Amendment FA3002-09-R-0035-0004 20091021.pdf

PDF 22 KB Posted

Attached to
Integrated Solid Waste Management (ISWM) Federal contract opportunity
Solicitation number
FA3002-09-R-0035
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

FA3002-09-R-0035 Amendment 4

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Solid Waste Management (ISWM), newest first.
File Type Posted
DOL-WD Sheppard.pdf PDF
DOL-WD Goodfellow.pdf PDF
Amendment FA3002-09-R-0035-0006 20100315.docm DOCM document
Attachment 3 - Schedule B —
ISWM RFP FA3002-09-R-0035-0005(Conformed).doc DOC document
ISWM Notice to Offerors - Response Date and Time Reminder.pdf PDF
2009fedleader_eo_rel.pdf PDF
Keesler App A Table B.xlsm XLSM spreadsheet
Keesler App A Table A1-1.xls XLS spreadsheet
ISWM RFP--Amendment 0003 —
Tech Library Information - 2 Oct 09.zip ZIP file
Keesler AETC ISWMP Draft May09.pdf PDF
Goodfellow AETC ISWMP Draft Aug09.pdf PDF
Q A's Revisions 18 Sep 09.pdf PDF
Impact of Teaming Arrangements on Small Business Status —
ISWM Pre-Proposal Conference 18 Sep 09.pdf PDF
Attachment 4 - Past Performance Questionnaire —
Keesler WD-05-2301.TIF TIF image
Sheppard WD-05-2526.TIF TIF image
ISWM Notice to Offeror - RFP Posting Update 31 Jul 09.pdf PDF
RFP Working Draft 17 Jul 09.pdf PDF
Keesler Agenda.pdf PDF
ISWM Notice to Offeror - Site Visit Dates Keesler AFB.pdf PDF
ISWM Keesler Site Visit Registration Form.pdf PDF
DRAFT Section J - Attachment XX Past Performance Questionnaire 2 Jun 09.doc DOC document
DRAFT Section J - Attachment XX Subcontractor-Teaming Partner Consent Letter.doc DOC document
Site Visit Briefing 2 Jun 09.ppt PPT presentation
ISWM Notice to Offeror - Site Visit Dates Goodfellow Sheppard.pdf PDF
Comment Question Submission Form.xls XLS spreadsheet
ISWM Notice to Offeror - Site Visit Cancellation.pdf PDF
ISWM PWS —
Maxwell Additional Workload Data.zip ZIP file
Altus Table A2 PDF.pdf PDF
Columbus-Table A1 PDF.pdf PDF
Vance Workload Data.zip ZIP file
Luke Workload Data.zip ZIP file
Columbus-Table A1-SW Supp Data PDF.pdf PDF
Laughlin Workload Data.zip ZIP file
Randolph Workload Data.zip ZIP file
Altus Table A1 PDF2.pdf PDF
Maxwell Workload Data.zip ZIP file
Altus Appendix C-GFE PDF.pdf PDF
Columbus-Table A1 PDF.pdf PDF
Sheppard Workload Data.zip ZIP file
Altus Table A1- Recy Supp Data PDF2.pdf PDF
Appendix A - Table A4 - Program Descriptions.zip ZIP file
Lackland Workload Data.zip ZIP file
Columbus Appendix C-GFE PDF.pdf PDF
Columbus-Table A1-SW Supp Data PDF.pdf PDF
ISWM Industry Day Briefing —
Show all 50

Integrated Solid Waste Management (ISWM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT FA3002-09-R-0035-0004

Integrated Solid Waste Management

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

FA3002-09-R-0035-0004

4. REQUISITION/PURCHASE REQ. NO.

3. EFFECTIVE DATE

21 Oct 2009

1. CONTRACT ID CODE

(x)

7. ADMINISTERED BY (If other than Item 6) CODE

6. ISSUED BY CODE

AETC CONTRACTING SQUADRON (Capt Melissa Fields) 2021 First Street West, Bldg 853

RANDOLPH AFB TX 78150-4302

CONTRACTING OFFICER: Charles Wingerter (210) 652-3424

FA3002

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and ZIP Code)

CODE FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

FA3002-09-R-0035

9B. DATED (SEE ITEM 11)

11 Sep 09

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

X

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the Following methods: (a) By completing Items 8 and 15, and returning (SEE SECTION L) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organize by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate changes to the Request for Proposal. See block 14 for the specific changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, remain unchanged and in full force and effect 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type of Print)

15A. NAME AND TITLE OF SIGNER (Type or Print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16A. UNITED STATES OF AMERICA

BY ________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

15C. DATE

SIGNED

5. PROJECT NO. (IF APPLICABLE)

AMENDMENT FA3002-09-R-0035-0004

Integrated Solid Waste Management

Block 14, Continuation

1) The SF 1449, Block 8 is changed from “04:30 CT 27 Oct 2009” to “4:30 PM CT, 4 Nov 2009”

2) Page 125, Addendum to 52.212-1, Instructions to Offerors, Commercial Items, the table at the bottom of the page. The submittal dates for Volumes 1 and II, are changed from “27 October 2009/4:30 pm Central Time” to “4 November 2009/4:30 pm Central Time”.

3) Attachment 1, PWS, Cover Page; The date is changed from, “29 September 2009” to “20 October 2009”

4) Page 3, Table of Contents, Section 6, subline B was reincorporated into the document.

5) Page 4, Paragraph 1.1, Resource Management Purpose; The goal is changed from “40%” to “50%”.

6) Page 7, Paragraph 2.1.1.8. Relocation of Containers, is added.

7) Page 10, Paragraph 2.2.3. Solid Waste Diversion; the 5th line of the paragraph is changed from “…(ISWM) to achieve these goal. The diversion goal for non-hazardous…” to “…(ISWM) to achieve these goal. Additionally, the AF is bound by a new Executive Order, dated 5 Oct 09, in which the diversion goal is 50% by 2015. The diversion goal for non-hazardous…”

8) Appendix A, Table A1-1 Solid Waste Disposal Tonnages, Keesler, FY09 Workload Data was added.

9) Appendix A, Table B - Tasks and Estimated Frequencies, Keesler, The appendix has been updated to include collection frequencies.

File details come from the government source that posted it. Updated .