This document contains questions and answers related to a federal contract opportunity for a Land Mobile Radio (LMR) Repeater Site at Keesler Air Force Base. The contract opportunity, solicitation number FA301024R0005, involves the relocation of an RF site and installation of a new 150-foot self-supported tower. Key details include:
The contractor will be responsible for providing engineering services, a new tower foundation, tower installation, antenna installation, and connectivity to the existing site. The government has provided a geotechnical report but no as-built drawings for the existing monopole. The contractor is not responsible for obtaining FCC or FAA approvals, environmental/historic reviews, or decommissioning the existing tower. The contractor must comply with Keesler AFB safety and regulatory requirements. The government will provide the RF data sheet after award. Funds are not currently available, and the government reserves the right to cancel the solicitation. Proposals must address the evaluation factors in Sections L and M.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301024R0005 Technical Questions
1. Has a geotechnical investigation been performed? It is referenced but not provided and I could not find evidence of it on the walk. Providing such in advance will substantially reduce our bid price by eliminating assumptions.
Answer: Geotechnical Investigation has been performed. See Attachment 12 - MAHG 23-00002 Question 1A Geotechnical Report.
2. Is the contractor responsible for obtaining a FRN number from the FCC, notifying the FCC of tower construction, or filing FAA form 7460-1 to obtain a No Hazard Determination?
Answer: No, the contractor is NOT responsible for obtaining a FRN number from the FCC, notifying the FCC of tower construction, or filing FAA form 7460-1 to obtain a No Hazard Determination. All frequency authorizations are obtained, and no FAA waiver is required.
3. Can you specify which/any environmental or historic reviews the contractor will be responsible for? Typically, a project of this size is too small to require such, but we admit that we are not quite well versed enough in FAR and Keesler AFB regulations to be certain this remains the case on an AFB.
Answer: No environmental or historic reviews will be needed by the contractor.
4. Can you provide the proposed loading for the proposed tower? Specifically, we are looking for antennas (with size and weights), mounts, cable quantity & dimensions, and any other appurtenances. Providing this with the contract opportunity will enable us to create preliminary designs and significantly reduce our overall bid price by removing assumptions.
Answer: Yes, we can provide the loading for the tower. The attachment has the types of antenna that we want on the tower, but we have not provided antennas (with size and weights), mounts, cable quantity & dimensions. See Attachment 13 - MAHG 23-00002 Question 4.
5. Does the new tower need to be designed for any future antenna loading? For example, we often design a tower so that the proposed loading represents only 70% of the overall loading capacity.
Answer: Yes, 70% should be sufficient.
6. Can you please clarify what is meant by “smart light beacon?”
Answer: Smart Light Beacon – Just the Light at the top of tower.
7. Can you provide as-built and/or structural drawings for the existing tower?
Answer: Presently, we have a monopole, and we have no as-built or structural drawings for the existing monopole that are available currently.
8. Can you please specify to what depth existing foundations must be removed?
Answer: We do not need to remove the existing tower, therefore the tower foundation does not need to be removed.
9. There is an existing sidewalk and asphalt parking lot at the proposed location for the new tower. Will this be removed and restored to dirt prior to our work, or is removal and replacement part of our scope?
Answer: The existing sidewalk and asphalt parking lot within the 60’ by 60’ compound will need to be removed by the contractor. This was not formally mentioned in the SOO;
it should be a gravel area inside the proposed fenced compound.
10. Does the ground inside the new tower's compound need to be grass, gravel, asphalt, or some other finish?
Answer: Gravel
11. Does the proposed tower need obstruction marking paint?
Answer: No, obstruction marking paint required.
12. Please confirm that the existing tower does not need to be preserved for re-use.
Monopoles, especially older models, are usually damaged during removal.
Answer: Existing monopole doesn’t need to be removed.
13. Please identify what size conductor you would like for the buried grounding. Motorola R56 suggests up to 4/0 stranded for military installations but 2AWG solid is industry standard and is frequently installed on Air Force LMR towers, so clearing up this vague provision will better enable contractors to provide competitive bids.
Answer: 2AWG will be sufficient.
14. If appropriate, can you provide the list of interested bidders that attended the walk?
Answer: This information has been added as an attachment in SAM.gov.
15. When can the government provide the Geotech report?
3.1.1 Provide engineering services for site drawings, civil, electrical and mechanical drawings, and regulatory approvals.
Answer: Geotech Report also known as a Geotechnical is provided. Attachment 12 - MAHG 23-00002 Question 1A Geotechnical Report.
16. What format do you want the design in?
Answer: VISIO
17. Can the Government provide the approved construction drawings for the development adjacent to the proposed compound?
Answer: No, we do not have approved construction drawings.
18. What are the Regulatory requirements for Keesler Air force base?
Answer: Per 81 TRW Safety: The contractor must comply with OSHA requirements just like they would off-base. They will comply with DAFI and the chapter out of DAFMAN 91-203 that covers antennas in the attachment. See Attachment 14 - MAHG 23-00002 Question 18.
19. Can the Government provide additional zoning requirements for new tower construction, or example of zoning from the existing monopole?
Answer: No zoning required.
20. Do we have proposed Antenna heights for load rating?
3.1.3 – Install new tower to be used for antennas – 150-foot self-supported tower.
Answer: Yes. See Attachment 13 - MAHG 23-00002 Question 4.
21. Does the Government have a tower manufacturer preference?
Answer: We have no manufacturer preference.
22. Can we get utility plans of all existing utility infrastructure ie.water,gas,electrical ?
Answer: Yes. See Attachment 15 - MAHG 23-00002 Question 22.
23. Based on the utility plans, what will remain in the proposed compound?
Answer: All utilities will remain in the proposed compound.
24. Is the Contractor Responsible for decommissioning the existing B4605 tower and Infrastructure?
Answer: No, the contractor is not responsible for decommissioning the existing tower and infrastructure.
25. Are the drilled piers proposed, a drilled caisson or hammered piles?
Answer: Drilled
3.1.4. Provide new tower foundation – three (3) drilled piers.
26. What type of grounding system in the building?
Answer: Unknown and we cannot attach the tower grounding to the existing building ground.
3.1.8. Install one copper ground buss bar at proposed entry port.
27. Is the contractor responsible for procurement of these items?
3.2.1 Soft cutover is required by installing a new combining system (Part Number DS00152010 and DS00152089) or a Motorola approved equivalent and two new site routers, JUNIPER Network SRX345/Model: T8817 or a Motorola approved equivalent at the new RF Site prior to moving any RF equipment to establish network connectivity to the zone core. The Two existing ESS Chassis shall be moved to the new RF Site. The Existing RF site shall be in site trunking until the new RF site is connected to the Zone Core.
Answer: Contractor is responsible for procurement of all items to install the tower. We only have the items in the SOO, para 3.3.2.
28. What is the make and model of the new Antennas?
3.3.1 Install 8 new antennas and transmission lines.
Answer: No preferred make. We have added antenna model. See Attachment 13 - MAHG 23-00002 Question 4.
29. Is the contractor to procure the new Antennas?
Answer: Yes., contractor will need to provide new antennas.
30. Is there fiber connectivity between B1101 and B4605?
Answer: Yes, there is a fiber path from 1101 to 4605.
31. Can the Government provide an as-built wire diagram of existing system?
3.3.5 : Coordinate Cutover Plan activities as required.
Answer: No, as-built wire diagram is not available.
32. Can the Government provide the make and model of the beacon?
3.4.2 – Contractor to install necessary power supply components to “BEACON” atop of new tower up to and including installation of conduit, wiring and outlets as required.
Answer: No preferred make. Beacon should be an equivalent to the one referenced in Attachment 16 - MAHG 23-00002 Tower light beacon L-810-Data-Sheet
33. Are the proposed panels backed up with UPS and Generator?
3.4 POWER
Yes, the equipment will be on a UPS supported by a Generator that has been installed in the facility.
34. Please confirm the contractor is responsible for full design. Below states the Government will provide drawings to the contractor.
252.236-7001 Contract Drawings and Specifications. (Aug 2000) As prescribed in 236.570(a), use the following clause: CONTRACT DRAWINGS AND
SPECIFICATIONS (AUG 2000) (a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer. (b) The Contractor shall- (1) Check all drawings furnished immediately upon receipt; (2) Compare all drawings and verify the figures before laying out the work; (3) Answer: Yes, the contractor is responsible for the design.
35. Can the government please restate the specific requirements for this evaluation factor?
Section M The offeror's Statement of Work (SOW) will be evaluated as part of the Technical Proposal evaluation. To be determined Acceptable, the offeror's SOW must meet all objectives and integrate all requirements listed within the SOO. IAW the SOO, provide information in the SOW supporting the offeror's ability to provide the Motorola Certified Technician(s) to accomplish work pertaining to the LMR equipment.In addition to this, the offeror shall submit a Motorola Letter of Authorization with their proposal.(Highlighted sentence has been added) Answer: L and M has been revised. Please see Section M: A. Subfactor 1(a).
36. Is the Government anticipating year-end funding for this work?
Answer: Information from 81 CONS: Funds are not presently available for this effort.
No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs (Per Block 10 of the Solicitation).
37. If permits are required (from base civil engineering, facilities etc.), who is responsible for pulling them?
Answer: Contactor is responsible for all required permits.
38. What are the power requirements for the radio room?
Answer: The equipment that will need to be relocated to B1101 is provided in Attachment 17 MAHG 23-00002 Question 38.
39. Will the ground halo need to cover the whole radio room if they are only using a portion of a roughly 60’x60’ room?
Answer: The grounding halo needs to run the length on the equipment rack from wall to wall.
40. Who is responsible for pulling up the existing sidewalk and driveway?
Answer: Contractor. See answer to question 9.
41. Question: Missing the geodetic survey report, can’t produce the tower pier and pad design without this. It's stated this report is available. Can you forward?
Answer: We have provided a Geotechnical and not a Geodetic survey. A geodetic survey is not available. Please seed Attachment 18 - MAHG 23-00002 Addendum 1 regarding this revision to the SOO.
42. Question: What type of tower? SOO mentions 150' SS tower, but we don’t have a clear picture of the loading on the tower.
Answer: We need something like a 3-legged triangular tower. See Attachment 13 - MAHG 23-00002 Question 4 for loading.
43. Question: RF data sheet is missing for RF requirements. Or will we need to do the RF design?
Answer: RF data sheet will be provided to contractor post award.
44. Question: 3.3.4 verify system configuration, etc. We need to understand the RF requirements of the network.
Answer: RF data sheet will be provided to contractor post award.
45. Question: Is the contractor supplying the HVAC, electrical, etc.
Answer: The contractor is to install electrical from the floor boxes to the racks. No HVAC, fire suppression or alarms.
46. Question: If we don't have the site engineering analysis do we quote that cost in?
Answer: This information is provided in the geotechnical survey. Please Attachment 12
- MAHG 23-00002 Question 1A Geotechnical Report.