Keesler Base Operations Support
FA3002-16-R-0002
Questions Answers 7 Oct 16
Order Type
Solicitation Reference
(Section, page, paragraph, etc.)
PWS Reference (paragraph, page, etc.)
Additional/ Cross Reference Discussion Comment/Question Response
001 C Page 33 Section I, FAR 5352.209-9001 POTENTIAL ORGANIZATIONAL CONFLICT OF INTEREST (OCT 2010) ALTERNATE I (OCT 2010) (RFP page 33): This clause appears to require an OCI discussion within the proposal. Within which proposal Volume should this data be submitted?
Any potential conflict of interest information should be included in Volume I "Price and other Contracting Considerations".
002 C Pages 28-30 Section I, 252.237-7023 CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010) and 252.237-7024 NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010), (RFP pages 28 – 30):
Please confirm that the Mission-Essential Contractor Services Plan discussed in these clauses is satisfied by the response to Section L.5.3.2.3
Yes, the Mission-Essential Contractor Services Plan shall be addressed under L.5.3.2.3.
003 T Section J, Attachment 16
Section J, Attachment 16, Work Breakdown Structure appears to be a fairly lengthy table. Please consider excluding it from the page count limitations.
The Work Breakdown Structure (WBS) is not included in the page count limitations. Section L.3.1.1 was revised as follows: "Each page shall be counted except the following: the transmittal letter, cover pages, tab-divider pages, title pages, table of contents, lists of tables and drawings, glossary of acronyms, cross-reference matrix, position qualifications, manpower matrix or work breakdown structure." See upcoming amendment for revised RFP.
004 T Section J, Attachment 17
Section J, Attachment 17: After reviewing this RFP Attachment, we understand that incumbent workforce demographic data may be available, which would allow a non-incumbent to more effectively bid this contract. Is the Government planning to provide this information to ensure equitable opportunity for all Offerors?
See Amendment A001 for revised Attachment 18 "Workforce Demographics".
005 C Page 54 Section L.4.1 (RFP page 54): This section states that “The prime and all subcontractors pricing shall be in United States currency only.” Please clarify what pricing information is required from subcontractors.
Pricing needs to be submitted in U.S. dollars only.
006 C Page 55 Section L.4.2 (RFP page 55): Please clarify whether a Cross-Reference Matrix is required for Volume I-Price.
A cross-reference matrix can be included but is not required.
007 C Page 62 Section L.6.2.1 (RFP page 62): Section L.6.2.2 limits the Table of Contents and Summary Page(s) for the Past Performance Volume to 5 pages. Please clarify whether a List of Tables and Figures, Glossary and Cross-Reference Matrix are required for Volume III, Past Performance. If so, are they included within the 5-page limit?
Per Section L.6.2.2 "The Table of Contents and Summary Page(s) shall not exceed five (5) pages combined. The Table of Contents and Summary Page(s) do not count against the page limit of the Past Performance volume." Therefore, anything outside the Table of Contents and Summary pages will be counted against the 10 page limit for Volume III "Past Performance".
008 T Page 60 Section L.5.3.1.2 (RFP page 60) requires “a list of Offeror-provided equipment and vehicles (quantity/type) … the plan to acquire the necessary equipment and vehicles, and a plan to maintain and replace equipment and vehicles. (Section J, Attachment 14).” Section J, Attachment 14 appears to represent only a listing (quantity/type) of the vehicles being proposed. Please clarify where the vehicle acquisition and maintenance plans should be provided, as well as where the listing/plan for equipment should be provided
Both plans should be part of offerors proposal as well as the list/table quantity/type along with equipment and vehicles (quantity/type) listing.
010 T Para 11.1.2.2.4.1.5.9
CLIN 1009-O&M Sustainment PWS 11.1.2.2.4.1.5.9. Appears to be in conflict with CLIN 1027-IGI&S (GEOBASE) PWS 12.1.2.3.4.3. Would the government please clarify under which CLIN we are to price this activity
Paragraph 11.1.2.2.4.1.5.9. and 12.1.2.3.4.3. are two different paragraphs. Paragraph
11.1.2.2.4.1.5.9. is supported under Operations Maintenance Engineering, and funded through sustainment CLIN 1009 and Paragraph 12.1.2.3.4.3. is a requirement under Installation Engineering and funded through CLIN 1027.
011 T Para 11.1.2.2.1.1 PWS 11.1.2.2.1.1 “The SP will be responsible for the completion of all roofing projects approved by the Government that are valued at $150,000 or less, on Keesler AFB, and any attached or related properties under the control of Keesler AFB. The method of completion of projects that are valued above $150,000 will be determined by the Government IAW AFI32-105_AFGM2016-01 dated 20 Jan 2016.” Is roofing project under $150K included in FFP or a CR CLIN? What CLIN should offerors price this under?
Roofing projects under <$150,000 should be included in firm fixed price CLIN 0009 - Sustainment.
Questions Answers 7 Oct 16
012 T Para 11.1.2.2.4.3.3
PWS paras. thru 11.1.2.2.4.3.3 refer to appliance maintenance in three separate CLINs, all three stating in the PWS “Total minor repair costs shall not exceed $1,000 per year.” Might the government add that Not To Exceed verbiage to the corresponding CLINs in the RFP?
PWS Sections 11.1.2.2.4.3.1, 11.1.2.2.4.3.2 and 11.1.2.2.4.3.3 were revised (see below) to remove the statement "Total minor repair cost shall not exceed $1,000 per year". See upcoming amendment for revised PWS.
11.1.2.2.4.3.1. APPLIANCE MAINTENANCE DORMS: APPROPRIATED FUND (APF):
Provide and maintain washers and dryers for dormitories. Maintain government provided ice machines. Respond to service calls from the appliance users and repair when more cost effective than replacement. Manage warranty repair or replacement when applicable.
11.1.2.2.4.3.2. APPLIANCE MAINTENANCE LODGING NON-APPROPRIATED FUND
(NAF): Provide and maintain washers and dryers for lodging. Maintain government provided ice machines. Respond to service calls from the appliance users and repair when more cost effective than replacement. Manage warranty repair or replacement when applicable.
11.1.2.2.4.3.3. APPLIANCE MAINTENANCE OTHER FACILITIES: APPROPRIATED FUND
(APF): Provide and maintain washers and dryers for other facilities. Maintain government provided ice machines. Respond to service calls from the appliance users and repair when more cost effective than replacement. Manage warranty repair or replacement when applicable.
017 T L.5.3.1. Is there a preferred, or required format to be used for the referenced timeline? Gantt-style charts are often used for timeline depictions, but the Gantt format typically consumes a substantial page count. Would a calendar format or other depiction, such as a Mobilization Task Table, suffice for the timeline as long as the other requirements are met?
There is no preferred, or required format for referenced timeline. As long as the requirement is met.
In accordance with Section L.3.1.1 "Each page shall be counted except the following: the transmittal letter, cover pages, tab-divider pages, title pages, table of contents, lists of tables and drawings, glossary of acronyms, cross-reference matrix, position qualifications or manpower matrix." Therefore, If a table format/Chart/Gantt type information is used, it will not be counted against the page count.
018 C Attach 19 RFP attach 19, KAFB BOS Pricing Section B requires offerors to provide pricing for Mobility, Base Year, and each Option Year, however the spreadsheet miss-identifies the 15 Feb-31 Mar 17 Mobility period as “Base Period”, the 1 Apr 7-31 Mar 18 Base period as “Option Period 1” and on through all the option periods.
This is in conflict with references throughout the RFP which identify “mobilization” as the 45-day period prior to the base year, the base year as the first full year of the contract and option periods as the subsequent full years of performance. Additionally, since pre-solicitation, the government has stated “The contract will have a 45-day Period of Performance (PoP) for mobilization, full performance of 12 months (base year) once mobilization is complete, four 1-year options and two 1-year incentive option periods.”
Section B has the correct periods of performance (POP). Additionally, the POP is under Section F (page 6) which outlines Mobility as the 45-day Base Period, 5 one-year options and 2 one-year incentive option periods. The synopsis posted on 15 Jun 2015 incorrectly labeled the POPs; the total POP is unchanged.
019 T PWS 11-1-8 11.1.2.2.2.2.1 The PWS requires a qualified Electrician to be available during the time the airfield is open and the aircraft are flying.
What hours is the airfield open? Correct PWS reference is 11.1.2.2.3.4.
Section 11.1.2.2.3.4 was revised to added the following "See GENERAL AIRFIELD INFORMATION AND HOURS OF OPERATION on page 11-3-8, PWS reference 11.3.16. for Qualified Electrician reporting during non duty hours."
Section 11.3.16.was revised to add the following: "GENERAL AIRFIELD INFORMATION AND HOURS OF OPERATION: The airfield normal hours are 0800L - 2300L Mon- Fri Sat and Sun 1100L-1700L Closed on Federal Holidays. -A Qualified Electrician is on call for mission essential aircraft such as when the Hurricane Hunters are flying storm missions which could happen at any time day or night. - A Qualified Electrician will open up for mission essential aircraft traffic such as fixed wing Medical Evacuation or Distinguished Visitor traffic. - A Qualified Electrician may be tasked in the event there are transient aircraft exercises such as the Army or Marines. In the event of transient aircraft exercises, the airfield could be open for those missions and would have to open the airfield. - In addition, the Flight Commander can request airfield closure after a Federal Holliday such as closed for Thanksgiving day, and through the whole weekend."
See upcoming amendment for revised PWS.
020 C L.3.1.6 Section L.3.1.6 states: “The “Original” for each volume shall be unbound and also include a standard (5 ½ inch-spaced) two-hole punch applied to the top of each page when viewed in Portrait orientation (for Government filing)” We understand that the two-hole punch for the typical Government filing is 2-1/4 inch spaced.
Please clarify the two-hole punch spacing for original copies of the proposal and amend Section L.
See Amendment A001 which revises Section L.3.1.6 to read "The “Original” for each volume shall be in a 3 ring binder to include the standard 3-ring hole punch on the left hand side of the page when viewed in portrait orientation."
024 T L.5.3.1.2 List of Offeror-provided equipment and vehicles. Please advise if the list of Offeror-provided equipment and vehicles is included in the page count limitation for Volume II – Technical.
List of offeror-provided equipment and vehicles not included in page limitation.
025 C L.3.1.2 Section L.3.1.2 states: “Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text.”
Please advise if an 11 x 17 foldout page counts as one page or two pages and amend Section L.
The sentence prior clearly states foldout pages shall count as one page. Per Section L.3.1.2 "These displays shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text."
Questions Answers 7 Oct 16
026 T 11-2-4 Performance Objective 11.2.28
Performance Objective 11.2.28 requires the Offeror to “Manage vehicle inventory, monitor the status of all Government assigned vehicles, provide maintenance oversight, prepare reports, and investigate vehicle incidents.”
The PWS reference 11.1.2.2.4.3. refers to appliance maintenance. Please delete or correct Performance Objective 11.2.28.
11.2.28 REMOVED/DELETED
027 T 11-1-8 11.1.2.2.2.2.1 The PWS states: “Provide application of herbicides except where covered under a separate grounds maintenance service contract.”
Please provide a list of the areas that are covered under a separate grounds maintenance service contract.
There are no areas covered under separate grounds contracts. Offerors should refer to PWS section 13 (Grounds Maintenance) for details on services required. Maps of Offeror's area of responsibility are included at Appendix 13-C. Revised Section 11.1.2.2.2.2.1 to remove language “except where covered under a separate grounds maintenance service contract.” See upcoming amendment for revised PWS.
028 C L.3.1.2 Section L.3.1.2 states: “For tables, charts, graphs and figures, the text shall be no smaller than 8 font size (pitch), Times New Roman font style.”
Does the Government want the Offeror to also change all lettering in graphics and design elements to Times New Roman? If no, please amend Section L.
Graphics and design elments do not apply; Section L.3.1.2 applies to "tables, charts, graphs and figures" only.
030 T N/A Tririga When will Tririga be implemented at Keelser AFB? No implementation date has been determined.
031 C L.3.1.6 Section L.3.1.6 states: “Volumes I through IV shall not be submitted together within the same binding.”
The remainder of Section L requires Offerors to submit Volumes I through III.
Please amend Section L.
Amendment A001 has corrected this error. There are only three volumes; Technical, Past perfromance and Price. Section L.3.1.6 has been revised to reflect "Volumes I through III shall not be submitted together within the same binding".
032 T L.5.3.3.6 WBS Request that the Government please add the WBS to the items excluded from the page count in Volume II and amend Section L. The WBS format provided in Attachment 16 could possibly account for over 100 pages alone. Consequently, there may be very little page count left to include all required details in Volume II if the WBS is included in the page limit.
The Work Breakdown Structure (WBS) is not included in the page count limitations. Section L.3.1.1 was revised as follows: "Each page shall be counted except the following: the transmittal letter, cover pages, tab-divider pages, title pages, table of contents, lists of tables and drawings, glossary of acronyms, cross-reference matrix, position qualifications, manpower matrix or work breakdown structure." See upcoming amendment for revised RFP.
033 C PWS Section J, Attachment 18
Since the Federal Government’s procurement interests in economy and efficiency are served when the successor contractor hires the predecessor’s employees – as their studies have shown that a carryover work force reduces disruption to the delivery of services during the period of transition between contractors and provides the Federal Government with experienced and a trained work force that is familiar with the Federal Governments personnel, facilities and requirements, they (the Government) benefit – all offerors should be provided with the list of the CBA’s certified service employees during the solicitation phase of this procurement. Since all Offers will see immediate reductions in the cost of hiring new workers due to this regulation, all Offers will need to be provided the same information about the current incumbent work force. The incumbent (and those offerors they team or collaborate with) have an unfair competitive advantage over other offerors without this cost saving information. If the union will not provide the current seniority list to all Bidders and thus giving the incumbent a significant competitive advantage over all other bidders (since they would be the only one to know actual employee seniorities), the government will not have the benefit of an offerors best industry practices and efficiencies thus causing the price to the government to be higher than it might be otherwise.
As these are the major direct costs bid to the government, please provide all Offers the following : 1) the number of incumbent employees (from the list the contractor is required to provide the Government upon request); 2) the current position these employes are qualified for; 3) the employee wages and benefits;
and 4) a copy of the current contractor's senority list.
The only information that is provided on the current workforce is in Attachment 2 "SCA WD", Attachment 3 "CBA" and Attachment 18 "Workforce Demographics". The incumbent workforce information requested cannot be required earlier than permitted by FAR 22.1020 and subparagraph (n) of the SCA clause (52.222-41)-- no later than 10 days before contract completion. The purpose of the information is to assist the new contractor in complying with SCA vacation requirements. The seniority list is not intended as an aid to offerors for contract bidding/pricing purposes and therefore should not be provided to any offeror or awardee prior to the beginning of contract performance.
034 C PWS 2.1.2.26.2 The paragraph states, "The contractor will be provided any supplies/materials at contract start that are left over from previous contract. Any additional supplies/materials for BOS or authorized customers shall be provided by the contractor. The contractor shall bid those costs into the contract price."
1. Will there be a cost for the "left over material"to the new contractor?
2. Is it correct to assume that supplies and materials will include G&A and Fee or are these costs pass through like the GFE replacement in paragraph 2.1.2.26.3?
No, the government will not provide a notional list of supplies. See upcoming amendment for the following language removed from PWS:
The contractor will be provided any supplies/materials at contract start that are left over from previous contract. Any additional supplies/materials for BOS or authorized customers shall be provided by the contractor. The contractor shall bid those costs into the contract price.
035 T PWS 2.1.2.32.2 Will the Government provide temporary office facilities for the Transition or will the contractor have to find temporary space off site?
See Amendment A001. Section 2.1.2.32.4 was revised to reflect: "MOBILIZATION SCHEDULE:
Contractor changeover shall be accomplished with the objective of becoming one hundred percent self-sufficient by contract performance start date. Government will provide onsite temporary office space for winning contractor for hiring/interviewing/transition and mobilization."
036 C PWS 2.1.2.32.4 Contractor changeover shall be accomplished with the objective of becoming one hundred precent self-sufficient by contract performance start date.
A 45 day phase-in or start-start up period is very conservative with the complexity of this solicitation. Would the Government consider increasing the Mobilization Schedule to 60 or more days?
Due to schedule constrictions the Government cannot go beyond a 45 day Mobilization Base Period.
038 T PWS 2.3.4.8 Vehicle Maintenance Is there a list of Government Provided Equipment that includes the general purpose vehilces that are in use on Keesler?
See Amenment A001; Attachment 22 "Current Vehicle List on Contract" was added for informational purposes.
Questions Answers 7 Oct 16
039 C L.6.2.3.4 Past Performance Information (PPI) Tool Does the Government want a hard copy of the Past Performance Information that was submitted electronically via the PPI tool included in Volume III – Past Performance? If so, is a page limit per contract? And where does the Government want the pages placed in the volume?
Yes, a hard copy of the PPI needs to be submitted along with an electronic copy and included in Volume III "Past Performance" as noted in Section L.6.2.1. Per Section L.6.2.3.3. "The PPI for each contract submission is limited to no more than seven (7) pages; PPI sheets do not count against the page limitation (10 pages) for this volume. Submissions are limited to no more than a combined total of six (6) contracts. The Government will use data provided by each Offeror in this volume and may use data obtained from other sources in the evaluation of past and present performance."
040 T Work Space(s) on-base during Transition period Will the government supply working space(s) on-base during the Transition period for the incoming SP? These work areas will be needed to perform the myriad of activities necessary to interview/ register/ assign the workforce, perform security clearance/ base access actions to ensure the workforce is ready on day one. Without such spaces, the incoming contractor must rent office and workspaces off-base at significant expense and inconvenience for the personnel being hired (the majority of which will come from the existing, incumbent workforce).
See Amendment A001. Section 2.1.2.32.4 was revised to reflect: "MOBILIZATION SCHEDULE:
Contractor changeover shall be accomplished with the objective of becoming one hundred percent self-sufficient by contract performance start date. Government will provide onsite temporary office space for winning contractor for hiring/interviewing/transition and mobilization."
041 C CLIN Reduction Will the government consider reducing/combining the number of CLINs in the contract? A reduction in the 50 CLINs would simplify the administrative and accounting load for both the SP and the government.
Unfortunately there is no flexibility to reduce the number of CLINs in Section B.
042 T Supply Individual Equipment Section swing shift During the site visit to the Supply Building, the COR briefed that the hours of operation for the Individual Equipment section was 0700-1600 daily. He went on to say that after 1600, there was always someone on-call to respond if needed.
He then stated that there was also a swing shift. Would the government please clarify the requirement for the swing shift?
See Amendment A001. Section 23.3.2.1 Supply Hours of Operation revised.
044 T RFP Sec I, pages 28, 29 and 30
2.1.1 -p 2-3-1,
2.1.2.25.4 -p 2-3-14
11.1.2.2 -p 11-1-1,
32.1.1 -p 32-1-1 and
32.1.3 -p 32-3-1
RFP Clause 252.237-7023 defines “essential contractor services” and “mission-essential functions. Paragraph (c)(1) requires a “Mission-Essential Contractor Services Plan” be submitted by the Contractor that will be incorporated in this contract. (d)(1) also states “the Contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-Essential Contractor Services Plan.”. Clause 252.237-7024 defines additional requirements with regard to Mission-Essential Services.
PWS paragraph 2.1.2.25.4 states “it is determined that services as identified in this PWS are NOT essential for performance during a crisis. In the event of an unforeseen natural or military crisis, i.e., hurricane, insurrection, etc., the contractor’s primary responsibility is to safeguard it personnel and secure any equipment.”
Paragraph 2.1.1 states "Provide support to 24/7 surge requirements in response to natural/man-made disasters including, but not limited to hurricanes, contingencies, and exercises. At Administrative Contracting Officers (ACO) approval, reduce operations in noncritical Base Operating Support (BOS) areas and direct resources to meet surge requirements."
Paragraph 11.1.2.2 states "Provide 24 hours a day, 7 days a week emergency response capability. Respond to all contingencies and natural disasters during 24/7 operation."
Paragraph 32.1.1 states with respect to Weather Services “These services are essential to the safety and success of the 81st Training Wing (81 TRW) and the 403d Wing (403 WG), which carries out Hurricane Hunter and tactical airlift missions.”
Paragraph 32.1.3 states “Outside of normal airfield/duty hours, during holidays, and/or when the base commander deems the airfield is closed, standby weather personnel will be on call for services at any time. A standby list of personnel will b fil i h h b d h i id ’ i l f
Are the Contractor Services essential on not? Is the Mission-Essential Contractor Services Plan required? Please clarify.
Section 2.1.2.25.2. was revised to add "The Air Force (AETC) has determined that natural disaster, major accident and war response and recovery times and associated activities for real world events will vary and post disaster and emergency recovery will vary with the degree of damage. These events or times cannot be estimated for real world events therefore there is no workload associated for these requirements. In the event that these events occur during the life of the contract, the Air Force (AETC) expressly reserves the right to incorporate CLINS to fund the support and completion of these requirements. If such a change should become necessary, the appropriate adjustments will be negotiated and incorporated by the Administering Contracting Officer under the authority of the appropriate changes cause."
Section 2.1.2.25.4. was revised add: "Contractor services as described elsewhere in the PWS and section J, Attachment 7 are mission essential. A Mission Essential Contractor Services Plan is required as stated in 252.237-7023 Continuation of Mission Essential Contractor Services and 252.237-7024 Notice of Continuation of Essential Contractor Services."
See upcoming amendment for revised PWS.
048 T 11.1.2.1 -p 11-1-2 Appendix 11A
AFI 32-1001 -
p 11-A-8
In the first sentence of this paragraph, the SP is required to work on Real Property Similar Equipment (RPSE). AFI 32-1001, which is incorporated into the PWS, states that RPSE/non-RPIE is not maintained by Civil Engineers. Throughout PWS Section 11, it requires the SP to account for and maintain RPSE/non-RPIE.
Is the service provider responsible for maintaining RPSE/non-RPIE? If yes, please provide a listing and all pertinent data regarding this RPSE and non-RPIE.
Yes, the Offeror is required to work on Real Property Similar Equipment (RPSE)/non-RPIE. There is no separate listing for RPSE. The workload is already included in 11-B.
049 T 11.1.2.2 -p 11-1-2
The second sentence of this paragraph requires the SP to provide priority service to facilities, RPIE, RPES, and systems designated as critical by the Government.
Is the PAL document referenced in Attachment 7 the only priority facilities? Yes, the PAL referenced in Attachment 7 is the only listing of priority facilities and equipment.
050 T 11.1.2.2 -p 11-1-2
Within the paragraph where Work Priority 2A is discussed, it requires the SP to perform plant operations and PM Work IAW higher headquarters guidance and AF approved PM Task List.
Please provide the AF approved PM Task List. At this time there is not an approved Preventative Maintenance Task List (PMTL). Reference to PMTL removed from Section 11.1.2.2. Offeror will use the current RWP listing for preventative maintenance.
See upcoming amendment for revised PWS.
051 T 11.1.2.2 -p 11-1-2
Under this paragraph, the SP is required to respond to all contingencies and natural disasters during 24/7 operations. There is no work load data for this requirement.
Is contingency and natural disaster response considered part of the firm fixed price? If so, can workload be provided?
The Air Force (AETC) has determined that natural disaster, major accident and war response and recovery times and associated activities for real world events will vary and post disaster and emergency recovery will vary with the degree of damage. These events or times cannot be estimated for real world events therefore there is no workload associated for these requirements. In the event that these events occur during the life of the contract, the Air Force (AETC) expressly reserves the right to incorporate CLINS to fund the support and completion of these requirements.
If such a change should become necessary, the appropriate adjustments will be incorporated by the Administering Contracting Officer under the authority of appropriate changes clause.
Questions Answers 7 Oct 16
052 T 11.1.2.2 -p 11-1-2
Within the paragraph, it states the SP will perform government approved planned work for all 3A work priority and Pest Control and Pavement 3B and 3C work priorities. According to the PWS, 3A work is what used to be categorized as urgent work. This statement infers that all the work listed requires government approval.
Please clarify, that before any 3A, 3B and 3C Pest Control and Pavement work is started that the government must approve of the work?
The Governments intent is stated correctly in the PWS. Please reference 1.1.2.2.2.4.1.4. for Planned Work. Respond to 3A Corrective Maintenance (CM) work, previously categorized as Urgent DSW, within one duty day after notification and complete within 7 calendar days thereafter, excluding material delays days after receipt (Reference paragraph 11.1.2.2.)
054 T 11.1.2.2 -p 11-1-2
This paragraph requires the SP to provide a fall arrest system program. Please provide the workload data for this requirement. There is no workload data for Fall Arrest system program.
055 T 11.1.2.2.2.2.1 - p 11-1-8
Within this paragraph, it states the SP maintain the entire area inside electrical transformer stations that do not belong to Keesler AFB and the petroleum oil lubricant areas.
Will the AF provide a map of these areas or describe them in full? Removed "do not belong to Keesler AFB" Paragraph 11.1.2.2.2.2.1. revised to state, " HERBICIDES: Provide application of herbicides. Schedule and perform weed control maintenance to eliminate weeds and vegetation to include for example, but not limited to, on airfield, fences around ball fields, security areas, joints and cracks in pavements, airfield pavements, roads, sidewalks, storage, and parking areas free of vegetation, as required. Maintain the entire area inside electrical transformer stations that belong to Keesler AFB and the petroleum oil lubricant areas. Remove and take action to prevent return of vegetation on airfield pavements, roads, sidewalks and playgrounds." No additional maps required.
063 T PWS 11 and 12, various sections
Please confirm that all projects designed by the SP will be executed by 81st Contracting Squadron to include projects under $100,000.
The service provider is responsible for execution of projects under $100,000. 81 CONS will execute projects designed by the service provider valued at $100,000 and above.
067 T Attachment 12, GFE/GFP Listing
Item 189, Wheeled excavator is listed twice. Please clarify this double entry. Item 189 was erroneously listed twice. Only one Volvo wheeled excavator will be provided.
069 T 28.3.5.4 -p 28-4-4
The paragraph states that the SP will set-up/take-down/clean up for all official events held at the Bay Breeze Event Center and operate Audio-Visual system during all official events at the Bay Breeze Event Center.
Please clarify/define, what is an "official event?" PWS section 28.3.5 revised to state, "Official events are Commander’s Calls, promotion ceremonies, retirement ceremonies, squadron activities, military graduation ceremonies, military award banquets, etc." See upcoming amendment for revised PWS.
070 T 28.3.1.2 -p 28-4-1
The Bay Breeze Event Center hours of support are listed as a variety of weekday times.
Will official event support be limited to regular weekday duty hours? If not, what is the estimated workload of after hour support?
PWS section 28.3.1.2 revised to state, "Approximately 1-2 times per month there will be an official event that is not within regular weekday duty hours. Each occurrence would require 2-5 hours of set-up, supervision/operation of A-V system, take-down, and clean-up." See upcoming amendment for revised PWS.
071 C L.6.2.3.4, p 63 The paragraph states that the offerors must use the PPI Tool for an electronic submission.
When will the location of the PPI Tool be provided on FBO? Location of the PPI tool was provided on FBO on 27-Sep-16
072 C L.3.1.2, p.53 This paragraph states that tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software.
Default values for Microsoft Word can vary.
Please clarify default values, such as spacing after paragraph. Removed "Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software." and replaced with "No condensed fonts are allowed." See upcoming amendment for revision.
074 C Section B Cell AJ53 on the “KAFB BOS Pricing per PoP” tab of Section B is not totaling all of the CLINs. Will the Government please correct this?
Amendment A001 has corrected this error. See revised Attachment 19.
075 C Section B There are instances in columns P, T, X, AB, AF, and AJ on the “KAFB BOS Pricing per PoP” tab where the formula to multiply the Quantity by the Price is missing. Will the Government release an updated spreadsheet with these formulas included? Or provide additional instructions to complete?
Amendment A001 has corrected this error. See revised Attachment 19.
076 T 11.3.6.1. Utilities Privatization P. 11-3-3
Utilities Privatization states the Air Force has an on-going initiative to pursue public and private resources for it’s electric, natural gas, water and waste water distributions systems, and that the operations and maintenance requirements for these systems may be terminated during the contract term.
For bidding purposes, will the Government provide a date in which the operations and maintenance requirements for these systems will be terminated?
No. Determination date has not been made. Source selection of UP still on-going.
077 T 2.1.2.26.2.
Supplies/Material s P. 2-3-14
Supplies/Materials states the contractor will be provided any supplies/materials at contract start that are left over from the previous contract.
Will the Government provide a materials “plug number” for bidding purposes? If the Government will not provide a “plug number,” will the government provide a notional list of supplies/materials that will be provided to the contractor during contract transition?
The government will not provide a materials “plug number” for bidding purposes. The government will not provide a notional list of supplies.
Language REMOVED from PWS section 2.1.2.26.2.:
The contractor will be provided any supplies/materials at contract start that are left over from previous contract. Any additional supplies/materials for BOS or authorized customers shall be provided by the contractor. The contractor shall bid those costs into the contract price.
078 T 2.3.3.1. Vehicles P. 2-3-1
Vehicles states the Government will make available to the contractor the government owned vehicles as identified in the Scheduled Government Furnished Property listing (section J, Attachment 12).
Will the Government provide a complete listing of GFE currently in use on the existing contract?
A complete listing of GFE Vehicles on the current contract was posted with Amendment 001 (Attachment 22). All other GFE on current contract was included in original solicitation attachments.
079 C Attachment 6 PPI Tool Instructions
Attachment 6, PPI Tool Instructions refer offerors to the FBO site to download the PPI Tool using the link from the All Files column under Notice Details. We are unable to locate this link.
Will the Government update the FBO site to include a link to the PPI Tool? Location of the PPI tool was provided on FBO on 27-Sep-16
083 T 23.1.2.2.8 / pg 23- 1-8
Attachment 19 – KAFB BOS Pricing
Section B 0829016.xlsx
The Section B pricing form included as Attachment 19 requires the bidders to provide separate pricing for APF and NAF dry cleaning and linen exchange services (CLINs X037 thru X040). However, the workload data included in Section 23 for dry cleaning and linen exchange is not identified as APF or NAF.
Can the Government separate the workload data into APF and NAF workloads so that the bidders can accurately price CLINs X037 thru X040?
Items listed as (Lodging) under the Linen Exchange and Dry Cleaning workload data are NAF workloads. All other workload data under these headings are APF
095 T 11-1-2 thru 11-1- 4 / 11.1.2.2
Attachment 19 – Price Proposal Worksheet
CLIN X049 in the Price Proposal Worksheet has a cost-reimbursable NTE amount of $250,000 for CEMAS in accordance with PWS 11.1.2.2. Paragraph 11.1.2.2 summarizes the entire range of Operations and Maintenance requirements for the contract.
Will the Government please clarify its intent in using the $250,000 NTE figure for CLIN 0049, i.e., does it apply to all purchases of material, supplies, and consumables required for all Operations and Maintenance work as summarized in Paragraph 11.1.2.2?
CLIN 0049 is a cost reimbursable CLIN, the dollar value is provided by the Government as is ONLY as estimate, and is not part of the offerors total evaluated price. Additional funds will be added when required.
Questions Answers 7 Oct 16
098 C Attachment 19 –
KAFB BOS
PRICING SECTION
B
In referenced document Column B “Description” text appears to end mid-sentence as there are no symbols noting end of sentence and boxes are locked preventing expansion.
Is the text shown in Column B complete or is there any additional text that needs to be uncovered by allowing Offerors to expand Column B boxes?
Amendment A001 has corrected this error. See revised Attachment 19.
099 C If an Offeror prices SCA wages instead of CBA wages in order to win the competition, would that Offeror, after award of the contract, be entitled to an equitable adjustment to raise the wages to the CBA levels?
The CBA's provided in Attachment 3 are provided for information purposes. The offeror shall propose in accordance with instructions in Section L.4.4.1 (f) of the RFP and FAR 52.222-43(a) and (b).
100 T Demographics - Can the government provide the following demographics breakdown - (a) Percent (%) ratio of participation for the purpose of accurately propose the Medical, Dental and Vision based on Employee Only, Employee +1 and Employee + Family coverage for IAM Local 73 CBA?
(b) Percent (%) ratio of participation for the purpose of accurately propose the Medical, Dental and Vision based on Employee Only, Employee +1 and Employee + Family coverage for IUOE Local 624 CBA?
(c) Percent (%) breakdown of vacation allotment for IAM Local 73 CBA?
(d) Percent (%) breakdown of vacation allotment for IUOE Local 624 CBA?
(e) Percent (%) breakdown of vacation allotment for SCA WD 04-0401?
(f) Percent (%) breakdown of vacation allotment for SCA WD 05-2301?
See Amendment A001 Atch 18 Workforce Demographics.
101 C Section L, L.4.4.1(f) Collective Bargaining Agreement, District Lodge No.
624, Appendix A
L.4.4.1 (f) Statement Of Compliance With
CBA
Attachment 3, Collective Bargaining Agreement District Lodge No. 624 Appendix A denotes the included job titles and applicable wage increases. The wage increases provided within the CBA do not align with the RFP provided period of performance for the base year.
Is it the Government’s intent that the bidders utilize the 2017 rate for the entire base period, or should the offeror blend the provided rates according to the performance year? (2017 – 10 Months & 2018 - 2 Months)
The CBA's provided in Attachment 3 are provided for information purposes. The offeror shall propose in accordance with instructions in Section L.4.4.1 (f) of the RFP and FAR 52.222-43(a) and (b).
102 C Section L, L.4.4.1(f) Collective Bargaining Agreement, District Lodge No.
624, Appendix A
L.4.4.1 (f) Statement Of Compliance With
CBA
Attachment 3, Collective Bargaining Agreement Distric Lodge No. 624 Appendix A denotes the included job titles and applicable wage increases. The wage increases provided within the CBA do not align with the RFP provided period of performance for the Base Year and Option Year 1. In accordance with the Collective Bargaining Agreement, Local 624 Appendix A, employees would receive a pay increase in the Base Period (2017-10 months/2018-2 month blended rate) as well as Option Period 1 (2018 rate).Within section L.4.4.1(f)(i) the offeror is required to provide a statement that we maintain compliance with the provided Collective Bargaining Agreements, however section L.4.4.1(f)iii, the Government provides direction that “the prices proposed for labor covered by the CBA were not escalated beyond the basic period of performance…”.
Can the Government clarify/provide definition of the “basic period of performance” referenced within section L.4.4.1(f)iii. Is it the Government’s intention for escalation not to be used beyond the Base Year of the RFP or the Base Year of the CBA?
If the offeror does not apply the applicable wage increase to the Local 624 employees for 2018, in accordance with the Attachment 3, Collective Bargaining Agreement District Lodge No. 624 Appendix A, will the Government deem the offeror not be Compliant with the Collective Bargaining Agreement 624?
The CBA's provided in Attachment 3 are provided for information purposes. The offeror shall propose in accordance with instructions in Section L.4.4.1 (f) of the RFP and FAR 52.222-43(a) and (b).
103 T 89-90 Appendix
2FD
Please provide the hour meter readings for each “Kubota, Tractor” and “Tractor, Holland”.
The Kubota tractor has 2364 hours. There are two Holland tractors. One Holland tractor has 440 hours, the other Holland tractor has 1996 hours.
104 T 13 B 2 Appendix 13 B
Are crepe myrtles counted in item 12 “Shrubs” or 18 “Tree” quantity? Crepe Myrtles are counted in the “Tree” quantity. Item 12 on Page 13-B-2 of PWS updated to note Crepe Myrtles are included as trees.
106 T 11-1-5 / 11.1.2.2.1.1.
Attachment 19 – Price Proposal Worksheet
The PWS states that the contractor will be responsible for the completion of all roofing projects approved by the Government that are valued at $150,000 or less.
Can the Government clarify if all roofing projects under $150,000 are to be included in the bidders’ FPP, or should only those projects under $100,000 be included in the FFP?
In either case, are the materials for the roofing projects covered under reimbursable CLINs X049 or X050, so that only labor should be included in the
FFP?
Roofing projects under $150,000 should be included in firm fixed price CLIN 0009 - Sustainment.
The materials for roofing materials is funded under CLIN XX49, CEMAS Cost Reimbursable.
107 T 11-1-10 / 11.1.2.2.3.4
The PWS states that the contractor will maintain, repair, replace, modify and operate the airfield lighting systems.
Does the contractor’s responsibility include the runway approach lighting that extends into the Biloxi Back Bay?
Yes, the contractor’s responsibility includes the runway approach lighting that extends into the Biloxi Back Bay.
109 C If the current CBAs expire during the life of the new contract and an Offeror prices SCA wages in the out years after expiration of the CBA, and that Offeror wins the competition, is that Offeror entitled to an upward equitable adjustment to the CBA wages after the new CBA is put into place?
The CBA's provided in Attachment 3 are provided for information purposes. The offeror shall propose in accordance with instructions in Section L.4.4.1 (f) of the RFP and FAR 52.222-43(a) and (b).
110 C RFP Reference L.3.1.6
It is stated that “Volumes I through IV shall not be submitted together within the same binding”.
Is there a Volume IV not shown in the RFP that should be submitted? Amendment A001 has corrected this error. There are only three volumes; Technical, Past perfromance and Price. Section L.3.1.6 has been revised to reflect "Volumes I through III shall not be submitted together within the same binding".
111 C RFP Reference Table L.3.1 and L.3.2
In the table it shows the required amount of CDs per volume, but L.3.2 Electronic Offers states that “Each volume shall be in a different directory on a CD/DVD.”
Please clarify if the CDs required on Table L.3.1 are to be standalone volume content or all volumes are to be on each CD/DVD in different folders.
Amendment A001 has revised Section L.3.2 to clarify this instruction. Each volume should be in a separate CD/DVD for a total of 3 CDs/DVDs.
Questions Answers 7 Oct 16
112 T PWS 23.1.2.1.1.4
/ Page 23-1-3
Individual Protective Equipment (IPE) Function - Next to last sentence in the paragraph appears to be a repeat of the prior sentence. Please clarify.
Section 23.1.2.1.1.4 revised to delete the last sentence, "Inspect, inventory and issue mobility assets." See upcoming amendment for revised PWS.
113 T PWS 23.1.2.1.1.4
/ Page 23-1-3
Supply Hours of Operation - Last item on chart, Linen Exchange. There is no workload for this requirement, and where does it fit within the Supply Chain of requirements. Please clarify the requirement.
Linen Exchange and Dry cleaning workload data can be found in appendix 23B beginning on page 23-B-4. This requirement falls under Supply Services.
114 C Atch 05 PPI Sheets L.6.2.3 L.6.2.3.4
Per L.6.2.3, offeror shall submit PPI sheets IAW format contained in Section J, Attachment 5. Per L.6.2.3.4 PPI Tool, offerors must use the PPI Tool in order to electronically submit the PPI required in Section L.6.2.3.
The information requested in Attachment 5 (F. - H.) differs from the information requested in the PPI Tool. The PPI Tool does not allow us to add cells for the additional information requested in Attachment 5. Would the government clarify how/where offerors are to address Attachment 5, items F. - H.?
Section L.6.2.3.4 states "Offerors must use the PPI Tool in order to electronically submit the Past Performance Information required in Section L.6.2.3 IAW the RFP." Since Sections F-H of Attachment 5 are not included in the PPI Tool, Offerors do not need to include these sections in the PPI Tool. However, they are still responsible for submitting the PPI Sheets (Attachment 5 format to include all sections) in accordance with Section L.6.2.3.
115 C Atch 19 - Price Proposal Worksheet
Attachment 19, cells AB8 and AJ37 appear to have a formula error in the calculations of CLINs 5002 and 7031. Cell AB8 calculates the price per month of CLIN 5004 and AJ37 calculates the price per month for CLIN 7030.
Would the government confirm the calculations of CLINs 5002 and 7031 in cells AB8 and AJ37 to be accurate (AB8 appears to pull from CLIN 5004 and AJ37 from CLIN 7030)?
Formulas have been corrected and Attachment 19 was revised accordingly. See upcoming amendment for revised document.
131 T PWS Section 2.1.1.7
PWS paragraph 2.1.1.7 Personnel Appearance follows paragraph 2.1.2.6 and precedes paragraph 2.1.2.7.1.
Should paragraph 2.1.1.7 instead be paragraph 2.1.2.7? If so, please amend the
PWS.
Changed PWS reference from 2.1.1.7. to 2.1.2.7. See upcoming amendment for revised PWS.