Attachment 6 - MSS.pdf

PDF 49 KB Posted

Attached to
Repair Runway Depression Federal contract opportunity
Solicitation number
FA301022R0028
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a schedule of material submittals and a federal contract opportunity solicitation for runway repair work. The schedule of material submittals lays out when the contractor must submit items like asphalt and concrete mix designs, base materials, drainage sealing materials, geotextile pipe wrap, hazardous materials questionnaires and reports, recycling and landfill reports, and warranties for approval by the civil engineer. The federal contract opportunity is a solicitation from the Department of the Air Force to repair a runway depression at Keesler Air Force Base for between $1,000,000 to $5,000,000 as a 100% HUBZone small business set aside. An organized site visit for contractors is scheduled for August 9th, 2022. The solicitation notes current health protection conditions at Keesler AFB due to COVID-19. Offerors are directed to sections in the solicitation for proposal preparation and evaluation factors for award. The government reserves the right to cancel the solicitation before or after the closing date.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Runway Depression, newest first.
File Type Posted
Solicitation Amendment FA301022R00280002 SF 30.pdf PDF
Solicitation Amendment - FA301022R00280002.pdf PDF
Attachment 19 - Specifications - Asphalt Base and Fill.pdf PDF
Attachment 14 - As Built -Q 10 a.pdf PDF
Solicitation Amendment FA301022R00280001 SF 30.pdf PDF
Attachment 18 - Addendum 1.pdf PDF
Attachment 16 - UFGS321723.pdf PDF
Solicitation Amendment - FA301022R00280001.pdf PDF
Attachment 15 - As Built -Q 10 b.pdf PDF
Attachment 17 - UFGS 32 01 18.71.pdf PDF
Attachment 13 - Questions and Answers 23 Aug 22.pdf PDF
Site Visit Sign In 20220809.pdf PDF
Attachment 12 - Notice of Compliance.pdf PDF
Attachment 10 - Submittal Procedures.pdf PDF
Attachment 2 - HydraTech HydraTite Box Culvert Sealing System Spec.pdf PDF
Attachment 9 - Past Performance Questionnaire.pdf PDF
Attachment 8 - Past Performance Reference List.pdf PDF
Attachment 7 - Wage Determination.pdf PDF
Attachment 3 - Drawings 20220112.pdf PDF
Attachment 1 -MAHG211143 Repair Runway Depression SOW RevB.pdf PDF
Solicitation - FA301022R0028.pdf PDF
Attachment 11 - SF 1444.pdf PDF
Attachment 5 - Geotextile Fabric- Specifications.pdf PDF
Attachment 4 - Confined Space Entry and Stormwater Requirements.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

1 Asphalt Surface Course X X X 2 WK PRIOR

2 Asphalt Binder Course X X X 2 WK PRIOR

3 Concrete Mix Design X X X 2 WK PRIOR

4 Size 610 Limestone Base X X X 2 WK PRIOR

5 Drainage Sealing Material X X X 2 WK PRIOR

6 Geotextile Pipe Wrap X X X 2 WK PRIOR

7 HAZMAT Questionaire X X

5 DAYS

PRIOR

8 HAZMAT MSDS X

5 DAYS

PRIOR

9 HAZMAT Reporting Entry Form X X

5 DAYS

PRIOR

10 HAZMAT Reporting Entry Form X X

END OF

CONTRACT

11 Recycling and Landfill Report X X

END OF

CONTRACT

12 Warranty (Manufacturer's) X

END OF

CONTRACT

13 1-Year Warranty (Contractor's) X

END OF

CONTRACT

Re tu rn

S us pe ns e D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

Co lo r S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

Ca ta lo g

D at a

Project Number:

MAHG 21-1143

Project Title:

Repair Runway Depression

Solicitation / Contract Number:

[ enter here ]

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

Re qu ire d

Su bm is si on D at e

Item or Description of Item, Contract Reference, Type of Submittal

Ce rt ifi ca te o f C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

Co nt ra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e Re ce iv ed in

C on tr ac tin g

Fi el d Re po rt s

O pe ra tin g In st ru ct io ns

Sc he du le s, Li st in gs , R ep or ts , P la ns

File details come from the government source that posted it. Updated .