This document contains Questions and Answers related to the Repair Well #10 federal contract opportunity, Solicitation Number FA301024R0013. The key details are:

Both Phase 1 and Phase 2 of the project will be awarded under one contract with one Period of Performance, if the project is funded. The solicitation is a total small business set-aside, with a magnitude between $250,000 and $500,000. The generator scope includes removing and installing a new Automatic Transfer Switch (ATS) in the same outside location. The existing 500-gallon fuel tank may be reused if it can adequately supply the new generator for 72 hours, otherwise it must be replaced. The exterior equipment must be NEMA 3R rated. A site visit is scheduled for August 12, 2024, and the solicitation will not be awarded until funds are available. The document also references related electrical drawings and contract clauses.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Well #10, newest first.
File Type Posted
Solicitation Amendment FA301024R00130004 SF 30.pdf PDF
Solicitation Amendment FA301024R00130003 SF 30.pdf PDF
Attachment 17 - Additional Questions and Answers (2).pdf PDF
Solicitation Amendment - FA301024R00130003.pdf PDF
Solicitation Amendment - FA301024R00130002.pdf PDF
Solicitation Amendment FA301024R00130002 SF 30.pdf PDF
Attachment 16 - Electrical Drawings E2.0 - Rev2.pdf PDF
Attachment 15 - Additional Question and Answer 26Aug.pdf PDF
Solicitation Amendment - FA301024R00130001.pdf PDF
Solicitation Amendment FA301024R00130001 SF 30.pdf PDF
Attachment 13- Addendum 1.pdf PDF
Attachment 4 - Generator Scope Details Rev.1, 19Aug2024.pdf PDF
Attachment 3 - Electrical Drawings Rev1- 19Aug2024.pdf PDF
Sign In Sheet 12 August 2024.pdf PDF
Attachment 3 - Electrical Drawings.pdf PDF
Attachment 8 - Wage Determination.pdf PDF
Attachment 5- As Built Well.pdf PDF
Attachment 11- Past Performance Questionnaire.pdf PDF
Attachment 6 - AFI 32-1065.pdf PDF
Attachment 10 - Past Performance Reference List.pdf PDF
Attachment 7 - MSS.xlsx XLSX spreadsheet
Attachment 4 - Generator Scope.pdf PDF
Attachment 1- SOW.pdf PDF
Attachment 12 - Brand Name Justification.pdf PDF
Attachment 9 - Submittal Procedure.pdf PDF
Attachment 2 - Specifications.pdf PDF
Solicitation - FA301024R0013.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAHG231035 Repair Well #10 Pre-Bid Questions and Answers

15 August 2024

1. Are both Phase 1 and Phase 2 being awarded?

Both Phase 1 and Phase 2 will be awarded under one contract and one Period of Performance (PoP) if the project is funded.

2. Generator Scope Detail 1.1 A calls to remove and install the ATS inside Bldg 7310 and

1.2.1 B Calls to provide and install new ATS outside of the building is this correct?

The ATS is located outside the building 7301.

Remove existing ATS and install new ATS in same location outside.

Please see the Addendum #1.

3. The Generator Scope Detail 4.1.1 calls out a 1350 Gallon Main Tank are there any other requirements for the tank other than the size

Contractor to verify existing 500-gallon tank is sufficient to supply new generator with diesel to run for approximately 72 hours. If re-using tank, provide any hardware, plumbing, or pumps for fully functional tank and fuel delivery system. If tank is too small, replace in kind with tank with adequate capacity.

Please see the Addendum #1.

4. Will the exterior equipment be 4x or NEMA 3R rated?

NEMA 3R.

5. Will you incorporate one line field drawing attached on your E2.0 to meet NEC and KAFB requirements?

See Attachment 3 - Electrical Drawings Rev. 1, 19 Aug 2024.

6. With the given tank size in the RFP is there a requirement to calculate 72 hr. run time?

Yes, to calculating 72 hour run time. See answer to question #3.

7. Will the generator require a pad for the new enclosure?

No.