Attachment 2 - MAHG251046 REPAIR REPLACE BASKETBALL FLOOR B1201 DWG.pdf

PDF 1 MB Posted

Attached to
Basketball/Racquetball Court Replacement
Solicitation number
FA301026R0009
Issued by

About this file

This is a design submittal document for a federal construction project at Keesler Air Force Base in Biloxi, Mississippi. The project involves the repair and replacement of basketball floor B1201, identified as Project Number MAHG251046 with Solicitation Number FA301026R0009. The 100% design submittal is dated December 2025 and was prepared by the 81st Civil Engineer Squadron.

The project scope includes demolition of the existing flooring and installation of modular flooring with multi-sport striping for basketball, volleyball, and pickleball, as well as racquetball striping in a separate court area. Key construction requirements mandate compliance with federal, state, and local regulations; Unified Facilities Criteria (UFC); International Building Code (IBC); Air Force Instruction (AFI); and Storm Water Pollution Prevention Plan (SWPPP) standards. The contractor must conduct comprehensive field verification of existing conditions, document baseline conditions before work begins, protect existing equipment and finishes, and immediately report any suspected asbestos. Additional requirements include removal and proper disposal of all demolished materials, installation of four 3.5-inch diameter floor sleeves with hinged brass cover plates, application of 2-inch wide polyurethane striping for basketball and volleyball courts, and 1.5-inch wide polyurethane striping for racquetball courts. The contractor bears responsibility for repairing any damage or contamination resulting from work activities at no additional cost to the government. The design documents include demolition plans, overall basketball floor plans, and detailed multi-sport and racquetball striping floor plans with precise measurements and court dimensions.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TH

IR

D S

T

FI

FT

H S

T

PROJECT LOCATION:

ISSUE DATE:

KEESLER AIR FORCE BASE BILOXI, MS

PROJECT NUMBER:

REPAIR AND REPLACE BASKETBALL FLOOR B1201

MAHG251046

DECEMBER, 2025 LEGEND

DEMOLITION

CONSTRUCTION

EXISTING

NOT IN SCOPE

1. COMPLY WITH ALL FEDERAL, STATE, LOCAL, AND AIR FORCE REGULATIONS.

2. BEFORE STARTING ANY WORK, THOROUGHLY INSPECT AND DOCUMENT THE

EXISTING CONDITIONS OF THE CONSTRUCTION AREA AND ADJACENT

PROPERTIES. THIS DOCUMENTATION WILL SERVE AS A BASELINE TO PREVENT

DISPUTES REGARDING DAMAGE POTENTIALLY CAUSED BY CONTRACT-RELATED

ACTIVITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE

OR CONTAMINATION RESULTING FROM WORK ACTIVITIES AT NO ADDITIONAL

COST TO THE GOVERNMENT.

3. CONDUCT A COMPREHENSIVE FIELD VERIFICATION OF EXISTING SITE

CONDITIONS BEFORE ANY WORK BEGINS. ALL DISCREPANCIES MUST BE

REPORTED TO THE CONTRACTING OFFICER IN WRITING IMMEDIATELY.

4. PROTECT ALL EXISTING EQUIPMENT, FURNISHINGS, AND FINISHES FROM DUST,

PAINT, AND DEBRIS.

5. PROMPTLY REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS FROM THE

PROJECT SITE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, LOCAL

LAWS AND REGULATIONS.

6. MAINTAIN A CLEAN AND ORDERLY JOB SITE AT ALL TIMES.

7. REPORT ALL MISHAPS INVOLVING AIR FORCE PERSONNEL, PROPERTY, OR

EQUIPMENT TO THE CONTRACTING OFFICER.

8. IF PERSONNEL ENCOUNTER SUSPECTED ASBESTOS, STOP WORK IMMEDIATELY

AND NOTIFY THE CONTRACTING OFFICER.

9. IF ASBESTOS IS IDENTIFIED, SUBMIT REQUIRED ASBESTOS MANAGEMENT

DOCUMENTATION INCLUDING CERTIFICATIONS, WORK PLANS, AND STATE

CERTIFICATIONS.

10. PROVIDE HAZARDOUS MATERIALS LIST, QUANTITIES, AND SAFETY DATA

SHEETS TO CONTRACTING OFFICER BEFORE WORK BEGINS.

11. GOVERNMENT PROVIDED AS-BUILTS ARE FOR REFERENCE ONLY.

12. ALL WORK MUST CONFORM TO THE LATEST VERSIONS OF:

· UNIFIED FACILITIES CRITERIA (UFC)

· STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

· INTERNATIONAL BUILDING CODE (IBC)

· AIR FORCE INSTRUCTION (AFI)

· APPLIED BEHAVIOR ANALYSIS (ABA)

GENERAL NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

ST

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N

L

ST

R

EE

T

B4

BI

LO

XI

, M S

AN

SI

D

SHEET ID

C O

VE

R

S H

EE

T

PR

O

JE

C

T N

U M

BE

R

: M

AH

G

R

EP

AI

R

A N

D R

EP

LA

C E

BA

SK

ET

BA

LL

F

LO

O

R B

0%

D

ES

IG

N

S U

BM

IT

TA

L

G-001

J.

C

LE

VE

LA

N

D

G .R

EE

D

M .T

AN

N

ER

M .P

IN

KN

EY

D

EC

EM

BE

R

, 2

AHJ AUTHORITY HAVING JURISDICTION

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

°C DEGREES CELSIUS

CFM CUBIC FEET PER MINUTE

CO2 CARBON DIOXIDE

DOC DIRECT DIGITAL CONTROL

DOD DEPARTMENT OF DEFENSE

°F FAHRENHEIT

FPM FEET PER MINUTE

FT FEET

FT² SQUARE FEET

GPM GALLONS PER MINUTE

HVAC HEATING VENTILATING AND AIR CONDITIONING

HZ HERTZ

ICC INTERNATIONAL CODE COUNCIL

IR INFRARED

KJ KILOJOULE

KM KILOMETER

KW KILOWATT

L LITERS

LCCA LIFE CYCLE COST ANALYSIS

M METERS

OC ON CENTER

STD STANDARD

UL UNDERWRITERS LABORATORIES

VAV VARIABLE AIR VOLUME

W WATTS

ABBREVIATIONS

Sheet List Table

SHEET NUMBER SHEET TITLE

GENERAL

G-001 COVER SHEET

ARCHITECTURAL

AD-100 DEMOLITION PLAN

A-100 OVERALL BASKETBALL FLOOR PLAN

A-102 MULTI-SPORT STRIPING FLOOR PLANS

A-103 RACQUETBALL STRIPING FLOOR PLAN

Attachement 2

FA301026R0009

STRETCH

ROOM

CARDIO

ROOM

MECH

FAMILY

WORKOUT

ROOM

CIRCUIT

ROOM

WEIGHT

ROOM

MECH

WEIGHT

ROOM

GYMNASIUM

LOBBY

RECEPTION

LAUNDRY

JANITOR

STORAGE

GENERAL

OFFICE

OFFICE

107A

FAMILY RR

WOMEN'S

MEN'S

RESTROOMS

WOMEN'S

PRIVATE

LOCKER

WOMEN'S

LOCKERS

MEN'S

SAUNA

ADA RR

MEN'S

SHOWER

ADA RR

WOMEN'S

RESTROOMS

WOMEN'S

SAUNA

WOMEN'S

SHOWER

MEN'S

PRIVATE

LOCKERS

MEN'S

LOCKERS

CORRIDOR

COURT #4

COURT #5

STORAGE

SCALE: 3/32" = 1'-0"

DEMOLITION PLAN1

LEGEND

DEMOLITION

CONSTRUCTION

EXISTING

NOT IN SCOPE

108'-1"

'-1

0"

102'-5"

3' -9

'-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

ST

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N

L

ST

R

EE

T

B4

BI

LO

XI

, M S

AN

SI

D

SHEET ID

D

EM

O

LI

TI

O

N P

LA

N

PR

O

JE

C

T N

U M

BE

R

: M

AH

G

R

EP

AI

R

A N

D R

EP

LA

C E

BA

SK

ET

BA

LL

F

LO

O

R B

D

ES

IG

N

S U

BM

IT

TA

L

AD-100

J.

C

LE

VE

LA

N

D

G . R

EE

D

M . T

AN

N

ER

M . P

IN

KN

EY

D

EC

EM

EB

R

, 2

20'-0"20'-0"

'-1

1"

'-1

1"

KEYNOTES

1. REMOVE EXISTING FLOORING IN ITS ENTIRETY.

5'-8"

BASE BID

BID OPTION

GYMNASIUM

GENERAL

OFFICE

OFFICE

107A

GYMNASIUM

GENERAL

OFFICE

OFFICE

107A

VOLLEYBALL NET VOLLEYBALL NET

108'-1"

'-4

FLOOR SLEEVE

FLOOR SLEEVE FLOOR SLEEVE

FLOOR SLEEVE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

ST

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N

L

ST

R

EE

T

B4

BI

LO

XI

, M S

AN

SI

D

SHEET ID

O

VE

R

AL

L

BA

SK

ET

BA

LL

F

LO

O R

P

LA

N

PR

O

JE

C

T N

U M

BE

R

: M

AH

G

R

EP

AI

R

A N

D R

EP

LA

C E

BA

SK

ET

BA

LL

F

LO

O

R B

0%

D

ES

IG

N

S U

BM

IT

TA

L

A-100

J.

C

LE

VE

LA

N

D

G . R

EE

D

M . T

AN

N

ER

M . P

IN

KN

EY

D

EC

EM

BE

R

, 2

SCALE: 3/16" = 1'-0"

MULTI-SPORT STRIPING FLOOR PLAN1

102'-5"

'-1

5'-8"

KEYNOTES

1. PROVIDE AND INSTALL MODULAR FLOORING AND ALL STRIPING ACCORDING

TO MANUFACTURER'S WRITTEN INSTRUCTIONS. ALL STRIPING SHALL BE 2"

WIDE AND POLYURETHANE APPLIED.

2. PROVIDE AND INSTALL FOUR (4) 3-1/2" DIAMETER FLOOR SLEEVES WITH

HINGED BRASS COVER PLATES INTO EXISTING CORE-DRILLED HOLES OF

CONCRETE SLAB. SET SLEEVES FLUSH WITH FINISHED FLOOR AND SECURE

WITH NON-SHRINK GROUT.

FOR REFERENCE ONLY

LEGEND

BASKETBALL STRIPING (BLUE)

VOLLEYBALL STRIPING (RED)

PICKLEBALL STRIPING (BROWN)

22 2 2

3' -9

GYMNASIUM

OFFICE

107A

GYMNASIUM

OFFICE

107A

GYMNASIUM

OFFICE

107A

VOLLEYBALL NET VOLLEYBALL NET FLOOR SLEEVE FLOOR SLEEVE FLOOR SLEEVE FLOOR SLEEVE

SCALE: 3/32" = 1'-0"

PICKLEBALL STRIPING PLAN1SCALE: 3/32" = 1'-0"

BASKETBALL STRIPING PLAN3

SCALE: 3/32" = 1'-0"

VOLLEYBALL STRIPING PLAN2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

ST

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N

L

ST

R

EE

T

B4

BI

LO

XI

, M S

AN

SI

D

SHEET ID

M U

LT

I-S

PO

R

T

ST

R

IP

IN

G

P

LA

N S

PR

O

JE

C

T N

U M

BE

R

: M

AH

G

R

EP

AI

R

A N

D R

EP

LA

C E

BA

SK

ET

BA

LL

F

LO

O

R B

0%

D

ES

IG

N

S U

BM

IT

TA

L

A-102

J.

C

LE

VE

LA

N

D

G . R

EE

D

M . T

AN

N

ER

M . P

IN

KN

EY

D

EC

EM

BE

R

, 2

FOR REFERENCE ONLY

LEGEND

BASKETBALL LINES (BLUE STRIPING)

VOLLEYBALL LINES (RED STRIPING)

PICKLEBALL LINES (BROWN STRIPING)

30'-0" TYP.

'-0

" T

YP

'-0

" T

YP

'-0 " T

YP

'-0

" T

YP

'-0 " T

YP

94'-5"

'-0

'-0

" T

YP

20'-0" TYP.

'-0

" T

YP

'-0 " T

YP

'-0

" T

YP

10'-0" TYP. 10'-0" TYP.

'-0

47'-3" 47'-3"

11'-11"

3'-10" 20'-0" 7'-3" 6'-0" 7'-3" 3'-10"

24'-3" 11'-11"

'-8

3'-0" TYP.

'-0

'-3

14'-0"

5' -8

5'

-8

'-9

'-7

COURT #4

COURT #5

'-1

1"

20'-0"

'-1

1"

20'-0"

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KE

ES

LE

R

A

IR

F O

R C

E

BA

SE

B

IL

O

XI

, M

IS

SI

SS

IP

PI

ST

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N

L

ST

R

EE

T

B4

BI

LO

XI

, M S

AN

SI

D

SHEET ID

R

AC

Q U

ET

BA

LL

S

TR

IP

IN

G

F

LO

O R

P

LA

N

PR

O

JE

C

T N

U M

BE

R

: M

AH

G

R

EP

AI

R

A N

D R

EP

LA

C E

BA

SK

ET

BA

LL

F

LO

O

R B

0%

D

ES

IG

N

S U

BM

IT

TA

L

A-103

J.

C

LE

VE

LA

N

D

G . R

EE

D

M . T

AN

N

ER

M . P

IN

KN

EY

D

EC

EM

BE

R

, 2

SCALE: 3/8" = 1'-0"

RACQUETBALL STRIPING FLOOR PLAN1

KEYNOTES

1. INSTALL RACQUETBALL FLOORING AND ALL STRIPING ACCORDING TO

MANUFACTURER'S WRITTEN INSTRUCTIONS. ALL STRIPING SHALL BE 1 1/2" WIDE

AND BE POLYURETHANE APPLIED.

FOR REFERENCE ONLY

LEGEND

RACQUETBALL STRIPING (RED)

Sheets and Views
G-001 COVER SHEET
G-001
AD-100 DEMOLITION PLAN
AD-100(2)
A-100 OVERALL BASKETBALL FLOOR PLAN
A-100
A-102 MULTI-SPORT STRIPING FLOOR PLANS
A-102(2)
A-102(3)
A-102(4)
A-103 RACQUETBALL STRIPING FLOOR PLAN
A-103

File details come from the government source that posted it. Updated .