ODR Countertop and Cabinets_AF66_09102026.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
AMENDMENT 002 - ODR Countertop & Cabinets Replacement
Solicitation number
FA254326R0012
Issued by

About this file

This is an AF Form 66 Schedule of Material Submittals document for the ODR Countertop and Cabinets Replacement project at Buckley Space Force Base, dated 10 September 2026. The schedule outlines eight required contractor submittals with specific deadlines, reviewers, and approval requirements for the project managed by the Department of the Air Force Space Command.

The submittals include: (1) Project Work Schedule due 5 business days after kickoff meeting; (2) Counter and Cabinet Design Sketch due 10 calendar days after Notice to Proceed; (3) Countertop and Cabinet Color Samples due 15 calendar days after Notice to Proceed; (4) Ski Desk Product Details due 15 calendar days after Notice to Proceed; (5) Power and Internet Plug Layout due 15 calendar days after Notice to Proceed; (6) Final Walkthrough and "Fix-It" List due 3 business days after pre-final inspection; (7) 1-Year Warranty Letter due 5 business days after final inspection; and (8) Safety and Material Certificate due 5 business days after final inspection. All submittals require Project Manager review and approval/disapproval determination, with provisions for contractor resubmittal and final approval documentation. The form includes columns for submittal number, date received, civil engineering routing, return suspense dates, and remarks. This submittal schedule is associated with the single-phase installation of an ADA-compliant L-shaped front counter with three-tiered back-wall storage, two ski desks, electrical conduit routing, and plumbing hookups at the Buckley Space Force Base Outdoor Recreation Facility.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF66

SCHEDULE OF MATERIAL SUBMITTALSODR Countertop & Cabinets ReplacementDate: 10 September 2026
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF SUBITTALSREQUIRED SUBMISSION DATE (No Later Than)REVIEWER (PM/Insp)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEAF3000 SUBMITTAL NUMBERDATE CONTRACTOR NOTIFIED APPROVED / DISAPPROVEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
1Project Work Schedule15 BD after Kickoff MeetingPM
2Counter & Cabinet Design Sketch110 CD after NTPPM
3Countertop & Cabinet Color Samples115 CD after NTPPM
4Ski Desk Product Details115 CD after NTPPM
5Power & Internet Plug Layout115 CD after NTPPM
6Final Walkthrough & "Fix-It" List13 BD after pre-final inspectionPM
Closeout Documents
71-Year Warranty Letter15 BD after final inspectionPM
8Safety & Material Certificate15 BD after final inspectionPM
Additional Submittals
44
45
46
47
AF FORM 66, OCT 89