Attachment 4 - Confined Space Entry and Stormwater Requirements.pdf

PDF 259 KB Posted

Attached to
Repair Runway Depression Federal contract opportunity
Solicitation number
FA301022R0028
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains requirements for a federal construction contract opportunity and related stormwater and confined space entry requirements. The solicitation seeks offers to repair runway depressions at Keesler Air Force Base for an estimated value between $1,000,000 to $5,000,000, and is set aside as 100% HUBZone. Offerors must acknowledge any amendments and attend an organized site visit on August 9, 2022. The contractor will be required to comply with all applicable federal and state safety regulations regarding confined space entry and excavations. A stormwater runoff plan must also be submitted identifying best management practices to control erosion, sedimentation, and runoff, and contractors may need to obtain a stormwater construction permit.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Runway Depression, newest first.
File Type Posted
Attachment 19 - Specifications - Asphalt Base and Fill.pdf PDF
Solicitation Amendment FA301022R00280002 SF 30.pdf PDF
Solicitation Amendment - FA301022R00280002.pdf PDF
Solicitation Amendment FA301022R00280001 SF 30.pdf PDF
Attachment 18 - Addendum 1.pdf PDF
Attachment 16 - UFGS321723.pdf PDF
Attachment 17 - UFGS 32 01 18.71.pdf PDF
Attachment 13 - Questions and Answers 23 Aug 22.pdf PDF
Solicitation Amendment - FA301022R00280001.pdf PDF
Attachment 15 - As Built -Q 10 b.pdf PDF
Attachment 14 - As Built -Q 10 a.pdf PDF
Site Visit Sign In 20220809.pdf PDF
Attachment 9 - Past Performance Questionnaire.pdf PDF
Attachment 8 - Past Performance Reference List.pdf PDF
Attachment 11 - SF 1444.pdf PDF
Attachment 5 - Geotextile Fabric- Specifications.pdf PDF
Attachment 7 - Wage Determination.pdf PDF
Attachment 6 - MSS.pdf PDF
Attachment 3 - Drawings 20220112.pdf PDF
Attachment 1 -MAHG211143 Repair Runway Depression SOW RevB.pdf PDF
Solicitation - FA301022R0028.pdf PDF
Attachment 12 - Notice of Compliance.pdf PDF
Attachment 10 - Submittal Procedures.pdf PDF
Attachment 2 - HydraTech HydraTite Box Culvert Sealing System Spec.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A- Confined Space Entry

1- Contractors shall comply with all the applicable federal and state fire regulations.

2- Contractors shall comply with all the applicable federal and state safety and health regulations.

3- Contractor will be briefed at “pre-con meeting” on the local Keesler AFB requirements

(Copy attached) 4- Contractor is required to supply “the establishment and use of a written confined space entry program and procedures" when working independently in a permit space. The program must be in compliance with 29 CFR 1910.146”.

5- Keesler Fire Department can be used as a confined space rescue team since it’s on the installation, but they would need to be notified in advance if someone needed to enter a “Permit Required Confined Space”.

6- The Contractor are required to obtain “hot work” permits from the Base Fire Department, if anyone needs to weld anything.

7- If the contractor is entering any of the existing “Permit required confined spaces”, contractors are required to be briefed on any know hazards as applicable, before entering the sites.

8- If the contractor is creating any new confined spaces, Base Safety and the Fire Department must be informed and they need to be added to the “master installation listing”.

9- The above procedures also apply to the “EXCAVATIONS” and “FALL PROTECTION”.

B- Stormwater Requirements

The contractor shall submit a detailed Stormwater Runoff Plan report to identify:

1-How are they going to protect the downstream side of the construction area?

2-How are they planning to prevent any material from the construction area to escape to the outfalls in Back Bay?

3-The BMPs proposed for the project shall clearly identified and submitted to CO/PM for approval.

4-Contractor must contact MDEQ to identify if a Stormwater Construction Permit is required.

5-Contractor is responsible to obtain the required Stormwater Construction Permit (if any).

6-Erosion Control Measures must be in place prior to any disturbance using best management practices(BMP'S).

7-Erosion Control Devices shall be used for the staging area and any material stockpiles

NECESSARY TO CONTROL EROSION AND STORMWATER RUNOFF.

8-10. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO

STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO

PREVENT ITS MOVEMENT BY WIND FORCES.

9-11. LIMITS OF CONSTRUCTION IS DEFINED AS THOSE AREAS LIMITS OF

CONSTRUCTION IS DEFINED AS THOSE AREAS AFFECTED BY THE

CONTRACTOR'S OPERATIONS INVOLVING EXCAVATION, EMBANKMENT

AND FINAL GRADING REQUIRED TO COMPLETE THE WORK IN ACCORDANCE

WITH THE ELEVATIONS, GRADES AND SECTIONS SHOWN IN THESE

DRAWINGS.

10-12. CONTRACTOR SHALL UTILIZE EROSION CONTROL DEVICES AND

CONTRACTOR SHALL UTILIZE EROSION CONTROL DEVICES AND

PROCEDURES AS SET FORTH IN MDOT STANDARD DETAILS, 2018 EDITION.

11-

MAHG211143_Repair Runway Depression FA301022R0028 Attachment 4

Confined Space Entry and Stormwater Requirements

File details come from the government source that posted it. Updated .