Attachment 3 - Electrical Drawings.pdf
PDF 310 KB Posted
- Attached to
- Repair Well #10 Federal contract opportunity
- Solicitation number
- FA301024R0013
About this file
This document appears to be a set of electrical drawings for Repair Well #10 at Keesler Air Force Base in Mississippi, associated with the federal contract opportunity FA301024R0013. The drawings show the demolition and replacement scope for the generator, electrical equipment, and associated systems for the well facility. Key details include the requirement for a 150kW 480V 3-phase generator, an automatic transfer switch, and replacement of the well pump and chlorine pump. The contract opportunity is a small business set-aside with an estimated value between $250,000 and $500,000. An organized site visit is scheduled for August 12, 2024, and proposals are due at a later date, though funding is not currently available. The Department of the Air Force's Air Education and Training Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G A
L A
X Y
S
T
D a t e
D e s c r i p t i o n
D a t e
D r a w n
B y
R o s s
L a n d g r a v e
K E
E S
L E
R
A
I R
F
O R
C E
B
S
E
M
S
Drawing No.
D e s i g n e d
B y
T e r r y
W e l a n d e r
A p p r o v e d
B y
R e n e
R o d r i g u e z
R e v i e w e d
B y
G e o r g e
R e e d
M a r k
A p p r
V
L
N G
I N
E E
R
S
Q U
A D
R O
N
Facility
I.D.
ofSheet
P R
O J E
M
M A
H G
R e p a i r
W e l l
B
W e l l
E
D
U
C
A
T
I
O
N
C
O
M
M
A
N
D
A
I
R
T
R
A
I
N
I
N
G
REPAIR WELL #10
KEESLER AFB, MISSISSIPPI
WELL #10 - BUILDING 7301
MAHG 23-1035
T1.0
W
N
E
S
E
D
U
C
A
T
I
O
N
C
O
M
M
A
N
D
A
I
R
T
R
A
I
N
I
N
G
FA301024R0013
Attachment 3
W
E
S
D a t e
D e s c r i p t i o n
D a t e
D r a w n
B y
R o s s
L a n d g r a v e
K E
E S
L E
R
A
R
S
E
M
S
Drawing No.
D e s i g n e d
B y
T e r r y
W e l a n d e r
A p p r o v e d
B y
R e n e
R o d r i g u e z
R e v i e w e d
B y
G e o r g e
R e e d
M a r k
A p p r
V
G
I N
E E
R
S
Q U
A D
R O
N
Facility
I.D.
ofSheet
P R
O J E
M A
H G
R e p a i r
W e l l
B
W e l l
E
D
U
C
A
T
I
O
N
C
O
M
M
A
N
D
A
I
R
T
R
A
I
N
I
N
G
E1.0
GENERATOR
DIESEL
TANK
B7301
WELL #10
TRANSFORMER
T-67-7301
DISCONNECT SWITCH
ATS
DEMOLISH EXISTING GENERATOR, ASSOCIATED ACCESSORIES, CONDUIT
AND CONDUCTORS. REPLACE WITH NEW GENERATOR IN SAME LOCATION.
DEMOLISH EXISTING DISCONNECT SWITCH. PATCH ANY HOLES FROM
REMOVING DISCONNECT SWITCH.
DEMOLISH EXISTING AUTOMATIC TRANSFER SWITCH (ATS) AND REPLACE
WITH NEW ATS IN SAME LOCATION.
RE-USE EXISTING DIESEL TANK AND PROVIDE ANY NEW EQUIPMENT OR
PIPING NEEDED FOR FUNCTIONAL AND SAFE FUEL PUMP SYSTEM.
DEMOLISH EXISTING WELL PUMP AND REPLACE IN KIND WITH NEW PUMP.
DEMOLISH EXISTING CHLORINE PUMP AND REPLACE IN KIND WITH NEW
PUMP.
WELL PUMP
FLUORIDATION
SYSTEM
CHLORINE PUMP
CHECK VALVE
AIR RELIEF
CHLORINE TANKS
REGULATOR
CONCRETE PILLAR
240V HEATER
GENERATOR SWITCH
TRANSFORMER
CIRCUIT BREAKER
DISCONNECT SWITCH
PUMP MOTOR
STARTER
MAIN DISCONNECT
WINDOW
CONTRACTOR TO PROVIDE 4#4/0 CU, #6 GND IN 2" EMT OR RMC CONDUIT.
CONTRACTOR TO COORDINATE SHUTDOWN OF UTILITY TRANSFORMER
WITH GOVERNMENT AND CITY LIGHT & POWER. CONTRACTOR SHALL FILE
PAPERWORK TO REQUEST SHUTDOWN 3 WEEKS PRIOR TO STARTING
CONSTRUCTION ON ELECTRICAL SYSTEM.
AUTOMATIC TRANSFER SWITCH (ATS) SHALL BE 480V 200A 3 PHASE WITH
A SWITCHED NEUTRAL. ATS SHALL BE DELAYED TRANSITION AND HAVE
BYPASS ISOLATION FOR MAINTENANCE. ATS SHALL BE SERVICE
ENTRANCE RATED. ATS SHALL BE MINIMUM NEMA 3R RATED FOR
OUTDOOR USE. ATS SHALL HAVE A SURGE PROTECTOR DEVICE
CONNECTED TO UTILITY SOURCE.
PERMANENT STANDBY GENERATOR SHALL BE 150KW 480V 3 PHASE WYE
GROUNDED CAPABLE OF HANDLING THE INRUSH CURRENT OF EXISTING
AND NEW EQUIPMENT. GENERATOR SHALL BE MINIMUM NEMA 3R RATED
FOR OUTDOOR USE. GENERATOR SHALL BE SEPARATELY DERIVED
SYSTEM. GENERATOR SHALL HAVE A SURGE PROTECTOR DEVICE.
CONTRACTOR TO PROVIDE ALL NECESSARY GROUNDING, BONDING AND
ACCESSORIES FOR A COMPLETE AND FUNCTIONAL SYSTEM. GENERATOR
SYSTEM SHALL COMPLY WITH AFI 32-1062 AND UFC 3-540-01.
1 1
DEMOLITION SCOPE
D a t e
D e s c r i p t i o n
D a t e
D r a w n
B y
R o s s
L a n d g r a v e
K E
E S
L E
R
A
R
S
E
M
S
Drawing No.
D e s i g n e d
B y
T e r r y
W e l a n d e r
A p p r o v e d
B y
R e n e
R o d r i g u e z
R e v i e w e d
B y
G e o r g e
R e e d
M a r k
A p p r
V
G
I N
E E
R
S
Q U
A D
R O
N
Facility
I.D.
ofSheet
P R
O J E
M A
H G
R e p a i r
W e l l
B
W e l l
E
D
U
C
A
T
I
O
N
C
O
M
M
A
N
D
A
I
R
T
R
A
I
N
I
N
G
E2.0
CIRCUIT BREAKER
MOTOR
SURGE PROTECTOR DEVICE
| Sheets and Views |
| MAHG231035 B7301 Well 10-T1.0 |
| MAHG231035 B7301 Well 10-E1.0 |
| MAHG231035 B7301 Well 10-E2.0 |
File details come from the government source that posted it. Updated .