Attachment 16 - Electrical Drawings E2.0 - Rev2.pdf
PDF 263 KB Posted
- Attached to
- Repair Well #10 Federal contract opportunity
- Solicitation number
- FA301024R0013
About this file
This document is an electrical drawing attachment (Attachment 16 - Electrical Drawings E2.0 - Rev2.pdf) for a federal contract opportunity to Repair Well #10 at Keesler Air Force Base.
The key requirements outlined in the drawing include the contractor providing 4#4/0 CU, #6 GND in 2" EMT or RMC conduit, coordinating a utility transformer shutdown with the government and utility provider, installing a Cummins (or approved equal) 480V 200A 3-phase automatic transfer switch with delayed transition and bypass isolation, and providing a 150kW 480V 3-phase Cummins (or approved equal) standby generator capable of handling the inrush current. The generator system must comply with specific military standards. The contractor is also required to provide redline as-built drawings.
The related federal contract opportunity is Solicitation Number FA301024R0013 for the Repair of Well #10, a construction project estimated between $250,000 and $500,000, being issued as a total small business set-aside. The site visit for this opportunity is scheduled for August 12, 2024.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR TO PROVIDE 4#4/0 CU, #6 GND IN 2" EMT OR RMC CONDUIT.
CONTRACTOR TO COORDINATE SHUTDOWN OF UTILITY TRANSFORMER
WITH GOVERNMENT AND CITY LIGHT & POWER. CONTRACTOR SHALL FILE
PAPERWORK TO REQUEST SHUTDOWN 3 WEEKS PRIOR TO STARTING
CONSTRUCTION ON ELECTRICAL SYSTEM.
CUMMINS (OR APPROVED EQUAL) AUTOMATIC TRANSFER SWITCH (ATS)
SHALL BE 480V 200A 3 PHASE WITH A SWITCHED NEUTRAL. ATS SHALL BE
DELAYED TRANSITION AND HAVE BYPASS ISOLATION FOR MAINTENANCE.
ATS SHALL BE MINIMUM NEMA 3R RATED FOR OUTDOOR USE. ATS SHALL
HAVE A SURGE PROTECTOR DEVICE CONNECTED TO UTILITY SOURCE.
CUMMINS (OR APPROVED EQUAL) PERMANENT STANDBY GENERATOR
SHALL BE 150KW 480V 3 PHASE WYE GROUNDED CAPABLE OF HANDLING
THE INRUSH CURRENT OF EXISTING AND NEW EQUIPMENT. GENERATOR
SHALL BE MINIMUM NEMA 3R RATED FOR OUTDOOR USE. GENERATOR
SHALL BE SEPARATELY DERIVED SYSTEM. GENERATOR SHALL HAVE A
SURGE PROTECTOR DEVICE. CONTRACTOR TO PROVIDE ALL NECESSARY
GROUNDING, BONDING AND ACCESSORIES FOR A COMPLETE AND
FUNCTIONAL SYSTEM. GENERATOR SYSTEM SHALL COMPLY WITH AFI
32-1062 AND UFC 3-540-01.
CONTRACTOR TO PROVIDE REDLINE AS-BUILT SINGLE LINE DIAGRAM WITH
MISSING CONDUIT, CONDUCTOR, AND DISCONNECT FUSE SIZES AND
CORRECT DIAGRAM LAYOUT.
DEMOLITION SCOPE
D a t e
D e s c r i p t i o n
D a t e
D r a w n
B y
R o s s
L a n d g r a v e
K E
E S
L E
R
A
I R
F
O R
C E
B
A S
E
M
S
Drawing No.
D e s i g n e d
B y
T e r r y
W e l a n d e r
A p p r o v e d
B y
R e n e
R o d r i g u e z
R e v i e w e d
B y
G e o r g e
R e e d
M a r k
A p p r
V
L
E
N G
I N
E E
R
S
Q U
A D
R O
N
Facility
I.D.
ofSheet
P R
O J E
T
N
O
M
A Y
M A
H G
R e p a i r
W e l l
B
W e l l
E
D
U
C
A
T
I
O
N
C
O
M
M
A
N
D
A
I
R
T
R
A
I
N
I
N
G
E2.0
CIRCUIT BREAKER
MOTOR
4 SURGE PROTECTOR DEVICE
R e v i s i o n
R
T L
TRANSFORMER
FUSED SAFETY SWITCH
XXXAF FRAME SIZE
XXXAT FUSE TRIP RATING
R e v i s i o n
R
T L
Attachment 16
FA301024R0013
| Sheets and Views |
| MAHG231035 B7301 Well 10 ADD1-E2.0 (2) |
File details come from the government source that posted it. Updated .