AD-101 DEMOLITION PLAN.pdf

PDF 343 KB Posted

Attached to
Renovation of 3rd floor building 13A
Solicitation number
FA282325R0008
Issued by

About this file

The document is an Existing/Demolition Plan (drawing AD101) for a renovation project at Eglin Air Force Base, specifically targeting the 3rd floor of Building 13A. The plan details comprehensive interior demolition work, including removal of existing wall construction, floor finishes, ceiling tiles, lighting fixtures, systems furniture, demountable partitions, and mechanical/electrical components. Specific areas to be demolished include open office spaces, conference rooms, restrooms, storage areas, reception, and corridors. Key demolition notes indicate sawcutting window sills, removing existing studs and gypsum board, and preparing surfaces for new construction. The drawing is scaled at 3/16" = 1'-0" and is dated 23 October 2024, with a revision note for RFI adjustments on 05/22/25. The project will be executed in accordance with ICD/IDS 705 and UFC-4-010-05 standards, covering approximately 6,800 square feet of interior renovation space.

View the file

Other files

File Type Posted
04 20 00.pdf PDF
08 71 00.pdf PDF
06 41 16.00 10.pdf PDF
A-110 NEW WORK REFLECTED CEILING PLAN.pdf PDF
DTRA 13A 3rd Floor RFIs_all_Contracting_FINAL.docx DOCX document
A-311 WALL SECTIONS.pdf PDF
EGLIN EMCS AND-OR DDC SYSTEM REQUIREMENTS.pdf PDF
A-312 WALL SECTIONS.pdf PDF
22 00 00.pdf PDF
A-310 WALL SECTION.pdf PDF
Addendum 1 _DTRA Renovation 3rd Floor Bldg 13a.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND:

EXISTING CONSTRUCTION TO REMAIN.

EXISTING CONSTRUCTION TO BE REMOVED.

D

987654321

C

B

A

EXISTING / DEMOLITION PLAN

SCALE: 3/16" = 1'-0"

PROJECT

NORTH

EXIST. MECH

E383

EXIST. MENS

E390

EXIST.

STAIR #2

E388

EXIST.

WOMENS

E389

EXIST. COMM.

E382A

EXIST. SHARED

CONFERENCE

E380

EXIST. CORR.

E378

EXIST. SCIF

E396

EXIST.

SHARED VAULT

E397

EXIST.

STAIR #1

E398

EXIST. CORR.

E379

EXIST. BREAK

E380A

EXIST. A / V

E380B

EXIST. ENTRY

E380C

EXIST.

DIV. CHIEF

381A

EXIST.

OFFICE #2

E396B

EXIST.

OFFICE #1

E396A

EXIST.

CHASE

KEY NOTES:

EXIST. OPEN

OFFICE SPACE NORTH

EXIST. OPEN

OFFICE SPACE SOUTH

EXIST.

UPS

382B

EXIST.

STOR.

EXIST. WAITING

EXIST. RECEPT.

EXIST. CONF.

EXIST.

BRANCH CHIEF

EXIST. STOR.

EXIST. CORR.

EXIST. DEPUTY

DIRECTOR

EXIST. VISITOR

EXIST. BRANCH

CHIEF

REMOVE EXISTING DOOR & FRAME, CLEAN, PATCH, REPAIR AND PREP OPENING FOR

NEW STC 50 RATED HOLLOW METAL DOOR AND FRAME.

REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM, LIGHTING FIXTURES

AND ALL CEILING MOUNTED EQUIPMENT IN IT'S ENTIRETY.

REMOVE AND DISPOSE OF EXISTING SYSTEMS FURNITURE, DEMOUNTABLE PARTITIONS

AND ALL OTHER FURNITURE IN THEIR ENTIRETY.

REMOVE EXISTING FURRING AROUND COLUMN. COLUMN TO REMAIN (TYPICAL AS INDICATED).

REMOVE EXISTING WALL CONSTRUCTION AND FLOOR FINISH IN ITS ENTIRETY.

PREPARE FLOOR SLAB TO RECEIVE NEW FINISHES.

REMOVE EXISTING DOOR AND FRAME IN THEIR ENTIRETY.6

REMOVE AND DISPOSE OF EXISTING RECEPTIONIST COUNTER.7

REMOVE EXISTING CABINETRY AND REFRIGERATOR.8

REMOVE EXISTING WALL CONSTRUCTION BACK TO EXISTING CMU WALL.9

REMOVE EXISTING FLOOR FINISH AND BASE. CLEAN AND PREP SURFACE TO RECEIVE

NEW FINISH. REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM AND ALL

CEILING MOUNTED EQUIPMENT.

10 2

REMOVE EXISTING STUDS, GYPSUM BOARD, FURRING AROUND

COLUMNS AND ALL EXISTING FINISHES FROM INTERIOR FACE OF

EXISTING EXTERIOR WALLS. SAWCUT EXISTING WINDOW SILL FLUSH

WITH FACE OF EXISTING CMU WALL.

10 2

9 9

1111111111 11 11

4 4

11111111111111

NO WORK THIS AREA.12

5 5 5

555555

5 5 5 5 5

REMOVE EXISTING GYPSUM BOARD CEILING, LIGHTING FIXTURES

AND ALL CEILING MOUNTED EQUIPMENT IN IT'S ENTIRETY.

X

KEY PLAN

NOT TO SCALE

CONSTRUCTION WILL BE IAW

ICD/IDS 705 AND UFC-4-010-05

NOTE:

96 CEG, OFFICE FORM 002, FY2013

AS-BUILT

PDM

REVISION DATE DESCRIPTION BY APPR'D

23AJ FTFA23-VH79 23AJ

23 OCT. 2024

AS SHOWN

DTRA RENOVATION

3RD FLOOR BLDG 13A

BASE CIVIL ENGINEER EGLIN

AIR FORCE BASE, FLORIDA

BWA

AD101

EXISTING / DEMOLITION PLAN

SCALE: 3/16" = 1'-0"

2'-8" 5'-4"0 10'-8"

1 05/22/25 RFI ADJUSTMENTS KRW PDM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SIGNATURE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

CENM

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJ. ENGR.

AutoCAD SHX Text

CONTENTS

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

SPEC. NO.

AutoCAD SHX Text

INDEX NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

96 CEG/CEN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

BASE CIVIL ENGINEER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SHEET OF

Sheets and Views
AD-101

File details come from the government source that posted it. Updated .