This is Amendment 0001 to Solicitation FA301026R0009, issued by the U.S. Air Force 81st Contracting Squadron at Keesler Air Force Base, Mississippi, effective May 5, 2026. The amendment modifies the competitive, lowest-price technically acceptable acquisition for construction services at Keesler AFB, with the contracting officer being Alice Townsend-Peden (alice.townsend-peden@us.af.mil).

The amendment adds FAR Clause 52.222-90 (Addressing DEI Discrimination by Federal Contractors) under Deviation 2026-O0038 and updates Section L to remove previous contract specialist Taylor Williams as the point of contact, designating all questions and proposals to be submitted to the contracting officer. Offerors must acknowledge receipt of the amendment prior to the solicitation closing date. The procurement follows a three-part proposal structure: Part I requires a completed Standard Form 1442 with proposed unit pricing for Contract Line Items 0001 and 0002, along with bonding as specified in 52.228-1; Part II requires a Project Execution Plan addressing construction approach, detailed progress schedule (Gantt chart format), quality control plan, materials list with identification of foreign materials and equipment over 7,500 pounds, and key personnel/subcontractor qualifications; Part III requires past performance information listing up to five relevant federal or private contracts from the past three years, submitted via the Past Performance Reference List and Past Performance Questionnaire attachments. The solicitation includes a pre-bid site visit on April 27, 2026 at 10:00 AM CT at Blake Fitness Center Building 1201, Keesler AFB, requiring base passes obtained through the Visitor Center with valid government-issued photo identification. Electronic proposals may be submitted via email to 81CONS.PKA.Flight@us.af.mil and alice.townsend-peden@us.af.mil in PDF format (150MB maximum size), with hard copy submissions to Keesler AFB address Block 8. Proposals remain valid for 180 days from the proposal due date, and offerors must verify receipt of their proposals prior to the solicitation close date and time. Non-government advisors from HDR and Akima may review technical and cost/price data unless offerors submit written objections within 10 days of RFP issuance.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

05 May 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

MAHG251046

6. ISSUED BY CODE FA3010

FA3010 81 CONS CC

310 M ST BLDG 4605, CP 228 377 3230

KEESLER AFB, MS 39534-2701

UNITED STATES

Alice Townsend-Peden, Email: alice.townsend-peden@us.af.mil Telephone: 2283771831 Alice Townsend-Peden, Email: alice.townsend-peden@us.af.mil Telephone: 228-377-1831

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA301026R0009

9B. DATED (SEE ITEM 11)

22 Apr 2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Alice O. Townsend-Peden

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

05 May 2026

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to: Block 14 (Description of Amendment/Modification):

- Add clause 52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0038)

- Update Section L to remove Contract Specialist information for Taylor Williams. All questions and/or proposals need to be submitted to alice.townsend-peden@us.af.mil. It is the offeror's responsibility to verify the receipt of their proposal prior to solicitation close date and time.

- Notify offerors that pre-bid site visit questions have been uploaded to the solicitation in the System for Award Management (SAM.gov) on 5 May 2026. By signing this amendment, the offeror acknowledges the questions and answers responses posted to SAM.gov.

All other terms and conditions remain unchanged.

Section I - Contract Clauses

Additional Regulation or Supplemental Clauses Incorporated by Full Text

The following Clause(s) were added:

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective

Date 52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0038) Apr 2026

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

A. General Information

1. Contractor Selection

Selection of a contractor will be based on competitive, lowest price technically acceptable acquisition procedures as prescribed in FAR Part 15, consistent with the evaluation factors described in Section M - Evaluation Factors for Award.

To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award.

2. Point of Contact

Address any and all questions or concerns in writing by email. The Contracting Officer's address is The Contracting Officer is the sole points of contact for this acquisition.

as follows:

Contracting Officer:

Alice Townsend-Peden 310 M Street, Bldg 4605 Keesler AFB, MS 39534 E-mail: alice.townsend-peden@us.af.mil

3. Proprietary Information

Information deemed by the Offeror to be proprietary shall be clearly marked as proprietary information. Proposals submitted in response to this solicitation will not be returned.

4. Non-Government Advisors

FA301026R00090001

(a) Offerors are advised that technical and cost/price data submitted to the government in response to this solicitation may be released to non-government advisors for review and analysis. The non-government advisor support will be provided by:

Table 1: Source Selection Support Contractor

Company Name

Address

HDR

1917 S. 67th Street, Omaha, NE 68106- 2973

Akima

2553 Dulles View Drive, Suite 700, Herndon VA 20171

(b) Offerors shall complete paragraph (b)(2) or provide written objection to disclosure as indicated in paragraph (b)(1) if the offeror objects to disclosure of a portion of the proposal, the consent in (b)(2) should be provided for the remainder of the proposal.

(1) Any objection to disclosure*:

(i) Shall be provided in writing to the CO within 10 days of RFP issuance: and

(ii) Shall include a detailed statement of the basis for the objection. The detailed statement shall identify the specific portions of the proposal the offeror objects to disclosure to non-government advisors.

(2) I understand technical and cost/price data submitted to the government in response to this solicitation may be released to non-government advisors. I consent to release of any (unless objection is provided in (b)(1) above) proprietary, confidential, or privileged commercial or financial data provided by the firm(s) named below in response to this solicitation, to non-government advisors for review and analysis.

Firm:

Name (individual authorized to commit firm):

Title:

Date of Execution:

Signature:

*Note: The Government is the final arbiter in the disposition of any disclosure objections.

5. Written questions or requests for clarification may be sent via email to the 81st Contracting Org box: 81CONS.PKA.Flight@us.af.mil and alice.townsend-peden@us.af.mil. A suspense date for questions or clarifications will be posted in the Solicitation Notice on SAM.gov. The decision whether to respond to questions and requests for clarification submitted after the posted date shall be at the sole discretion of the CO.

A pre-bid site visit will be conducted ormation provided at this conference shall not qualify the terms and conditions of the solicitation on . Inf 27 April 2026 at 10:00 AM CT and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of the solicitation amendments apply.

Pre-bid Site Visit attendees will meet in the parking lot across the street on the North side of Blake Fitness Center Building 1201, 1201 H Street, Keesler AFB, MS, on 27 April 2026 at 10:00 a.m. Please note that there is an active construction project ongoing in Building 1201 and fence surrounding the building.

All site visit participants MUST have a base pass to attend which may be obtained from the Keesler AFB Visitor Center. To gain base access you must have a valid US Government issue photo identification and, if driving, current vehicle registration and insurance document. A background check will be conducted for all individuals requesting a pass. An email containing the full name (as it appears on their identification card) of each attendee who needs a base pass must be sent to (alice.townsend-peden@us.af.mil) no later than 2 business days prior to the scheduled visit. Participants may pick up their pass from the Visitors Center at the Division Street Gate entrance to Keesler AFB as early as 6:00 AM CT, before the site visit is scheduled. Visitors Center hours of operation are Monday - Friday 6: 00 AM - 3:00 PM. It is highly recommended to arrive at the Visitors Center at least 1 hour before the scheduled start time of the site visit as the average wait times at the Visitors Center can range from 45 - 90 minutes. The Visitor Center is normally the least busy between the hours of 6:00 AM - 9:00 AM. Please plan to get your base pass early, as we will not delay the site visit start time due to waiting on participants to get their pass.

Directions to Building 1201 from Division Street Gate: take a right on Larcher Blvd and then a left onto H Street.

All prospective Offerors are highly encouraged to attend this conference/site visit and are advised that this will be held solely for the purpose of explaining the concepts involved in the project and the specification, terms, and conditions of this solicitation. Failure of a prospective Offeror to submit any questions or attend the conference will be construed to mean that the prospective Offeror fully understands all requirements of the solicitation.

ADDENDUM TO FAR 52.215-1 INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The following paragraphs of this provision are tailored as follows, reference full text provision FAR 52.215-1 for unaltered instructions:

(c) Submission, modification, revision, and withdrawal of proposals. (1)(i) Proposals and modifications to proposals shall be:

(A) Submitted in either of the following ways:

. With the exception of the Price Proposal, Offeror Electronic proposals may be submitted via email to 81CONS.PKA.Flight@us.af.mil and alice.townsend-peden@us.af.mil shall submit electronic proposal files in PDF format.

Electronic proposal should be no more than one hundred fifty megabytes (150MB) in size. Offerors are encouraged to refrain from incorporating detailed graphic items (other than any plans or drawings) as they are not required or desired. Any scanned documents incorporated into an Offeror's proposal shall be split into multiple files so that each individual file is no more than 50MB. Each part of the proposal (Parts I, II, and III) shall be a separate file. No password-protected, zipped, or self-extracting files shall be used.

Hard copy submissions may be hand-carried or mailed to the address listed in solicitation block 8.

***It is the offeror's responsibility to verify the receipt of their proposal prior to solicitation close date and time. ***

The proposal shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but, rather, shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience and will base its evaluation on the information presented in the offeror's proposal.

Each part of the proposal shall be written on a stand-alone basis so that its content may be evaluated without cross-referencing. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. If an Offeror believes the requirements in these instructions contain an error or omission, or are otherwise unsound, the Offeror shall immediately notify the CO and Contract Specialist in writing with supporting rationale, as well as the remedies the Offeror is asking the CO to consider as related to the omission or error.

The response shall consist of three (3) separate parts, Part I - Price Proposal, Part II - Technical Proposal and Part III - Past Performance Information.

6. PART I - PRICE PROPOSAL

Factor 1: Price All pricing information shall be addressed in this part of the offer. The source selection will be conducted with the expectation of adequate price competition per FAR 15.403-2(c)(1)(i); therefore, certified cost or pricing data is not required. However, if adequate price competition does not exist or the CO cannot determine price reasonableness, the Offeror may be required to submit data other than certified cost or pricing data or certified cost or pricing data to the extent necessary for the CO to determine price reasonableness.

(a) Complete blocks 14-20C of the RFP, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through J. These sections constitute the model contract.

(b) Insert proposed unit price(s) in Section B for Contract Line-Item Number (CLIN) 0001 and CLIN 0002.

(c) The contractor shall provide a signed and completed Standard Form 1442 along with a signed copy of any amendments.

(d) Complete the necessary fill-ins and certifications in Sections B through K. Section K if this information is not in SAM.gov profile. Section I requires fill-in for 52.223-3 and 252.223-7001 if applicable.

(e) Submit bonding as specified in 52.228-1 Bid Guarantee.

7. PART II - TECHNICAL PROPOSAL:

Factor 2: Technical

(a) Use of Non-Government Advisors: The CO must ensure that before a Non-Government Advisor is given access to proprietary information, that the Government has received the consent of the submitting contractor(s) to provide access to the contractor(s) who are assisting the Government in the source selection. Therefore, the Offeror shall expressly provide its consent in the Technical Proposal, or by completing paragraph 5(b)(2) of the General Instructions, to the release of its proposal information to the companies listed in Table 1, above. Contact the CO prior to the receipt of proposals with any questions regarding participation or if there is an issue with providing consent.

Please understand that failing to provide consent may affect Offeror's ability to propose for this effort.

Individuals from the support contractors identified in Table 1, above, have signed individual non-disclosure agreements with the Government, which strictly prohibits any release or disclosure of information outside the source selection team.

(b) The offeror's technical proposal must be a Project Execution Plan, including all planned activities the offeror will use to complete the project in accordance with the Statement of Work, drawings, and specifications. The Project Execution Plan must address/include items (1) through (5) below:

(1) Construction Approach - Offeror's Construction Approach shall describe planned activities that are relevant to the specific project. The Offeror shall provide an approach that demonstrates their ability to execute all critical aspects of the construction within the performance period of the contract. Include a narrative approach detailing each anticipated phase of construction from pre-mobilization, site occupancy, repair/renovation work, quality control testing, punch list completion to project closeout.

Describe how communications with the Government will be addressed, focusing in particular on problem avoidance/resolution.

(2) Detailed construction Progress Schedule - Provide a detailed construction progress schedule on a Gantt Chart (or similar) highlighting a breakdown of the items/tasks (milestones) identified in the SOW/Specifications/Drawings and how the offeror plans on accomplishing each individual task within the performance period specified for the project. At a minimum, the project schedule itself shall visually depict and address each of the following elements:

i. Order of work elements to include project phasing

ii. Number of days for each work element

iii. Identification of Long Lead-Time Materials and their anticipated arrival and install date(s) (if applicable).

Note: The task schedule will, after contract award, be replaced with a final schedule as required by 52.236-15, Schedules for Construction Contracts.

(3) Quality Control Plan - Offeror shall submit a narrative Quality Control Plan to include the following information: plan overview, matrix of roles and responsibilities, inspections testing required associated with project, record keeping and report, and standards for materials and workmanship.

(4) Complete list of the materials needed and their quantities. All foreign materials shall be identified as such. In material listing, identify if materials are owned or leased, as applicable.

List any heavy equipment needed for the project that is 7,500 pounds or greater.

(5) Identify key personnel and subcontractors. Key personnel could include the Project Managers, Contractor Quality Control Managers (CQC Managers), Superintendents, Site Safety and Health Officers (SSHO) and any Office Administrators. For key personnel, identify certifications and experience relative to the SOW requirements by providing documentation demonstrating qualifications and experience of the proposed key personnel.

Offeror shall identify Teaming Partners and/or Key Subcontractors and describe the extent of their involvement in the project and applicable qualifications, certifications, and specialized experience. Identify the percentage of work Teaming Partners and Key Subcontractors will be performing in the project.

***Note: Do not include price or cost information in Part II. If price or cost information is included in the Technical Proposal, the proposal may be deemed unacceptable and may not be evaluated.

8. PART III - PAST PERFORMANCE INFORMATION

Factor 3: Past Performance

(a) Provide a list of no more than five (5), of the most relevant contracts performed for Federal agencies or private customers within the last three (3) years. For the purpose of this solicitation, recent contracts are defined as those on which some portion of performance occurred during the last three (3) years from date of receipt of proposal.

Relevant performance includes present/past performance effort involving similar scope, magnitude of effort and complexities of this solicitation. Only references for same or similar type contract will be acceptable. The offeror shall submit references by completing the Solicitation Attachment titled PAST PERFORMANCE REFERENCE LIST (PPRL), for contracts that you consider relevant in demonstrating your ability to perform the requirements in this solicitation.

The completed PPRL must be submitted with your offer and received by the RFP closing date and time. The offeror shall ensure that the references listed in the PPRL are provided the attachment titled PAST PERFORMANCE QUESTIONNAIRE (PPQ) for completion after the offeror completes Section A of the PPQ. If a CPAR is available for your references, annotate on the PPRL and no PPQ will be required. Completed questionnaires shall be sent by the reference completing the questionnaires directly to the Government Contract Specialist at the address shown in Block 7 of the SF 1442. THIS OFFICE STRONGLY RECOMMENDS ALL OFFERORS REQUEST THEIR REFERENCES TO SUBMIT THEIR PAST PERFORMANCEQUESTIONNAIRES IMMEDIATELY TO THE 81ST CONTRACTING SQUADRON, 81 CONS/PKA, 310 M STREET ROOM 106, KEESLER AFB, MS 39534-2147 OR EMAIL THEM TO 81CONS.PKA.Flight@us.af.mil and alice.townsend-peden@us.af.mil.

If the Offeror is referencing on their PPRL an effort in which a PPQ was previously submitted in response to another solicitation issued by Keesler AFB, please annotate this on the PPRL and the PPQ submitted previously can be used by the Contracting Office for Past Performance Evaluation.

***Note: If the contract submitted for reference is an IDIQ, only after issuance of a task order does performance occur. Given this, an individual order under the basic contract shall be submitted, in lieu of just the basic ordering contract itself. If no CPAR is available for the task order, then PPQs are required.

(b) The evaluation of Past Performance Information (PPI) will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this solicitation. The type of PPI identified within the PPRL will determine which of the remaining paragraphs apply.

(1) For PPI where the offeror was the prime contractor; comply with paragraph (c)

(2) For PPI where the offeror was a subcontractor; comply with paragraphs (c) & (d)

(3) For PPI where the offeror is using a subcontractor's PPI; comply with paragraph (c)& (e)

(4) For PPI where the offeror is part of a teaming arrangement; comply with paragraph (f)

(5) For PPI where the offeror is citing key personnel; comply with paragraph (g)

(c) Furnish the following information for each contract listed:

(1) Company name

(2) Contract number and Task Order number if applicable

(3) Contracting Agency/Customer

(4) Total Contract/Task Order Dollar Value

(5) Period of Performance (identify Task Order Period of Performance if applicable)

(6) Verified, up-to-date name, address & telephone number of the contracting officer or customer POC

(7) Description of work performed relevant to this solicitation

(8) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

(d) If offeror is using PPI from work, they performed as a subcontractor listed on the PPRL, in addition to information requested in paragraph (c) above, furnish the following information:

(1) What function(s)/task(s) did the offeror perform on the PPRL listed contract?

(2) What percentage of the total contract value did the offeror perform on the PPRL listed contract?

(3) What was the value of the subcontract on the PPRL listed contract?

(e) If using PPI from subcontractors as part of the PPRL, in addition to information requested in paragraph (c) above, furnish the following information:

(1) What function(s)/task(s) did the subcontractor perform on the PPRL listed contract?

(2) What function(s)/task(s) will the subcontractor perform on this contract?

(3) What percentage of the total contract value did the subcontractor perform on the PPRL listed contract?

(4) What percentage of the total contract value will the subcontractor perform on this contract?

(f) If a teaming arrangement is contemplated, the offerors shall provide complete information as to the arrangement, including any relevant and recent past/present performance information on previous teaming arrangements with same partner. If this is a first-time joint effort each party of the arrangement shall provide any past and present relevant contracts to be evaluated, a maximum of three relevant contracts per party. Additionally furnish the following information:

(1) What function(s)/task(s) did the party perform on the PPRL listed contract?

(2) What function(s)/task(s) will the party perform on this contract?

(g) If using PPI from key personnel as part of the PPRL, in addition to information requested in paragraph (c) above, furnish the following information:

(1) What function(s)/task(s) did the key personnel perform on the PPRL listed contract?

(2) What function(s)/task(s) would the key personnel perform on this contract?

(3) What percentage of the total contract value did the key personnel perform on the PPRL listed contract?

(4) What percentage of the total contract value will the key personnel perform on this contract?

(4) The offeror shall submit proposed pricing for all CLINs identified in the solicitation.

(d) Offer expiration date. The proposal shall remain valid through 180 days from the proposal due date.

(f) Contract Award. A single contract will be awarded for the project.

Number Attachment Name Attachment Description

L-01 Attachment L-01 MAHG25-1046 Past Performance Reference Lists Reference List

L-02 Attachment L-02 Past Performance QuestionnaireMAHG25-1046 Questionnaire

SUMMARY OF CHANGES
Contract Clauses
Instructions, Conditions, & Notices to Offerors or Quoters