The document is a New Work Reflected Ceiling Plan (drawing A-110) for the DTRA Renovation project on the 3rd floor of Building 13A at Eglin Air Force Base in Florida. The architectural drawing provides a detailed ceiling layout with specific installation guidelines, including:

Key technical requirements include coordinating ceiling and sprinkler head installations, ensuring sprinkler heads are centered on ceiling tiles, and maximizing ceiling heights after accommodating structural, mechanical, electrical, fire protection, and telecommunications systems. The plan covers multiple spaces including offices, conference rooms, break areas, storage, and corridors, with specific notes about protecting and repairing ceilings during HVAC installation and adjusting lighting placement to match electrical drawings. The drawing is marked as an as-built revision dated 23 Oct 2024, with a scale of 3/16" = 1'-0", and follows construction standards including ICD/IDS 705 and UFC-4-010-05 guidelines.

View the file

Other files

File Type Posted
04 20 00.pdf PDF
08 71 00.pdf PDF
06 41 16.00 10.pdf PDF
AD-101 DEMOLITION PLAN.pdf PDF
DTRA 13A 3rd Floor RFIs_all_Contracting_FINAL.docx DOCX document
A-311 WALL SECTIONS.pdf PDF
EGLIN EMCS AND-OR DDC SYSTEM REQUIREMENTS.pdf PDF
A-312 WALL SECTIONS.pdf PDF
22 00 00.pdf PDF
A-310 WALL SECTION.pdf PDF
Addendum 1 _DTRA Renovation 3rd Floor Bldg 13a.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND:

D

987654321

C

B

A

BLBLBL

BL

BL

NEW WORK REFLECTED CEILING PLAN

SCALE: 3/16" = 1'-0"

NORTH

GENERAL NOTES:

1. COORDINATE CEILING INSTALLATION AND SPRINKLER HEAD

INSTALLATION. LOCATE SPRINKLER HEADS AS CLOSE TO THE

CENTERLINE OF CEILING TILE AS POSSIBLE. SPRINKLER HEADS

SHALL NOT CONFLICT WITH CEILING GRID. SEE FIRE

PROTECTION DOCUMENTS.

2. IT IS THE INTENT TO HAVE THE CEILING HEIGHTS THROUGHOUT

THE BUILDING AS HIGH AS POSSIBLE. CEILING HEIGHTS SHALL

BE ADJUSTED UPWARD WHENEVER POSSIBLE AFTER ALL

STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION

AND TELECOMMUNICATIONS ITEMS HAVE BEEN INSTALLED.

3. REFER TO FIRE PROTECTION, MECHANICAL, ELECTRICAL AND

COMMUNICATIONS DOCUMENTS FOR ADDITIONAL RELATED

WORK.

4. CONTRACTOR SHALL FIELD-VERIFY ALL DIMENSIONS AND

CONDITIONS, AND NOTIFY THE CONTRACTING OFFICER OF ANY

CONFLICTS OR DISCREPANCIES PRIOR TO BEGINNING ANY

WORK.

LIGHTING FIXTURE, SEE ELECTRICAL

DOCUMENTS.

DIFFUSER, SEE MECHANICAL DOCUMENTS.

2x2 ACOUSTICAL CEILING TILE AND METAL

GRID. ALL CEILING HEIGHTS AT 8'-6" U.N.O.

SEE FINISH SCHEDULE, SHEET I-6__.

CEILING MOUNTED EQUIPMENT, SEE

ELECTRICAL AND TELECOM DOCUMENTS.

MOISTURE RESISTANT GYPSUM

WALLBOARD CEILING, PAINTED. ALL

CEILING HEIGHTS AT 9'-0" U.N.O. SEE

FINISH SCHEDULE, SHEET I-601

MD

S

BL

EXIST. MECH

E383

PFM

384A

LARGE

CONF. ROOM

EXIST. MENS

E390

EXIST.

STAIR #2

E388

EXIST.

WOMENS

E389

BREAK

OPEN OFFICE

EXIST. SHARED

CONFERENCE

E380

MAN TRAP

BC

SCIF

CONFERENCE

EXIST.

STAIR #1

E398

EXIST. CORR.

E379

EXIST. BREAK

E380A

EXIST. A / V

E380B

EXIST. ENTRY

E380C

DIV. CHIEF

381A

DIV

DO

EXIST.

CHASE

OFFICE

OFFICE

MAN TRAP

EXIST.

CORRIDOR

STORAGE

CORRIDOR

DEP

PFM

384B

COMM.

COMM.

382A

COLAB

9' - 0"

9' - 0"

9' - 0" CEILING HEIGHT IDENTIFIER

KEYNOTES:

PROTECT AND REPAIR ANY DAMAGED CEILINGS

DAMAGED DURING INSTALLATION OF NEW HVAC.

SEE MECHANICAL DRAWINGS.

LIGHTING PLACEMENT ADJUSTED

TO MATCH ELECTRICAL DRAWINGS.

KEY PLAN

NOT TO SCALE

CONSTRUCTION WILL BE IAW

ICD/IDS 705 AND UFC-4-010-05

NOTE:

96 CEG, OFFICE FORM 002, FY2013

AS-BUILT

PDM

REVISION DATE DESCRIPTION BY APPR'D

23AJ FTFA23-VH79 23AJ

23 OCT. 2024

AS SHOWN

DTRA RENOVATION

3RD FLOOR BLDG 13A

BASE CIVIL ENGINEER EGLIN

AIR FORCE BASE, FLORIDA

BWA

A-110

NEW WORK REFLECTED CEILING PLAN

SCALE: 3/16" = 1'-0"

2'-8" 5'-4"0 10'-8"

1 05/22/25 RFI ADJUSTMENTS KRW PDM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SIGNATURE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

CENM

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJ. ENGR.

AutoCAD SHX Text

CONTENTS

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

SPEC. NO.

AutoCAD SHX Text

INDEX NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

96 CEG/CEN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

BASE CIVIL ENGINEER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SHEET OF

Sheets and Views
A-110

File details come from the government source that posted it. Updated .