This document contains a unified facilities guide specification for grooving of airfield paving and a related federal contract opportunity notice for repair of a runway depression at Keesler Air Force Base.
The specification provides requirements for grooving existing and new asphalt or concrete airfield pavements to a depth of 1/4 inch and spacing of 1-1/2 inches using self-propelled equipment. It addresses submittals, equipment, preparation of surfaces to be grooved, water supply, grooving procedures, cleanup, repair of damage, and contractor quality control including a test section and inspections.
The federal contract opportunity is a small business set-aside between $1,000,000 to $5,000,000 issued by the Air Force to repair a runway depression at Keesler AFB. A mandatory site visit is scheduled for August 9. The solicitation instructs offerors on acknowledgement of amendments, current base health protection conditions, and advises funds are not presently available and no award will be made until funding is in place. Offerors are directed to proposal preparation instructions and evaluation criteria. The closing date is unspecified.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE / NAVFAC / AFCEC / NASA UFGS- 32 01 18. 71 ( May 2017)
Pr epar i ng Act i v i t y: USACE Superseding UFGS- 32 01 26. 71 ( August 2008)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2022
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 01 18.71
GROOVING OF AIRFIELD PAVING
05/17
PART 1 GENERAL
1.1 SUBMITTALS
1.2 EQUIPMENT, TOOLS, AND MACHINES
1.2.1 Grooving Machine
1.3 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Existing Pavements
3.1.2 New Pavements
3.2 WATER SUPPLY
3.3 GROOVING
3.3.1 Procedures
3.3.2 Clean-Up
3.3.3 Repair of Damaged Pavement
3.4 CONTRACTOR QUALITY CONTROL
3.4.1 Test Section
3.4.2 Inspections
-- End of Section Table of Contents --
SECTION 32 01 18.71 Page 1
USACE / NAVFAC / AFCEC / NASA UFGS- 32 01 18. 71 ( May 2017)
Pr epar i ng Act i v i t y: USACE Superseding UFGS- 32 01 26. 71 ( August 2008)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2022
SECTION 32 01 18.71
GROOVING OF AIRFIELD PAVING
05/17
NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or pr ovi di ng gr ooves i n ai r f i el d pavement s t o i ncr ease t he saf e per f or mance of aircraft.
Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.
Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.
Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .
PART 1 GENERAL
NOTE: I f an act i ve r unway i s t o be gr ooved, al l owances such as Cont r act or r eact i on t i me, mi ni mum di st ance equi pment must be r emoved f r om t he r unway, and an est i mat ed cost t o t he Cont r act or f or each i nt er r upt i on must be addr essed.
I f uni t pr i ces ar e used, t he f ol l owi ng ar e desi gner options:
The uni t of measur ement f or gr oovi ng t he [ r unway] [ t axi way] sur f ace wi l l be t he l ump sum. The uni t of measur ement f or ai r cr af t t r af f i c i nt er r upt i ons wi l l be each.
SECTION 32 01 18.71 Page 2
A l ump sum pr i ce wi l l be pai d f or gr oovi ng and cl eani ng t he pavement . The mi ni mum payment f or each i nt er r upt i on wi l l be one hour .
1.1 SUBMITTALS
NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t , and cor r espondi ng submi t t al i t ems i n t he t ext , t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect . The Gui de Speci f i cat i on t echni cal edi t or s have cl assi f i ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .
For Ar my pr oj ect s, f i l l i n t he empt y br acket s f ol l owi ng t he " G" c l assi f i cat i on, wi t h a code of up t o t hr ee char act er s t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.
The " S" c l assi f i cat i on i ndi cat es submi t t al s r equi r ed as pr oof of compl i ance f or sust ai nabi l i t y Gui di ng Pr i nci pl es Val i dat i on or Thi r d Par t y Cer t i f i cat i on and as descr i bed i n Sect i on 01 33 00 SUBMI TTAL
PROCEDURES.
Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.][for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Equipment ; G[, [_____]] Procedures ; G[, [_____]]
SECTION 32 01 18.71 Page 3
1.2 EQUIPMENT, TOOLS, AND MACHINES
1.2.1 Grooving Machine
Provide a grooving machine that is power driven, self-propelled, specifically designed and manufactured for pavement grooving, and has a self contained and integrated continuous slurry vacuum system as the primary method for removing waste slurry. Equip the grooving machine with diamond-saw cutting blades capable of making at least 457 mm 18 inches in width of multiple parallel grooves in one pass of the machine. Use cutting blades capable of making the required width and depth of grooves in one pass of the machine. A mixture of new and worn blades or blades of unequal wear or diameter are not permitted in the cutting head. Match the blade type and configuration with the hardness of the existing airfield pavement. Use wheels on the grooving machine that will not scar or spall the pavement. Provide the machine with devices to control depth of groove and alignment within the specified tolerances.
Submit a list of proposed equipment to be used in performance of this work, including descriptive data and safety precautions required for the equipment operation.
1.3 ENVIRONMENTAL REQUIREMENTS
Grooving operations will not be permitted when freezing conditions prevent the immediate removal of debris and/or drainage of water from the grooved area. The Contractor is responsible for discharge and disposal of waste slurry. Waste slurry discharge pits may be constructed along side the pavement to be grooved, as directed by the Contracting Officer. Provide and maintain temporary storm drainage, pollution control, and erosion control features at each discharge pit in accordance with base environmental regulations. Excavate and dispose of hardened waste slurry [off base] [in accordance with the base waste disposal requirements] after it has been dewatered. Regrade and restore to original condition all disposal pit areas.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PREPARATION
NOTE: Li mi t s of t he gr ooved ar ea shoul d be as descr i bed i n UFC 3- 260- 02. Gr ooves wi l l be cont i nuous f or t he ent i r e l engt h of t he usabl e r unway and wi l l be per pendi cul ar t o t he r unway cent er l i ne. Gr ooves shoul d t er mi nat e wi t hi n 1. 5 t o 3 met er s 5 t o 10 f eet of t he pavement edge t o al l ow f or t he oper at i on of gr oovi ng equi pment . Gr ooves wi l l al so be t er mi nat ed wi t hi n 75 t o 230 mm 3 t o 9 inches of t he r unway cent er l i ne j oi nt , t r ansver se j oi nt s, i n- r unway l i ght i ng f i x t ur es ( or s i mi l ar i t ems) . Joi nt seal s ( compr essi on or f i el d mol ded) shal l be i nst al l ed such t hat t hey wi l l have pr oper
SECTION 32 01 18.71 Page 4 r el i ef bel ow t he bot t om of t he gr oove cut s. The f ol l owi ng ar eas shoul d not be gr ooved: over r uns, UAS onl y r unways, r ot ar y- wi ng r unways, 3m 10 f eet of r unway ends, and 3m 10 f eet ei t her s i de of an ar r est i ng bar r i er cabl e t hat r equi r es hook engagement f or oper at i on. Fi gur es 2- 10 and 2- 11 of
- FAAAC 150/ 5320- 12A- show exampl es of saw- cut st ep pat t er ns at t he i nt er sect i on of secondar y r unways and exi t t axi ways t o pr i mar y r unways, r espect i vel y.
Char act er i st i cs of t he exi st i ng pavement wi l l be descr i bed i n suf f i c i ent det ai l t o al l ow t he Cont r act or t o sel ect t he most economi cal and ef f ect i ve cut t i ng bl ades f or gr oovi ng t he pavement .
Pavement s shoul d not be gr ooved unt i l t hey ar e at l east 30 days ol d.
3.1.1 Existing Pavements
Do not groove bumps, depressed areas, bad or faulted joints, and badly cracked and/or spalled areas in the pavement until such areas are adequately repaired or replaced.
3.1.2 New Pavements
Allow new asphalt concrete pavements to cure for a minimum of 30 days before grooving, to allow the material to become stable enough to prevent closing of the grooves under normal use. Permit new portland cement concrete pavements to cure for a minimum of 28 days before grooving.
3.2 WATER SUPPLY
NOTE: I f t r anspor t at i on of t he wat er by sur f ace l ai d pi pe i s per mi t t ed, r out i ng of t he pi pe shoul d be shown. I dent i f y t he avai l abl e sour ce l ocat i on on t he dr awi ngs.
[Provide water for the grooving operation] [The Government will provide water for the grooving operation].
3.3 GROOVING
3.3.1 Procedures
Submit grooving sequence and method of placing guide lines to control grooving operation. Cut grooves in the [asphalt] [portland cement] areas as indicated on the drawings. Begin the grooving at one side of the usable [runway] [taxiway] and continue for the full width of the area.
Take all reasonable precautions to prevent damage to or roughening of the pavement between grooves. Spalling along or tearing or raveling of the groove edges will not be allowed. Cut grooves that are 6 mm, plus 2 mm, minus 0 mm 1/4 inch, plus 1/16 inch, minus 0 inch wide by 6 mm, plus or minus 2 mm 1/4 inch, plus or minus 1/16 inch deep and 38 mm, plus 0 mm, minus 3 mm 1-1/2 inches, plus 0 inches, minus 1/8 inch center to center spacing. Cut grooves that are [_____] meters feet plus or minus 75 mm 3 inches long and normal to the longitudinal axis of the centerline of the
SECTION 32 01 18.71 Page 5
[runway] [taxiway]. The transverse alignment of the grooves must not vary more than 75 mm 3 inches plus or minus on a 23 m 75 foot length of grooving. Do not groove within 150 mm plus or minus 75 mm 6 inches plus or minus 3 inches of the runway centerline. Do not groove within 150 mm 6 inches of transverse joints or working cracks, through compression seals, in-runway lighting fixtures or similar items, the first 3 m 10 feet either side of an arresting barrier cable or the first and last 3 m 10 feet of the runway.
3.3.2 Clean-Up
Continously clean-up debris from the grooving operation. Flush debris produced by the equipment to the edge of the grooved area or pick it up before it dries and hardens. Flush the remaining dust coating to the edge of the area if the resultant accumulation is not detrimental to the vegetation or storm drainage system. Accomplish all flushing operations in a manner to prevent erosion on the shoulders, damage to vegetation, or plugging of storm drainage.
3.3.3 Repair of Damaged Pavement
Repair at the Contractor's expense, [as specified in Section [_____],] any damage, which in the opinion of the Contracting Officer will be detrimental to aircraft operations and/or pavement performance, occurring to the pavement as a result of the grooving operations.
3.4 CONTRACTOR QUALITY CONTROL
3.4.1 Test Section
Groove a test section [_____] m feet long by two lanes wide in an area of the pavement outside of the trafficked area, as approved by the Contracting Officer. Demonstrate the setup and alignment process, the grooving operation, and the waste slurry disposal.
3.4.2 Inspections
At the beginning of each work shift, furnish a full complement of grooving blades with each saw that are capable of cutting grooves of the specified width, depth, and spacing. If during the work, a single grooving blade on a machine becomes incapable of cutting a groove, continue work for the remainder of the work shift. The Contractor is not required to cut the groove omitted because of the failed blade. Should two or more grooving blades on a machine become incapable of cutting grooves, cease operating the machine until it is repaired.
-- End of Section --