This document is an Attachment 9 - Material Submittals Schedule for the MAHG 23-00002 project, which is related to the federal contract opportunity FA301024R0005 for a Land Mobile Radio (LMR) Repeater Site.

The Material Submittals Schedule provides a detailed list of the required submittals, including items such as certificates of compliance, shop drawings, samples, manufacturer's recommendations, warranties, catalog data, operating instructions, and test reports. The schedule includes fields for the Contractor to provide the required submission date, the date the submittal is received, the date it is provided to Civil Engineering for review, the return suspense date, the submittal number, the date the Contractor is notified, any resubmittals, and the final approval date. The document specifies that it should be printed on legal size paper (8 x 14).

The related federal contract opportunity is for the Radio Frequency (RF) Site Relocation project at Keesler AFB, with an estimated construction value between $1,000,000 and $5,000,000. The solicitation is being issued as an Other than Full and Open acquisition to a Motorola certified vendor. An organized site visit is scheduled for June 12, 2024, and funds are not presently available for this effort.

View the file

Other files

File Type Posted
Attachment 14 - MAHG 23-00002 Question 18.pdf PDF
Attachment 13 - MAHG 23-00002 Question 4.pdf PDF
Attachment 18 - MAHG 23-00002 Addendum 1.pdf PDF
Attachment 17 MAHG 23-00002 Question 38.pdf PDF
Attachment 15 - MAHG 23-00002 Question 22.pdf PDF
Solicitation Amendment FA301024R00050001 SF 30.pdf PDF
Solicitation Amendment - FA301024R00050001.pdf PDF
Attachment 16 - MAHG 23-00002 Tower light beacon L-810-Data-Sheet.pdf PDF
Attachment 12 - MAHG 23-00002 Question 1A Geotechnical Report.pdf PDF
Attachment 11 - MAHG 23-00002 Technical Question and Answers.pdf PDF
LMR Repeater Site Relocation Site Visit Sign-In Sheet.pdf PDF
Attachment 1 - MAHG 23-00002 RF Site Relocation SOO Mar 2024 (002) (003).pdf PDF
Attachment 6 - MAHG 23-00002 Past Performance Questionnaire.pdf PDF
Attachment 5 - MAHG 23-00002 Wage Det MS20220050.pdf PDF
Attachment 8 - MAHG 23-00002 5 Line Reference - Past Performance Reference List.pdf PDF
Attachment 7 - MAHG 23-00002 Submittal Procedures.pdf PDF
Attachment 3 - MAHG 23-00002 Fence Drawing.pdf PDF
Attachment 10 - MAHG 23-00002 JA signed REDACTED.pdf PDF
Attachment 4 - MAHG 23-00002 Fence Specifications.pdf PDF
Attachment 2 - MAHG 23-00002 Supplemental Information 20240521.pdf PDF
Final Solicitation - FA301024R0005.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
23-00002Project Title:
MAHG 23-00002]Solicitation / Contract Number:

FA301024R0005, Attachment 9

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N

File details come from the government source that posted it. Updated .