Addendum 1 _DTRA Renovation 3rd Floor Bldg 13a.docx

DOCX document 16 KB Posted

Attached to
Renovation of 3rd floor building 13A
Solicitation number
FA282325R0008
Issued by

About this file

This document is an Addendum to a federal solicitation for the renovation of the 3rd floor of Building 13A at a Department of the Air Force Materiel Command Test Center facility. The addendum, dated 30 May 2025, revises multiple architectural and specification documents for the project, including demolition plans, ceiling plans, wall sections, and adding new specification sections for unit masonry, laminate casework, door hardware, and plumbing.

The associated federal contract opportunity (Solicitation FA282325R0008) involves a comprehensive renovation estimated between $5-10 million, covering approximately 6,800 square feet. The scope includes selective demolition of interior spaces, modifications to conference rooms, offices, corridors, and a breakroom, along with replacement of HVAC and electrical systems. The project will be constructed in accordance with ICD 705 standards, with the renovation focusing on transforming existing interior spaces and upgrading critical building infrastructure.

View the file

Other files

File Type Posted
04 20 00.pdf PDF
08 71 00.pdf PDF
06 41 16.00 10.pdf PDF
AD-101 DEMOLITION PLAN.pdf PDF
A-110 NEW WORK REFLECTED CEILING PLAN.pdf PDF
DTRA 13A 3rd Floor RFIs_all_Contracting_FINAL.docx DOCX document
A-311 WALL SECTIONS.pdf PDF
EGLIN EMCS AND-OR DDC SYSTEM REQUIREMENTS.pdf PDF
A-312 WALL SECTIONS.pdf PDF
22 00 00.pdf PDF
A-310 WALL SECTION.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTFA 23 VH79 DTRA Renovation 3rd Floor Bldg 13a FA282325R0008 - Addendum #1 30 May 2025

This addendum is issued to replace, supplement, and revise the plans and specifications listed below. They shall become an integral part of the project plans and specifications.

1. Drawing AD101 Demolition Plan – Please replace the drawing with the attached, which was revised on 22 May 2025. This is to clarify the demolition in Rm 391.

2. Drawing A-110 New Work Reflected Ceiling Plan - Please replace the drawing with the attached, which was revised on 22 May 2025. This is to adjust the lighting plan to match with the electrical drawings.

3. Drawing A-310 Wall Sections and Plan Details – Please replace the drawing with the attached, which was revised on 22 May 2025. Key Note No. 15 has been revised and #18 has been added to the revised drawing.

4. Drawing A-311 Wall Sections and Plan Details – Please replace the drawing with the attached, which was revised on 22 May 2025. Key Note No. 15 has been revised and #18 has been added to the revised drawing.

5. Drawing A-312 Wall Sections and Plan Details – Please replace the drawing with the attached, which was revised on 22 May 2025. Key Note No. 13 has been revised and #18 has been added to the revised drawing.

6. Specifications Section 04 20 00 Unit Masonry – Please add this section in its entirety to the project specifications.

7. Specifications Section 06 41 16.00 10 Laminate Clad Architectural Casework – Please add this section in its entirety to the project specifications.

8. Specifications Section 08 71 00 Door Hareware – Please replace this section in its entirety the attached revised Section 08 71 00. This is to revise Hardware Set 4.0.

9. Specifications Section 22 00 00 Plumbing General Purpose – Please add this section in its entirety to the project specifications.

10. Eglin EMCS and/or DDC System Requirements – Please add this document in its entirety in the specifications as Appendix D.

File details come from the government source that posted it. Updated .