance.

4.12 Construction: The project will include the mixing and pouring of concrete; work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland cement concrete sidewalk. It shall also consist of the removal of existing sidewalks or driveways or curb and gutter and other obstructions for excavating and filling, for fine grading and compaction of subgrade, and all backfilling necessary to complete the work, including the disposal of surplus material and cleaning up of the work. The subgrade for sidewalks shall be formed by excavating to the required depth, and shaped to the proper cross section, and shall be thoroughly compacted by rolling or tamping before placing any concrete to 95% compaction. Contractor shall plan and protect his work in a manner which will ensure satisfactory results. Any concrete damage by freezing shall be removed and replaced by the Contractor at his own expense.

4.12.1 Strength: Specified compressive strength f ‘c shall be a minimum of 3,000 psi at 28 days for all structural concrete. Mix designs shall include recycled materials, such as fly ash and ground granulated blast furnace slag, to the maximum extent possible.

Reinforcement shall comply with ASTM A615, Grade 60 minimum. Structural plain concrete is not permitted.

4.12.2 Reinforcing: The reinforcing of foundations shall be continuous and therefore, typical details showing the arrangement of reinforcing at corners and intersections of these members shall be shown on the drawings.

4.12.3 Slabs-on-Grade: In no case shall a slab-on-grade be less than 4 inches thick. A minimum of 0.15 percent welded wire mesh or reinforcing bars shall be provided in each direction in slabs, placed 1 inch clear from the top of slab. Welded wire fabric in flat sheets or deformed reinforcing bars shall be used.

Slabs-on-grade shall be placed in lanes. The area bounded by crack control joints shall not exceed 625 square feet, and the distance between parallel crack control joints shall not exceed 25 feet. Crack control joints may be construction joints, contraction joints, expansion joints, or isolation joints.

4.12.4 Embeds: Exterior steel embedded in concrete for such purposes as exterior railing, handrails, fence, base plates, anchor bolts, etc. shall be hot-dipped galvanized unless otherwise directed.

4.13 Grading

4.13.1 General: Grading shall be in accordance with UFC 3-201-01 and Section 438 of the

Energy Independence and Security Act of 2007 (EISA).

4.13.2 Permits: Erosion and sediment control BMPs shall be in place and approved by the Contracting Officer’s Representative prior to initiating any work. Dewatering projects that discharge into surface waters or storm water systems are required to operate under the coverage of NPDES and/or similar permits. The Contractor shall obtain the necessary permit(s) for any groundwater discharge off site and shall operate in compliance with the permit.

4.13.3 Outdoor Play Environments: Grades for the Accessible Playgrounds shall be in accordance with UFC 3-210-06A, Site Planning and Design, FC 4-740-14F, and UFC 4-740-06. Positive drainage must allow water to drain away immediately after rain events. The slopes for the grassed areas within the Accessible Playground shall be a maximum of 1 percent cross slope and 5 percent longitudinal to provide positive drainage.

4.13.4 Finish Grade Contours and Spot Elevations: The Contractor shall provide finish grade contours at 1-foot intervals, and spot elevations to construct all site development features to elevations within the above grading criteria and tolerances as specified in the guide specifications. Spot elevations on the drawings shall be sufficient so that interpolation between contours is not required for structures, grading or paved areas; some examples are corners of paved areas, low points, high points, flow lines of swells or ditches, changes in degree of slope and grading at corners of the facility to ensure positive drainage away from the facility. The use of cut or fill symbols in lieu of finish grade contours is not permitted.

4.14 Utilities

4.14.1 Demolition and Removal: Contractor shall provide a survey to include existing conditions and locations of existing structures and utilities at the time the survey is performed. Utilities not shown on the plans may be present on-site and it is the responsibility of the Contractor to obtain information for these utilities. The Contractor shall provide surveying as necessary to locate the utility items prior to initiating demolition work. All demolition of utilities shown on the plans is approximate. Limits of demolition shall be determined by the Contractor, and approved by Contracting Officer’s Representative, to ensure utilities remain operable throughout construction. Abandoned or existing utility lines found to be under the site or interfere with the project shall be coordinated with the Contracting Office Representative. Removal and/or relocation shall be at Contractor’s expense.

4.14.2 Utility Layout: Government supplied surveys and construction documents related to the location of utilities may not represent actual installed conditions. The Contractor shall verify actual locations of all placed utilities and shall coordinate with the Government regarding any future planned utility installations that affect the work.

Coordination of all site work on the project, including utility work, is the responsibility of the Contractor. It is the Contractor's responsibility to confirm the specific locations of all existing utilities prior to commencing work. All sanitary sewers, storm water, water supply, gas, and electrical construction shall be in strict compliance with local and Base requirements.

The Contractor shall obtain all required Base, City, County and State permits for installation and operation of all utilities. Any anticipated utility outages shall be coordinated with the Contracting Officer’s Representative at least 72 hours in advance. Any utilities or equipment that needs to be relocated to construct the facility shall be accomplished in such a manner as to minimize the impact on the existing facilities.

No physical connections shall exist between sewer and water supply systems.

4.14.3 Utility Connections: All utility connections shall be coordinated with the Contracting Officer’s Representative.

4.14.4 Device Location: Backflow prevention valves, post indicator valves, transformers, electric switches, telephone/cable boxes, manholes, etc., shall be placed in locations not immediately apparent to the facility users or personnel passing by the site.

4.14.5 Marking of Utility Lines: Every linear foot of underground metallic piping shall be identified with plastic marking tape specifying the type of pipe buried under it. Every linear foot of underground non-metallic piping shall be identified with metallic tape manufactured specifically for warning and identification of underground utilities.

The metallic tape shall be detectable by electronic detection instruments and shall indicate the type of pipe buried under it. The tape shall be buried 12 inches above the pipe.

Tape Color Utility Red Electric Orange Telephone, telegraph, television, and communications Blue Water systems Green Sewer systems Yellow Gas or other dangerous materials

4.14.6 Excavations: All excavations, trenches, open manholes, etc., shall be properly shored, braced, barricaded, or guarded. The Contractor shall provide barricades and maintain warning lights or other illumination from sunset to sunup at all excavations that are adjacent to pedestrian or vehicle thoroughfares or as directed by the Contracting Officer’s Representative.

4.14.7 Safety: Contractor personnel shall not enter manholes, tunnels, tanks, or confined spaces until such entry complies with the requirements of OSHA. Government personnel will not enter manholes, tunnels, tanks, or confined spaces until a confined space entry permit has been obtained from a government representative.

4.15 Permits

4.15.1 Permits required for this project shall include but may not necessarily be limited to the items listed within this section. Any permit work done by the Contractor shall be at no additional cost to the Government. Contactor is responsible for all required permits. The Contractor shall obtain all necessary permits for Storm Water Management, Digging, Erosion Control, Clean Water Act, and National Pollutant Discharge Elimination Systems Permit (NPDES) for work on the base prior to any land disturbing activities as prescribed by the respective permit.

4.15.1.1 Storm water Management Permit: Contractor shall coordinate with the BCE for permit requirements.

4.15.1.2 Sanitary Sewer Permit: If this permit is required, the Contractor shall coordinate with the BCE for permit requirements.

4.15.1.3 National Pollutant Discharge Elimination Systems (NPDES) Permit:

Contractor shall coordinate with the BCE for permit requirements.

4.15.2 The Contractor shall develop and implement a Storm Water Pollution Prevention Plan (SWPPP) to be in compliance with the permit. The SWPPP shall be prepared in accordance with and meet the intent of the latest version of the National Pollutant Discharge Elimination Systems Permit (NPDES). The plan shall be submitted to the Contracting Officer’s Representative to be reviewed by the Base Civil Engineering Squadron. The Contractor shall implement, maintain, and update the SWPPP, as required, throughout the project until a Notice of Termination for permit coverage is submitted upon final stabilization of the project site. The Contractor shall always maintain a copy of the SWPPP on-site during construction and shall make the plan and all supporting documents and reports available for inspection upon request by the Government and/or Regulatory Agency.

4.15.3 Upon completion and acceptance of the SWPPP the contractor shall complete and submit a Notice of Intent (NOI) to the NPDES Storm water Notices Center to obtain permit coverage. The Contractor shall clearly define the requirements for the NPDES permit. Site plans shall conform to the applicable requirements of an NPDES permit by incorporating designs that control runoff and erosion. The Contractor must include with the NOI the appropriate processing fee payable to the Department of Environmental Protection.

4.15.4 No sitework shall commence until the NOI has been submitted and accepted by the

State. A copy of the NOI and a brief description of the project shall be posted at the construction site in a prominent place for public viewing.

4.15.5 Upon satisfactory completion of final stabilization of the project site and acceptance by the Government, the Contractor shall submit a Notice of Termination of permit coverage to the NPDES Storm water Notices Center for the project. The Contractor shall coordinate with Base Civil Engineer for all permitting and plan review.

4.16 Water

4.16.1 Water supply is limited to irrigation only.

4.17 Landscape, Irrigation, and Features

4.17.1 The Contractor shall be responsible for proper care and watering of grass, shrubs, trees, and ground cover, from the beginning of the operation and continuing until the Government accepts the facility. The Contractor is required to provide a warranty for two months (60 days) following beneficial occupancy date (BOD) for all trees and sod that have been procured and installed by the Contractor.

4.18 SOD/Seed

4.18.1 Turf preparation shall include eradication of unwanted vegetation and the use of a pre-emergent granular herbicide. Existing grass areas within the project limits not designated as existing to remain, shall be replaced with new solid sod. The existing grass in the areas designated as new nature areas shall be removed and graded according to the plans. SOD will be Geo Zoysia

4.18.2 All scarred and graded areas to receive grass shall be solid sodded with new sod (native to area and withstands high traffic). Edging shall be provided between grassed areas and all landscape planting beds, trees, and bushes. Contractor shall consult with base turf manager to determine the most suitable grass for the application.

4.18.3 In areas of demolition, a minimum of 4 inches of topsoil shall be provided and graded prior to sod placement. The Contractor shall provide a soil analysis report containing test readings and soil amendment recommendations. The soil analysis report shall include percent of organic matter, pH, potassium, phosphorus, calcium, magnesium levels, nematode count, and soil amendment recommendations (N-P-K). Fertilizer and other soil amendments shall be applied as recommended in the soil analysis report to provide healthy sod. The area within the limits of construction shall present a neat and finished appearance. Artificial turf shall not be permitted.

4.19 Landscape Plantings, Maintenance and Establishment

4.19.1 Existing Vegetation: Contractor shall maintain as much of the existing vegetation as possible. Vegetation to remain shall be protected during construction. Contractor shall also replace any damaged vegetation at their own expense. Includes but not limited to: sod, trees, shrubs, etc.

4.19.2 Maintenance: Good project planning and established maintenance practices shall increase the life cycle and protect the beauty of newly planted landscaping. Proper and consistent maintenance and establishment are critical components for a successful landscape program. Contractor shall prepare a written maintenance plan and obtain approval from the COR. The plan shall include basic plant care such as watering, mowing, weeding, trash collecting, erosion control, plant replacement, pruning, and insect and disease control.

4.20 General site work: Requirements for this project shall include but may not be necessarily limited to the specific items listed- refer to specific finalized site designs for guidance. The area around the main play areas shall have landscaping repaired to ensure a seamless flow from lawn to playground.

4.21 Design

4.21.1 50% Design Report: The contractor shall schedule and conduct a “50% Design” review at Keesler AFB with representatives of the CES, FSS, and AFSVC Child and Youth Programs (CYP) and Capital Improvements (VMX). NOTE: AFSVC will attend virtually. The presentation product shall be the 50% design with drawings reflecting resolution of the design agreed to by all participants.

4.21.2 The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed (i.e. State of Mississippi).

4.21.3 95% Design Report: The contractor shall submit a bound report, with drawings, finalizing the design intent as developed and approved by the design team incorporating all comments. The report shall include all the comments from the 50% review meeting. The representatives of the Keesler AFB CES, FSS, and AFSVC CYP and VMX will review the design documents and provide comments.

4.21.4 100% Final Design and Submittal: The contractor will prepare and submit for approval construction drawings, specifications, and other related and supporting documents. The contractor will incorporate 95% review comments as part of completing the 100% design submittal. The contractor shall prepare this submittal so that it is 100% complete. If this submittal is not complete, it will be rejected, and the contractor shall resubmit at no cost to the Government.

4.21.5 Design Submittals: The contractor shall make 50%, 100% and Corrected 100% submissions, as directed in this SOW. Content and format of deliverables are described in subsequent sections of this SOW. Any submittal that does not meet the requirements of the Contract and/or the SOW will be rejected, and the contractor shall resubmit acceptable documents at no additional cost. Every resubmittal shall include deliverables in their entirety, including pages or sheets that did not change from their previous submittal. All submittals and Requests for Information (RFIs) processed and answered by the Designer of Record (DOR) during this phase shall be forwarded to the Government for final review and approval

4.21.6 Document Requirements: All documents and correspondence shall be in English in accordance with FAR 252.225-7041. Listed below are the documents necessary for each of the submittals. This list represents the minimum amount of information required and is not necessarily all inclusive. Submittals shall be sent as one complete package. Items may be separated in multiple containers for shipping ease but not sent on multiple dates.

4.22 50% Design Report – Required submittal documents:

4.22.1 Drawings – existing floor plan(s)/demolition plan(s), site plan(s), existing site topographic plan (s), site grading/drainage plan – identify preliminary site grading/drainage relative to new constructions, landscape plan – identify proposed soft and hard landscape elements, playground equipment plan.

4.22.2 Draft Technical Specifications – provide outline specifications identifying preliminary technical requirements as applicable for civil, architectural, structural, mechanical, plumbing, and electrical work.

4.22.3 Report – The report includes a project description identifying design concept. It also must identify all open action items.

4.22.4 Final Design (100%) – Required submittal documents: Description: Final submittal must be 100% complete documents (ready-to-advertise [RTA] package), requiring only overview to ensure incorporation of all submittal review comments; all construction documents must be fully coordinated, dimensioned, detailed, noted, and cross-referenced.

4.23 Submittal Matrix: Agency 50% 100% Corrected, 100% (RTA)

Each agency listed below will require one set ½ size and CD:

Keesler AFB CES Keesler AFB FSS/CD Keesler AFB FSS/VCY

AFSVC/VCA

AFSVC/ VMX

Keesler AFB Contracting Office

4.24 Submittal Coordination & Delivery: Submittals should be shipped in complete packages unless authorized in advance by AFSVC. All submittals shall be shipped via priority mail for delivery by the scheduled Submittal date. Coordinate POCs for submittal delivery.

4.25 Required submittal documents: All submittal documents must be fully coordinated, dimensioned, detailed, noted, cross-referenced, and commensurate of a design effort for the percentage indicated for that deliverable. AutoCAD files and PDFs – In addition to a hard copy of the drawings, provide designated government stakeholder Points of Contact (POCs) a copy of each drawing sheet in AutoCAD *.dwg format and PDF format.

4.26 Digital Document Requirements: In order for this installation to accommodate electronic in-house project submittal review, the A/E is required to submit the documents in digital formats, a copy of each drawing sheet in AutoCAD *.dwg format and PDF format. These documents shall be prepared, organized, and submitted on a Master CD in the following folders and formats. This is in addition to the hard copy requirements listed elsewhere in the SOW.

4.27 Folder “SPECIFICATIONS”: For all submittals, provide all specification sections in separate files in the current release of Microsoft Word (.doc) format. The Cover Sheet and Table of Contents shall also be provided as separate (.doc) files.

4.28 Folder “DRAWINGS”: For all submittals for CES and AFSVC/VMX, provide all drawings in separate files for each drawing sheet in the current release of AutoCAD (.dwg) format and in PDF format. All other CDs shall be bookmarked in PDF format. Use the A/E/C CAD Standard as published on the WBDG website and as adopted by the Air Force. The link can be found at: https://www.wbdg.org/FFC/AECCAD/ERDCITL_TR12- 6_r6.pdf The minimum font size on drawings shall be 1/8” when plotted on full size drawings, (24” x 36” or larger).

The floor plan shall include a layer titled “scope” with polylines defining the gross building footprint and programmed spaces (which may include existing unaltered space, existing altered space, new addition space, new construction space, etc.). All external references shall be bound to the drawing files; electronic copies that are not readable due to XREF (x-reference files) or layering issues will cause the entire submission to be rejected in total, resubmittal will be at A/E expense. Should differently plot configuration files be necessary for consultants, drawings shall be organized into separate sub-folders and accompanied by appropriate x-references and plot configuration files. For example, a sub-folder named “Electrical” may include all electrical drawings, x-reference files and appropriate plot configuration file for that consultant. Plot configuration files shall be named for the A/E firm preparing the drawings.

4.29 CD and DVD Label Requirement: All submitted CDs and DVDs shall have a printed label affixed to them. Handwriting is not allowed. Each label shall include the following information: • Keesler AFB SAC/YP • Name of Project or Building Type Playgrounds • Base CE Project Number (If Applicable) • Submittal Percentage • Date of Submittal • Name of A/E Firm

4.30 Scheduling of Meetings: All meetings shall be coordinated a minimum of two (2) weeks in advance with the schedules of AFSVC/VMX and AFSVC/VCA representatives. Any change to the schedule must be coordinated a minimum of five (5) business days prior to the meeting.

5 Keesler AFB CDC, Building 0308 Infant Playground - Bid Option-1 (Demolition and Removal):

• Remove all existing equipment and surfacing with the exception of the umbrella shade unit

• Remove the existing outdoor carpets and underneath pads

• Remove all existing grass and soil as needed and regrade the entire area ensuring a two percent slope with positive drainage away from the building and playground equipment

• The slope of evacuation path shall be incompliance with ABA standards.

Construction (Concrete):

• Install 1” PVC drain in concrete slab where Pebble-flex shall be installed.

(Where applicable)

• Install Pebble-flex prepped slab concrete slab at 4” Min. thickness, sloped to

Drain, 1/8” to 1/4” per foot.

• Surface prep concrete prior to Pebble-flex installation with a light broom finish

• Install 4-inch-wide concrete border around playground equipment area to include sand box area. Ensure concrete border is flush with the ground level.

• Repair access walks as indicated on plans.

• Install a 12’ x 12’ concrete pad for new storage shed.

Installation:

• Add two 10’ by 17’, and one 20’ round Pebbleflex surface and hip shade structure – ensuring a two percent slope with positive drainage away from the building and playground equipment.

• Add one child-size (185lbs) trash receptacle, direct bury. Ensure trash receptacle is installed flush with ground.

• Clean and caulk expansion joints and between concrete and building.

• Closing any gaps between the fence and ground grade with a permeable material to prevent standing water and a proper draining.

• Correct all site drainage issues, by relocating the roof drains to the outside of the fence line.

• Ensure a two percent minimum slope on all concrete and Pebbleflex surfaces to allow for drainage.

• Clean out all gutters.

• Power wash all hard surfaces and the building.

• Fix/Replace all exterior window screens.

• Install U-Line Convex, or approved equal, Mirrors. Mirrors supplied by the

CDC.

• Fix/Repair/Re-install the fingerguards at all exterior doors (must be at the bottom of the doors).

• Add a new 12’ x 12’ wooden storage shed at the westside of the existing playground storage shed on new concrete slab, built by contractor. Ensure the front of storage shed is flush with fence to eliminate any blind spots.

• Cover all spigots and electrical outlet covers to protect during construction.

• Sod all construction disrupted areas with the sod type approved by COR and CO

– this includes the grass area for water play. Geo Zoysia used is to be used.

• Sand and paint all exterior doors, door and viewing panel frames, and window frames.

5.1 Keesler AFB CDC, Building 0308 Pre-Toddler Playground- Bid Option-2

*Note: The Pretoddler Playground configuration will be modified with this project. The fence line will be brought in towards the interior pillar outside of room “E”.

• Remove all existing equipment and surfacing.

• Remove all existing grass and soil as needed and regrade the entire area, ensuring a two percent slope with positive drainage away from the building and playground equipment; considering there are three playgrounds adjacent to each other.

• Remove all water fountains and plumbing and cap in accordance with the utility shop guidelines.

(Where applicable)

• Install Pebble-flex prepped slab concrete slab at 4” Min. thickness, sloped to Drain, 1/8” to 1/4” per foot.

• Surface prep concrete prior to Pebble-flex installation with a light broom finish

• Install 4-inch-wide concrete border around playground equipment area to include sand box area. Ensure concrete border is flush with the ground level.

• Add LSI pretoddler play structure and shade

• Add LSI sand box and shade, cover, and geotextile lining to prevent weeds and allow for drainage

• Add one child-size (185lbs) trash receptacle, direct bury. Ensure trash receptacle is installed flush with ground.

• Add two 2 Place LSI toddler clear paint panels. Bottom of panel to sit at 15.9” inches max above ground.

• Sand and paint all exterior doors, door and viewing panel frames, and window frames.

• Add Music Equipment – three drums and one marimba; provided by the CDC

• Add 8 ea. garden planter boxes; color to match LSI color pallet. Refer to section

4.9 for material preference.

• Add stage as indicated in plan. Refer to section 4.9 for material preference.

• Clean and caulk expansion joints and between concrete and building

• Correct all site drainage issues

• Ensure a 2% minimum slope on all concrete and Pebble-flex surfaces to allow for drainage

• Clean out all gutters.

• Power wash all hard surfaces and the building.

• Fix/Replace all exterior window screens.

• Replace all outlets to be tamper resistant.

• Repair water spigot outside Room “H”.

• Install U-Line Convex, or approved equal, Mirrors. Mirrors supplied by the

CDC.

• Fix/Repair/Re-install the fingerguards at all exterior doors (must be installed to the bottom of the doors)

• Add new 12’ x 12’ wooden storage shed, built by contractor, on new concrete slab. Ensure the front of storage shed is flush with fence to eliminate any blind spots.

• Sod all construction disrupted areas with the sod type approved by COR and CO

– this includes the grass area for water play. Geo Zoysia sod is to be used.

5.2 Keesler AFB CDC, Building 0308 Toddler Playground - Bid Option-3

*Note: The toddler playground configuration will be modified with this project.

• Remove all existing grass and soil as needed and regrade the entire area ensuring a 2% slope with positive drainage away from the building and playground equipment; considering there are three playgrounds adjacent to each other.

• Remove all the outdoor carpets and paddings from the playground.

• Remove all water fountains and plumbing and cap them flush with the building.

(Where applicable).

• Install Pebble-flex prepped slab concrete slab at 4” Min. thickness, sloped to Drain, 1/8” to 1/4” per foot.

• Surface prep concrete prior to Pebble-flex installation with a light broom finish

• Install 4-inch-wide concrete border around playground equipment area to include sand box area. Ensure concrete border is flush with the ground level.

• Install a 4’ x 16’ concrete pad for trike shed.

• Add LSI toddler play structure and shade.

• Add LSI sand box and shade, cover and geotextile lining to prevent weeds and allow for drainage.

• Add two child-size (185lbs) trash receptacles, direct bury. Ensure trash receptacle is installed flush with ground.

• Sand and paint all exterior doors, door and viewing panel frames, and window frames.

• Add three LSI toddler clear paint panels. Bottom of panel to sit at 19.1” inches max above ground.

• Add music equipment – four drums and one marimba; provided by the CDC.

• Add 8 ea. garden planter boxes- color to match LSI color pallet. Refer to section

4.9 for material preference.

• Add 12’ x 12’ wooden storage building on concrete slab as indicated on plan.

Ensure the front of storage shed is flush with fence to eliminate any blind spots.

• Add 4’ x 16’ trike shed. Ensure the front of trike shed is flush with fence to eliminate any blind spots.

• Add bench (1 ea.) around existing trees as indicated in plan. Refer to section 4.9 for material preference.

• Add stage as indicated in plan. Refer to section 4.9 for material preference.

• Clean and caulk expansion joints and between concrete and building.

• Correct all site drainage issues and relocate all the roof drains from the playground areas and direct them to the storm drains.

• Ensure a 2% minimum slope on all concrete and Pebble-flex surfaces to allow for drainage.

• Clean out all gutters.

• Power wash all hard surfaces and the building.

• Fix/Replace all exterior window screens.

• Sand and paint all exterior doors (including mech room) door, viewing panel frame, and window frames.

• Replace all outlets to be tamper resistant.

• Repair water spigots.

o Note: As currently installed, they are a protrusion hazard

• Install U-Line Convex, or approved equal, Mirrors. Mirrors supplied by the

CDC.

• Fix/Repair/Re-install the fingerguards at all exterior doors (must be installed to the bottom of the doors)

• Sod all construction disrupted areas with the sod type approved by COR and CO

– this includes the grass areas for water play. Geo Zoysia sod is to be used.

• Repair the awning; sand and repaint the awning; install an aluminum ceiling to eliminate birds nesting.

5.3 Keesler AFB CDC, Building 0308 Pre-School Playground- Base Bid

*Note: The pre-school playground configuration will be modified with this project. There are also slope/ drainage issues to be addressed from the building to the canopy area.

• Remove all existing grass and soil as needed and regrade the entire area, ensuring a 2% slope with positive drainage away from the building and playground equipment; considering there are three playgrounds adjacent to each other.

• Remove all water fountains and plumbing and cap in accordance with Utility Shop guidelines.

• Install new concrete in coordination with a layout confirmed with playground

Architect.

• Install Pebbleflex prepped slab concrete slab 2ea. at 4” Min. thickness, sloped to

Drain, 1/8” to 1/4” per foot.

• Surface prep concrete prior to Pebbleflex installation with a light broom finish.

• Install 1” PVC drain in concrete slab where Pebbleflex will be installed.

• Install 4-inch-wide concrete border around playground equipment area. Ensure concrete border is flush with the ground level.

• Install a 8’ x 12’ concrete pad for new storage shed.

• Install a 4’ x 16’ concrete pad for trike shed.

• Add LSI preschool play structure and shade.

• Add LSI sand box (with transfer station) and shade, cover and geotextile lining to prevent weeds and allow for drainage.

• Add two child-size (185lbs) trash receptacles, direct bury. Ensure trash receptacle is installed flush with ground.

• Add four LSI toddler clear paint panels. Bottom of panel to at 24.7” inches max above ground.

• Add music equipment – five drums and one marimba; provided by the CDC

• Add 8 ea. garden planter boxes; color to match LSI color pallet. Refer to section

4.9 for material preference.

• Add new 8’ x 12’ storage shed on new concrete slab as indicated on plan. Ensure the front of storage shed is flush with fence to eliminate any blind spots.

• Add 4’ x 16’ trike shed. Ensure the front of trike shed is flush with fence to eliminate any blind spots.

• Add bench (1 ea.) around existing trees as indicated in plan. Refer to section 4.9 for material preference.

• Add stage as indicated in plan. Refer to section 4.9 for material preference.

• Clean and caulk expansion joints and between concrete and building.

• Correct all site drainage issues.

• Ensure a 2% minimum slope on all concrete and Pebbleflex surfaces to allow for drainage.

• Clean out all gutters.

• Power wash all hard surfaces and the building.

• Fix/Replace all exterior window screens.

• Sand and paint all exterior doors, door and viewing panel frames, and window frames.

• Replace all outlets to be tamper resistant.

• Repair water spigots:

o Note: As currently installed, they are a protrusion hazard.

• Install U-Line Convex, or approved equal, Mirrors. Mirrors supplied by the

CDC.

• Fix/Repair/Re-install the fingerguards at all exterior doors (must be installed to the bottom of the doors).

• Sod all construction disrupted areas with the sod type approved by COR and CO

– this includes the grass area for water play. Geo Zoysia sod to be used.

5.4 Keesler AFB SAC/YP, Building 6801: Playground and Basketball Court-Bid Option -4

*Note: The playground and basketball court configuration will be modified with this project.

• Remove all existing equipment and surfacing including the basketball court.

• Remove containment borders.

• Remove all existing grass and soil as needed and regrade the entire area, ensuring a 2% slope with positive drainage away from the building and playground equipment; considering there are three playgrounds adjacent to each other.

• Remove the water fountain and plumbing and cap in accordance with the Utility Shop guidelines.

• Remove existing 3’ high fence at the north and west side of SAC/YP – roughly 450’.

• Install new concrete in coordination with a layout confirmed with Playground Architect.

• Install prepped slab concrete slab at 4” minimum thickness, sloped to drain, 1/8” to 1/4” per foot.

• Surface prep concrete prior to Pebbleflex installation with a light broom finish.

• Install a 1” PVC drain in concrete slab where Pebbleflex will be installed.

• Install 4” wide concrete border around playground equipment area. Ensure concrete borders are flush with ground level.

• Install (2) 10’ x 12’ concrete pads for new & relocated storage sheds.

• Install (1) 10’ x 16’ concrete pad for existing storage shed.

• Add High School Basketball Court concrete pad basketball court with new painted lines. Include stations for volleyball and pickleball.

• Add a 12’ high fence that expands the width of the basketball court – behind the goal. Match existing fence.

• Install roughly 450’ of dark green vinyl coated fencing at north and west side of SAC/YP. Fence to be 6’ high minimum. Refer to UFC 4-740-14F: 6-5.1 for details.

• Install pads for fencing behind the goals and gym wall provided by SAC/YP.

• Install adjustable basketball goal with breakaway rim.

• Install a new fire evacuation sidewalk and fire evacuation pad; pad must be a minimum of 75’ from building and must have a paved route to a public way.

• Add LSI school age play structure and shade.

• Add four standard-size trash receptacles, direct bury. Ensure trash receptacle is installed flush with ground.

• Add 4 ea. garden planter boxes- color to match LSI color pallet. Refer to section

4.9 for material preference.

• Relocate (1) 10’ x 12’ storage shed on new concrete slab as indicated on plan.

Ensure the…