Questions and Answers_20 Aug 2025.pdf
PDF 474 KB Posted
- Solicitation number
- FA301025Q0010
About this file
This document is a Questions and Answers (Q&A) document for a Commercial Wireless Internet Services contract at Keesler Air Force Base, solicitation number FA301025Q0010. The document is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for wireless internet services, with a seed project location of approximately 140,000 square feet spanning two floors. Key technical requirements include mandatory wireless coverage across all sites, seamless roaming, dual-band wireless capabilities, and no user latency. The vendor must provide all connectivity equipment, utilize existing OM3 fiber, install Cat 6 cabling, and design the system with 10% growth scalability.
The solicitation specifies that the wireless system will cover interior spaces with block/brick/stucco exterior and drywall/block/metal stud interior walls, with 10-12 foot ceilings. Specific exclusions include parking garages, elevator shafts, and stairwells. The existing environment has some AFNET wireless in some locations, but a comprehensive new solution is required. The vendor has flexibility in designing the wireless network topology, with decisions about redundancy, wireless LAN controllers, and specific technical details left to the vendor's solution. The contract anticipates awarding in August 2025, with the exact service address to be provided at the time of award.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Keesler Air Force Base Commercial Wireless Internet Services (FA301025Q0010) Q&A Version 1
20 Aug 2025
Question # Date Received Question Response 1 20 Aug 25 What is the Service Address for this
Location(s)?
The address will be provided at the time of award.
2 20 Aug 25 Total # site/location(s) to be serviced by this wireless system?
This is an indefinite delivery/indefinite quantity contract. There is no total number of sites/locations to be serviced at this time.
3 20 Aug 25 Are DETAILED floorplans/elevations available which show interior/exterior elements (CAD)?
If you need copies of the floor plans please email stacey.zawalski.1@us.af.mil.
4 20 Aug 25 Can you provide a copy of the detailed floor plans?
No, the floor plans there is only one version of floor plans being offered.
5 20 Aug 25 If no floorplans/elevations are available, do we know dimensions of each space to be services by wireless, and distances between adjacent spaces?
The seed project building approximate dimensions are 400 feet by 175 feet. There are no other dimensions available at this time.
6 20 Aug 25 Can pictures from various angles be obtained for context within the spaces?
No
7 20 Aug 25 If known, what is the construction material of the main (and internal) structure of each site/location(s)?
Block/Brick/Stucco exteriors with drywall/block/metal stud interior walls.
8 20 Aug 25 How many floors comprise each site/location(s)?
This is an indefinite delivery/indefinite quantity contract. There is no total number of sites/locations to be serviced at this time. The seed project location is two floors.
9 20 Aug 25 What is the height of each floor (floor to ceiling)?
10 to 12 foot ceilings
10 20 Aug 25 Are there limitations to AP placement in terms of ceiling, or walls (AP orientation)?
See IDIQ PWS paragraph 2.7.1.
11 20 Aug 25 Square footage (estimate) of each site?
This is an indefinite delivery/indefinite quantity contract. There is no total number of sites/locations to be serviced at this time. The square footage of the seed project is approximately 140,000 square feet.
12 20 Aug 25 Are any location(s) outdoors? This is an indefinite delivery/indefinite quantity contract. Not all locations/facilities are identified at this time.
13 20 Aug 25 Is any location(s) a warehouse, or industrial space (office space is assumed default)?
This is an indefinite delivery/indefinite quantity contract. Not all locations/facilities are identified at this time.
14 20 Aug 25 Is wireless service mandatory across all site/location(s)?
Yes, this requirement is specifically for commercial wireless internet services.
15 20 Aug 25 Are areas such as parking garages, elevator shafts and stairwells excluded from planned coverage?
Yes, these would be excluded.
16 20 Aug 25 Please note the presence and location of heavy equipment which may affect the RF domain (e.g. heavy 3 phase electric motors, Microwave ovens, CB/radio transmissions which operate directly within or adjacent the 2.4 and 5 GHz. spectrum).
This is unknown.
17 20 Aug 25 Total # endpoint wired and wireless devices at each site (if possible)? (e.g. PC’s, laptops, tablets, phones, printers)
This will vary according to each site.
18 20 Aug 25 Are current/future wireless endpoint clients dual band capable (2.4 and 5 GHz.), or single band (default is dual band)?
Dual Band where possible, single band where necessary.
19 20 Aug 25 Is seamless roaming required across all site/location(s)?
Yes, seamless roaming is required.
20 20 Aug 25 Is there any expectation for a given throughput level per wireless client type (e.g. phones must pass at least 11 Mbps.
across the campus)
The expectation is for no latency for users.
21 20 Aug 25 Is priority to be given to a specific set of users, groups, or devices?
No priority users are presently planned.
22 20 Aug 25 Will wayfinding (interactive) be required (e.g. location analytics based on BlueTooth Low Energy)?
No, wayfinding is not planed.
23 20 Aug 25 Is a wireless network already in place? If so, please specify SSID, VLAN/Subnet info (if available).
There is presently AFNET wireless in some locations but not all.
Existing wireless network information will be provided upon contract award.
24 20 Aug 25 Will new router(s) or security appliances be required? If not, what is the make/model/software version of router(s) or security appliances at each site?
Vendor is to provide all connectivity equipment.
25 20 Aug 25 Is a physical Wireless LAN Controller currently employed? If so, what is the make/model/software version?
Vendor is to provide all connectivity equipment per their solution.
26 20 Aug 25 Will new PoE switches be required? If not, what is the make/model/software version of existing switches at each site?
No, this is wireless capability only. No PoE necessary unless required by vendor solution.
27 20 Aug 25 Are features such as PoE+, UPoE, or mGig required?
No.
28 20 Aug 25 What is the transport type and bandwidth of circuit(s) planned for these site/location(s) to carry wireless traffic?
Transport type and bandwidth will vary according to site requirements.
29 20 Aug 25 Is cutting edge throughput such as 802.11ax, 802.11ac Wave 2, or the maximum available spatial streams required for Access Points?
Vendor to provide necessary spatial streams to prevent latency at each site.
30 20 Aug 25 Are there aesthetic limitations imposed by the environment which could impact AP selection (e.g. historical building, no AP’s with external antennae will be cosmetically acceptable)?
All connectivity equipment will be interior, ceiling contained and wired to the existing communications rooms.
31 20 Aug 25 Is a network diagram currently available? Vendor to provide network diagram per their solution.
32 20 Aug 25 Are chases, cable pulls in conduit, plenum spaces, hand holds and access hatches accessible?
Access to plenum and ceilings is available. No other access is required.
33 20 Aug 25 Does any structured cabling cross, or run through areas known, or suspected to carry Asbestos or other hazardous material?
No asbestos or hazardous material is known to exist. If suspected, testing is available to confirm non-hazardous environment.
34 20 Aug 25 Category 5 structured cabling is a minimum requirement; Cat 5e and 6a are highly recommended. What does the copper infrastructure currently consist of at each site/location(s)?
All cabling is required to be Cat 6. No existing copper infrastructure is to be used by the vendor.
35 20 Aug 25 Where is the main wiring closet (MDF), and any intermediary wiring closets (IDF’s) in relation to the desired coverage spaces?
This will vary according to the site.
36 20 Aug 25 Are all patch cords being supplied by the customer?
No equipment other than building to building connectivity via government fiber is being provided.
37 20 Aug 25 How are site/location(s) to be interconnected (e.g. Single-mode fiber is in place, OM3 or OM4 Multimode fiber is being installed, or RF backhaul/mesh is required)?
Existing OM3 fiber is to be utilized.
38 20 Aug 25 Is PoE switching redundancy required for each site (e.g. stacking)?
This is to be decided by the vendor solution.
39 20 Aug 25 If employing a physical WLC (versus Cloud managed, e.g. Meraki), does the customer require redundancy for new system?
This is to be decided by the vendor solution.
40 20 Aug 25 Do UPS’s need to be proposed for supporting the new system components?
No, UPSs are not necessary.
41 20 Aug 25 % of planned system growth/scalability customer requires from the design
10% growth is desired.