Attachment 7 - MSS.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Repair Well #10 Federal contract opportunity
Solicitation number
FA301024R0013
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a Material Submittals Schedule for a federal contract opportunity titled "Repair Well #10" with Solicitation Number FA301024R0013. The contract is being issued by the Department of the Air Force Air Education and Training Command as a total small business set-aside, with an estimated value between $250,000 and $500,000.

The schedule outlines the required material submittals for the project, including a HAZMAT questionnaire, MSDS, reporting forms, recycling/landfill report, manufacturer's warranties, and technical data for major equipment such as the diesel generator, automatic transfer switch, water lubricated turbine pump, pump controls, and chlorination equipment. The due dates for the various submittals range from 5 days prior to the end of the contract. An organized site visit is scheduled for August 12, 2024. Funds are not presently available, and the government reserves the right to cancel the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Well #10, newest first.
File Type Posted
Solicitation Amendment FA301024R00130004 SF 30.pdf PDF
Solicitation Amendment FA301024R00130003 SF 30.pdf PDF
Attachment 17 - Additional Questions and Answers (2).pdf PDF
Solicitation Amendment - FA301024R00130003.pdf PDF
Solicitation Amendment - FA301024R00130002.pdf PDF
Solicitation Amendment FA301024R00130002 SF 30.pdf PDF
Attachment 16 - Electrical Drawings E2.0 - Rev2.pdf PDF
Attachment 15 - Additional Question and Answer 26Aug.pdf PDF
Attachment 14- Questions and Answers.pdf PDF
Solicitation Amendment - FA301024R00130001.pdf PDF
Solicitation Amendment FA301024R00130001 SF 30.pdf PDF
Attachment 13- Addendum 1.pdf PDF
Attachment 4 - Generator Scope Details Rev.1, 19Aug2024.pdf PDF
Attachment 3 - Electrical Drawings Rev1- 19Aug2024.pdf PDF
Sign In Sheet 12 August 2024.pdf PDF
Attachment 4 - Generator Scope.pdf PDF
Attachment 1- SOW.pdf PDF
Attachment 12 - Brand Name Justification.pdf PDF
Attachment 9 - Submittal Procedure.pdf PDF
Attachment 2 - Specifications.pdf PDF
Solicitation - FA301024R0013.pdf PDF
Attachment 11- Past Performance Questionnaire.pdf PDF
Attachment 3 - Electrical Drawings.pdf PDF
Attachment 8 - Wage Determination.pdf PDF
Attachment 5- As Built Well.pdf PDF
Attachment 6 - AFI 32-1065.pdf PDF
Attachment 10 - Past Performance Reference List.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG 23-1035Project Title:
REPAIR WELL #10Solicitation / Contract Number:

FA301024R0013

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1HAZMAT QuestionaireXX5 DAYS PRIOR
2HAZMAT MSDSX5 DAYS PRIOR
3HAZMAT Reporting Entry FormXX5 DAYS PRIOR
4HAZMAT Reporting Entry FormXXEND OF CONTRACT
5Recycling and Landfill ReportXXEND OF CONTRACT
6Warranty (Manufacturer's)XEND OF CONTRACT
71-Year Warranty (Contractor's)XEND OF CONTRACT
8Cummins Onan Diesel GeneratorXXXXXXXX14 DAYS BEFORE MANUFACTURE
9Automatic Transfer Switch- 200AXXXX14 DAYS PRIOR
10Water Lubricated Turbine PumpXXXXXX14 DAYS PRIOR
11Pump ControlsXXXXXX14 DAYS PRIOR
12Complete Chlorination EquipmentXXXXXX14 DAYS PRIOR

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N