AMENDMENT NO. FA3002-06-R-0004-0014 05 May 2008 Base Operating Services at Maxwell-Gunter, AL
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
1 24
2. AMENDMENT/MODIFICATION NO.
FA3002-09-R-0035-0005
4. REQUISITION/PURCHASE REQ. NO.
3. EFFECTIVE DATE
3 March 2010
1. CONTRACT ID CODE
(x)
7. ADMINISTERED BY (If other than Item 6) CODE
6. ISSUED BY CODE
AETC CONTRACTING SQUADRON (Capt Melissa Fields) 2021 First Street West, Bldg 853
RANDOLPH AFB TX 78150-4302
CONTRACTING OFFICER: Charles Wingerter (210) 652-3424
FA3002
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and ZIP Code)
CODE FACILITY CODE
9A. AMENDMENT OF SOLICITATION NO.
FA3002-09-R-0035
9B. DATED (SEE ITEM 11)
11 Sep 09
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
X
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers |X| is extended, |_| is not extended.
Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the Following methods: (a) By completing Items 8 and 15, and returning (SEE SECTION L) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organize by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate changes in Section F “Periods of Performance” and Section G “Ordering Procedures”.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, remain unchanged and in full force and effect 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type of Print)
15A. NAME AND TITLE OF SIGNER (Type or Print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16A. UNITED STATES OF AMERICA
BY ________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
15C. DATE SIGNED
5. PROJECT NO. (IF APPLICABLE)
AMENDMENT FA3002-09-R-0035-0005
Integrated Solid Waste Management
AMENDMENT FA3002-09-R-0035-0004
Integrated Solid Waste Management
Block 14, Continuation
1) Page 61 of 142; FY10 Task Orders is changed from:
“FY10 Task Orders - Goodfellow, Sheppard & Keesler:
| Base Period | | 1 Apr 2010 through 30 Sep 2010 (Does not include 30 day | |
| | | mobilization) |
| 1st Option Period: | 1 Oct 2010 through 30 Sep 2011 | | |
| 2nd Option Period: | 1 Oct 2011 through 30 Sep 2012 | | |
| 3rd Option Period: | 1 Oct 2012 through 30 Sep 2013 | | |
| 4th Option Period: | 1 Oct 2013 through 30 Sep 2014” | | |
To
“FY10 Task Orders - Goodfellow, Sheppard & Keesler:
| Base Period | | 5 Jul 2010 through 30 Jun 2011 (Mobilization 5-31 July, Contract Performance 1 Aug 2010 thru 30 Jun 2011) |
| 1st Option Period: | 1 Jul 2010 through 30 Jun 2011 | |
| 2nd Option Period: | 1 Jul 2011 through 30 Jun 2012 | |
| 3rd Option Period: | 1 Jul 2012 through 30 Jun 2013 | |
| 4th Option Period: | 1 Jul 2013 through 30 Jun 2014” | |
2) Pages 62 – 70; The Periods of Performance Have been changed from:
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
30-SEP-2010
FOB: Destination
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
30-SEP-2010
31-MAR-2010
| 0020 |
| TBD |
| N/A |
| RANDOLPH AIR FORCE BASE, TX |
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
30-SEP-2011
31-OCT-2010
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
30-SEP-2012
31-OCT-2011
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
30-SEP-2013
POP 01-OCT-2012 TO
30-SEP-2013
N/A
MULTIPLE LOCATIONS
30-SEP-2013
30-SEP-2013
31-OCT-2012
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
30-SEP-2014
POP 01-OCT-2013 TO
30-SEP-2014
N/A
30-SEP-2014
30-SEP-2014
31-OCT-2013
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
30-SEP-2015
POP 01-OCT-2014 TO
30-SEP-2015
N/A
30-SEP-2015
30-SEP-2015
31-OCT-2014
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
30-SEP-2016
POP 01-OCT-2015 TO
30-SEP-2016
N/A
30-SEP-2016
30-SEP-2016
31-OCT-2015
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
30-SEP-2017
POP 01-OCT-2016 TO
30-SEP-2017
N/A
30-SEP-2017
30-SEP-2017
31-OCT-2016
To
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN-2011
30-JUN- 2011
| 0020 |
| TBD |
| N/A |
| RANDOLPH AIR FORCE BASE, TX |
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2012
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2013
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2014
POP 01-JUL-2013 TO
30-JUN-2014
N/A
30-JUN-2014
30-JUN-2014
30-JUN-2014
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2015
POP 01-JUL-2014 TO
30-JUN-2015
N/A
30-JUN-2015
30-JUN-2015
30-JUN-2015
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2016
POP 01-JUL-2015 TO
30-JUN-2016
N/A
30-JUN-2016
30-JUN-2016
30-JUN-2016
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2017
POP 01-JUL-2016 TO
30-JUN-2017
N/A
30-JUN-2017
30-JUN-2017
30-JUN-2017
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
30-JUN-2018
POP 01-JUL-2017 TO
30-JUN-2018
N/A
30-JUN-2018
30-JUN-2018
30-JUN-2018
3) Pages 72 – 75; Paragraphs 6.0 and 7.0 have been changed from:
“6.0 Ordering Procedures:
6.1 These ordering procedures apply to follow-on orders after the basic award and do not apply to Goodfellow, Sheppard and Keesler TOs. Each task order issued will include a one-year base period (which includes 30 day mobilization period) plus four (4) one-year option periods with an Option to Extend Services clause. At no time will any base be authorized to utilize the basic contract for services which exceed a five (5) year period plus the six (6) month extension of services.
6.2 The Government will prepare the PWS Appendices specifying the individual base requirements.
6.3 AETC CONS will conduct streamlined Performance Price Tradeoff (PPT) source selections for TOs. Specific evaluation criteria for individual TOs will be identified in the TO solicitation.
6.3.1 AETC CONS will send solicitations for additional TOs to ISWM Contractors electronically and provide a due date for related questions and submission of the Contractor's Technical (if determined by the contracting officer to be necessary), Price and Past Performance proposals. When deemed appropriate for a particular requirement, depending upon the urgency and tight deadlines, the customer may request oral proposals in lieu of written proposals. All prime Contractors will be given a fair opportunity to submit an offer and have that offer fairly considered for each order. The contracting officer must consider all multiple awardees, unless they determine one of the four statutory exceptions to the fair opportunity process applies. The four statutory exceptions, listed in FAR 16.505(b)(2)(i) through (iv) as follows:
1. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays;
2. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;
3. The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order;
4. It is necessary to place an order to satisfy a minimum guarantee.
6.4 It is the intent of AETC CONS and HQ AETC/A7C to conduct site visits at each base prior to receipt of proposals for the individual base TOs. Pre-proposal conferences will be conducted prior to receipt of TO proposals and the date and location will be specified at the time of solicitation release. The pre-proposal conference will provide Contractors an opportunity to ask questions and seek clarification of the Government's requirements as stated in the PWS. This exchange of information enables Contractors to understand task requirements clearly so that they can in turn prepare technical, price and past performance proposals that are responsive to the customer's requirements.
6.5 The due date for receipt of proposals will be specified in each TO solicitation. While preparing their proposals, Contractors must never communicate with anyone other than the CO on any issue related to the task.
7.0 Contractors:
7.1 Contractors will receive TO solicitations for the individual bases. These solicitations may combine multiple bases into a single solicitation in which individual TOs for each base will be issued, unless specified otherwise. In response to each TO solicitation, Contractors will be asked to prepare streamlined technical, price and past performance proposals particular to the individual base(s) solicited at that time. Contractors are responsible for reasonably proposing on all TOs solicited under this acquisition.
7.2 When the PCO issues an executed (signed) task order which authorizes a Contractor to start work on the task, the Contractor will perform work as described in the PWS of the awarded task order. Contractor performance must conform to all terms and conditions of the basic contract as well as the TO.
7.3 On all TOs, Contractors must ensure that their personnel do not perform any work which is outside the scope of the PWS or the period of performance.
7.4 Contractors will be evaluated on their performance by their customers in accordance with the PWS. At the Government's request, Contractors may provide comments on the customer's evaluation of a completed task.
7.5 The government intends to award individual TOs without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest. If the government elects to hold discussions, a competitive range will be established based on FAR 15.306(c) procedures and the TO solicitation.
7.6 These ordering procedures do not guarantee the contractor issuance of any TO above the minimum order of $1,500 as stated in FAR 52.216-19 of this contract.
7.7 Under the provisions of the Federal Acquisition Streamlining Act of 1994, 10 U.S.C. 2304 (c) (Public Law 103.355), a protest is not authorized in connection with the issuance or proposed issuance of an individual TO except on the grounds that the order increases the scope, period or maximum value of the contract under which the TO is issued.”
To
“6.0 Ordering Procedures:
6.1 These ordering procedures apply to follow-on orders after award of the basic contracts and do not apply to Goodfellow, Sheppard and Keesler TOs. Each task order issued will include a one-year base period (which includes 30 day mobilization period) plus four (4) one-year option periods with an Option to Extend Services clause. At no time will any base be authorized to utilize the basic contract for services which exceed a five (5) year period plus the six (6) month extension of services.
6.2 The Government will prepare the PWS Appendices specifying the individual base requirements.
6.3 AETC CONS will utilize an acquisition approach within the Best Value Continuum (e.g. PPT, LPTA…) to award of each TO. The acquisition approach will be determined by the contracting officer for each task order prior to the release of the solicitation for each TO. Specific evaluation criteria for individual TOs will be identified in the TO solicitation.
6.3.1 AETC CONS will send solicitations for additional TOs to ISWM Contractors electronically and provide a due date for related questions and submission of the Contractor's proposal(s). Proposals will include Technical, Price and Past Performance volumes as appropriate depending on the selected best value acquisition approach.
6.3.2. FAIR OPPORTUNITY - All prime contract awardees under this Multiple Award Task Order Contract (MATOC) will be given a fair opportunity to submit an offer and have that offer fairly considered for each order. The contracting officer will consider proposals from prime contract awardees only. The contracting officer may waive Fair Opportunity if one of the four statutory exceptions to the fair opportunity process applies. The four statutory exceptions listed in FAR 16.505(b)(2)(i) through (iv) are as follows:
1. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays;
2. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;
3. The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order;
4. It is necessary to place an order to satisfy a minimum guarantee.
6.4 It is the intent of AETC CONS and HQ AETC/A7C to conduct preproposal conferences at each base prior to receipt of proposals for the individual base TOs. Offerors will be given an opportunity to view the site(s) during the conference(s). The date and location will be specified at the time of solicitation release. The pre-proposal conference provides Contractors an opportunity to ask questions and seek clarification of the Government's requirements as stated in the PWS. This exchange of information enables Contractors to understand task requirements clearly so that they can in turn prepare technical, price and past performance proposals that are responsive to the customer's requirements.
6.5 The due date for receipt of proposals will be specified in each TO solicitation. The PCO is the single point of communication once solicitations have been released for a TO. Communications relative to a TO under solicitation with government personnel other than the PCO may result in the offeror being excluded from the competition in order to preserve the procurements integrity.
7.0 Contractors:
7.1 Offerors will receive TO solicitations for the individual bases. The government may combine multiple bases into a single solicitation. Individual TOs for each base may be issued, or a TO combining multiple bases may be issued, as appropriate. In response to each TO solicitation, Contractors selected for a basic award will be asked to prepare proposals particular to the individual base(s) solicited at that time. Each offeror may also provide one additional proposal that combines more than one base being solicited. However, an offeror providing a combined proposal must also submit individual proposal for the bases they are proposing to. In the event that a combined proposal leads to an increased price for any single base, the combined proposal may be ineligible for award. Contractors are required to provide a proposal on all TO solicitations. The government reserves the right to annotate as negative past performance failure to do and may impact a contractor’s ability to win future task orders.
7.1.1. Example Scenario – The figures used in the sample below are used to illustrate the selection process when multiple proposals are submitted. They do not in any way represent the government’s position regarding the estimated value for the requirements at Columbus, Laughlin, Maxwell and Tyndall AFBs. Assumptions: All proposals are considered technically acceptable and there are no performance issues that would impede an award to any contractor. Technical and performance being equal, the remaining discriminator for award of a task order is price. In the scenario below, contractors A and C provided an additional proposal that leverages their ability by performing at more than one location. Based on the criteria that the combined proposal must be lower in price and that the government will not pay a higher price at any base for the combined approach, Contractor A would win Columbus and Maxwell AFBs. Their proposed Total Evaluated Price (TEP) is lower overall and also represents the lowest proposed price individually for the installations proposed in the combined proposal. Individually contractor A would have been successful for Columbus AFB; however contractor C would have been the successful proposal for Maxwell. In this case the consolidated approach would be in the best interest of the government. Contractor B would be the successful proposal at Laughlin AFB as they represent the lowest proposed TEP. Contractor C proposed a combined approach to meet the requirements for Maxwell and Tyndall AFBs; however their proposed TEP for the combined approach is not the lowest proposed price and therefore contractor C would not be the successful proposal for any of the TOs. Contractor D would the successful proposal for the Tyndall AFB requirement as their TEP is lowest overall.
| Columbus |
| $ 100.0 |
| $ 98.0 |
| $ 99.0 |
| $ 110.0 |
$ 102.0
$ 97.5
| Maxwell |
| $ 101.5 |
| $ 99.0 |
| $ 102.0 |
| $ 101.0 |
| $ 100.5 |
| $ 104.6 |
| $ 107.0 |
| $ 106.0 |
| $ 103.0 |
| $ 101.5 |
Sample Ordering Procedures Scenario
7.2 When the PCO issues an executed (signed) task order which authorizes a Contractor to start work on the task, the Contractor will perform work as described in the PWS of the awarded task order. Contractor performance must conform to the terms and conditions of the basic contract as well as the TO.
7.3 Contractors will be evaluated on their performance in accordance with the PWS and the Services Summary for the basic contract and any issued TOs.
7.4 The government intends to award individual TOs without discussions with respective contractors. However, the government reserves the right to conduct discussions if deemed in its best interest. If the government elects to conduct discussions, the procedures of FAR 15.306(c) will apply.
7.5 These ordering procedures do not guarantee the contractor consideration above the minimum order of $1,500 as stated in FAR 52.216-19 of this solicitation and the resulting contract.
7.6 Under the provisions of the Federal Acquisition Streamlining Act of 1994, 10 U.S.C. 2304 (c) (Public Law 103.355), a protest is not authorized in connection with the issuance or proposed issuance of an individual TO except on the grounds that the order increases the scope, period or maximum value of the contract under which the TO is issued. “